Dredging work of Padma River from km 33.300 to km 34.500 =1200.00M in connection with "Protection of Establishments from the Erosion of the Padma River on the left Bank at Charghat & Bagha Upazilla of Rajshahi District During the FY 2021-2022. Package no-DR-01/ Lot-DR-01/C.
DR-01/Lot-DR-01/C/e-GP/20241201/592246/00225668
|
Rajshahi O&M Division |
৳৩৫.০৪ কোটি |
৫ জুলাই ২০২১ |
Completed |
|
Repair of Damage pavement and Flood affected pavement by Semi-Grouting & Single Bituminous surface Treatment work at 8th 9th 10th 11th 12th13th 14th km & 15th km of Keraniganj Sayedpur - Hasara- Birtara - Kazalpur- Nagerhat Road Z-8203 under Munshiganj Road Division during the year 2020-2021
18/e-GP/mundivn/2020-2021/e-GP/20220308/514351/0056
|
Munshiganj Road Division |
৳৯৯.১০ লাখ |
১৬ নভে ২০২০ |
Completed |
|
Repair of Damage pavement and Flood affected pavement by Single Bituminous surface Treatment work at 2st 6th 7th 8th 9th 10th p 11th p 12th p km of Dohar - Katakhali - Nikra - Galimpur - Tikorpur Road Z-8206 under Munshiganj Road Division during the year 2020-2021
17/e-GP/mundivn/2020-2021/e-GP/20220314/514345/00217
|
Munshiganj Road Division |
৳১.২৮ কোটি |
১৬ নভে ২০২০ |
Completed |
|
Surfacing work providing DBST at 116th p to 120th p km. of Dhaka Jatrabari -Mawa-Bhanga-Barisal-Patuakhali Road N-8 under Barishal Road Division during the year 2020-2021.
03/e-GP/BRD/2020-2021./e-GP/20220626/485754/0015000
|
Barisal Road Division |
৳১.৮০ কোটি |
২৩ আগ ২০২০ |
Completed |
|
a Improvement of BC road from Masjid bari Sawnair bari Khat-uttar Carpal Jhama Masqe.via Dharabad GPS road at Ch.0.00-600m including 4 Nos. 0.625mx0.600m U-Drain Culverts under Banaripara Upazila Dist Barishal. ID No 506104057. b Improvement of BC road from Udaykati UPC via Gongamoni GPS-Murarbari Trimukhi Hat road at Ch.0.00-1000m including 02 Nos. 1x4.0mx4.0m RCC Box Culverts at ch. 517m & 754m and 01 No. 1.0mx1.0m RCC Box Culvert at ch. 582m & 01 No. 0.625mx0.600m U-Drain Culverts at ch. 180m under Banaripara Upazila Dist Barishal. ID No 506103012. c Improvement of BC road from Murarbari-Chowmohana hat road at Ch.0.00-700m under Banaripara Upazila Dist Barishal. ID No 506105019.
BJP/BAR/BAN/ DW-41/e-GP/20241215/239917/00235982
|
Office of the Executive Engineer, LGED, Barisal |
৳২.১৬ কোটি |
৩০ অক্টো ২০১৮ |
Completed |
|
a Improvement of BC road from Garoder Abu Taher dokan - Kachirunnessa Madrasha road at Ch.0.00-600m including 01 No. 1x4.0mx4.0m RCC Box Culvert at ch. 400m under Banaripara Upazila Dist Barishal. ID No 506105093. Salvage Cost Tk. 325461.00 b Improvement of BC road from Manik Miar hat-BBSG High School road at Ch.0.00-950m including 03 Nos. 0.625mx0.600m U-Drain Culverts at ch. 100m 210m & 290m under Banaripara Upazila Dist Barishal. ID No 506105130. c Improvement of BC road from Narattampur RHD to South Side of Sarder Bari Culvert via Al-Hera Cadet Madrasha road at Ch.0.00-807m including 01 Nos. 1x4.0mx4.0m RCC Box Culverts at ch. 807m & 01 No. 1.30mx1.30m RCC Box Culvert at ch.650m under Banaripara Upazila Dist Barishal. ID No 506104069.Total Salvaged Cost Tk 325461.00
BJP/BAR/BAN/ DW-42/e-GP/20241209/239918/00231810
|
Office of the Executive Engineer, LGED, Barisal |
৳২.২৩ কোটি |
৩০ অক্টো ২০১৮ |
Completed |
|
Pavement Repair and SBST work at 93rd94thP 96th and 97thP km of Bogra-Naogaon-Mohadevpur-Patnitala-Dhamoirhat-Joypurhat Road under Road division Naogaon during the year 2017-2018
e-GP/08/Rev/SE/Raj/2017-2018/e-GP/20220614/176749/006521
|
Rajshahi Circle |
৳৪৪.৯৯ লাখ |
১৫ মার্চ ২০১৮ |
Completed |
|
a Improvement of Mirdar Hat GC Bashtala Bazar - Poddar hat- dumuritala -Dhanu Shikder Hat GC Horinathpur Road from Ch.2150m - 4415m ID No.506692002 under Muladi Upazila Barisal District.b Construction of 1 Nos. 1vent 2.0m x 2.0m RCC box culvert on Mirdar Hat GC Bashtala Bazar - Poddar hat- dumuritala -Dhanu Shikder Hat GC Horinathpur Road at Ch.2800m.c Construction of 1 Nos. 1vent 2.0m x 2.0m RCC box culvert on Mirdar Hat GC Bashtala Bazar - Poddar hat- dumuritala -Dhanu Shikder Hat GC Horinathpur Road at Ch. 3900m.
BDRIDP/BAR/MUL/UZ-Rd/02/e-GP/20241208/161345/00229917
|
Office of the Executive Engineer, LGED, Barisal |
৳১.৫৫ কোটি |
১২ ফেব ২০১৮ |
Completed |
|
Improvement of road from Talukder HatKhejurtala Ali Sikder bari by BC Start Pokhi Rostom fokir bari to Nomor hat via Sumsun Nahar Chowdhury Bari at Ch.0.0m -1000mID No.506694016 under Muladi Upazila Barisal District.Salvaged Cost Tk 591644.00Improvement of road from Talukder HatKhejurtala Ali Sikder bari by BC Start Pokhi Rostom fokir bari to Nomor hat via Sumsun Nahar Chowdhury Bari at Ch.0.0m -1000mID No.506694016 under Muladi Upazila Barisal District.
BDRIDP/BAR/MUL/CCA-Rd/09/e-GP/20241208/161346/00229914
|
Office of the Executive Engineer, LGED, Barisal |
৳৫২.৯৭ লাখ |
১২ ফেব ২০১৮ |
Completed |
|
a. Improvement of Jhalokathi Kirtipasha RHD Road Shangramnila polish box Serangal hat via Keora UPSerangal hat Pakmohar School via Keora UP. Serangal School Tamatha and Advocate Khan Sayfullah Ponirer bari.road. ch.3246m-4279m. ID-542403011.b.Construction of 02no 2.0m2.0m culvert at ch 3240m & 3408m on the same road.c.Construction of 01no 4.75m Bridge at ch. 3522m on the same road.d. Construction of 01no. 9.0m Brigde at ch. 3916m on the same road.e.Construction of 01no 1.22m1.22m culvert at ch.3629m on the same roadSalvage Amount-1087133.00BDT
IRIDP-2/JLK/DW-57/e-GP/20241028/151717/00205202
|
Office of the Executive Engineer, LGED, Jhalokati |
৳১,২৭০.৬৫ কোটি |
৫ ফেব ২০১৮ |
Completed |
|
Repair of Existing Damaged Pavement by Carpeting Method & Premix Bituminous Seal Coat at 153rdp to 157th kmof Kashinathpur-Dasuria-Natore-Rajshahi-Nawabganj-Kansat-Sona Masjid-Baliadighi Border N6 Road under Road Division Rajshahi during the year 2017-2018
e-GP/06/Rev/SE/Raj/2017-2018 /e-GP/20220619/160753/008591
|
Rajshahi Circle |
৳৭৩.০০ লাখ |
৪ ফেব ২০১৮ |
Completed |
|
Periodic Maintenance of Kawria Bazar-Dhanu Sikder Hat Road from Ch. 3500m-6675m Hizla Road ID 506362002
e-Tender/LGED/Bari/GOBM/17-18/W-37/e-GP/20241215/141531/00235567
|
Office of the Executive Engineer, LGED, Barisal |
৳৫৬.৭৫ লাখ |
৬ ডিসে ২০১৭ |
Completed |
|
Periodic Maintenance of Mirdar hat GC Bashtala Bazar - Poddar Hat - Dumuritala - Dhanu Shikder Hat GC Horinathpur Road from Ch. 000m-2000m Muladi ID No. 506692002
e-Tender/LGED/Bari/GOBM/17-18/W-26/e-GP/20241215/141520/00235551
|
Office of the Executive Engineer, LGED, Barisal |
৳২৯.১৫ লাখ |
৬ ডিসে ২০১৭ |
Completed |
|
Periodic Maintenance of Shaestabad GC Barisal Sadar-Hizla Upzila HQ Via GazirhatKazirhat Gc Miarhat & Ekkoterhat Road from Ch. 000m-5011m Ch.5077m-5166m Ch. 5236m-5698m & Ch. 5760m-11632m Mehendiganj Road ID 506622008
e-Tender/LGED/Bari/GOBM/17-18/W-38/e-GP/20241215/141532/00235554
|
Office of the Executive Engineer, LGED, Barisal |
৳১.৫৭ কোটি |
৬ ডিসে ২০১৭ |
Completed |
|
Periodic Maintenance of Shaestabad GC Barisal Sadar-Hizla Upzila HQ Via GazirhatKazirhat Gc Miarhat & Ekkoterhat Road from Ch. 11632m-12160m & Ch. 12395m-14480m. Mehendiganj Road ID 506622008
e-Tender/LGED/Bari/GOBM/17-18/W-39/e-GP/20241210/141533/00232529
|
Office of the Executive Engineer, LGED, Barisal |
৳৪৮.৯২ লাখ |
৬ ডিসে ২০১৭ |
Completed |
|
Earth Work Widening of Pavement Surfacing 70mm DBS-BC & 50mm WC 7.30m CC Block Matteressing RCC U Drain Sign Signal KM Post & Road Marking at Ch 51420 to 56420 km of Rajshahi-Nowhata-Chowmashia-Road under Road Division Naogaon during the year 2017-2018 Pkg No. WP-06.
e-GP/RJZ/ADP/05/2017-2018/e-GP/20220614/121390/006540
|
Rajshahi Zone |
৳২৪.৫৫ কোটি |
২০ সেপ ২০১৭ |
Completed |
|
Improvement of BC road from Dudkhali UP Housdi Bazar - Dokkin Dudkhali GPS- Purbo Bidkhali GPS - Banglabazar Road Ch. 2012.00m-3593.00m Effective Length 1550.00m Under Dudkhali UP Madaripur Sadar Upazila Dist Madaripur. Road ID No- 354843032 354545046
GFRIDP-II/M/16-17VR-BR/542/e-GP/20220404/112295/00743
|
Office of the Executive Engineer, LGED, Madaripur |
৳৯১.৮৯ লাখ |
৩১ জুলাই ২০১৭ |
Completed |
|
Construction of 15.00m long RCC Girder Bridge on Ikrabari Lakhipur - Dodara Ikrabari & Laxmipur at Ch. 5195.00m near Dodara Mosque Under Rajoir Upazila Dist Madaripur. Road ID No- 354804100 354802013
GFRIDP-II/M/16-17/VR-SR/546/e-GP/20220404/112300/00742
|
Office of the Executive Engineer, LGED, Madaripur |
৳৬৪.৮৫ লাখ |
৩০ জুলাই ২০১৭ |
Completed |
|
Construction of 25.00m long PC Girder Bridge on Mirdhar Hat GC-Nazirpur GC at ch.8380km over Banimardhan khal under Muladi Upazila Barisal. ID No.506692004
BDRIDP/BAR/MUL/UZ-St/04/e-GP/20241211/96893/00233437
|
Office of the Executive Engineer, LGED, Barisal |
৳২.১২ কোটি |
২২ মে ২০১৭ |
Completed |
|
Part-A Improvement of Bousher Hat Bridge - Madha Karappur GPS road Ch.00m-1355m Part-BConstruction of 2 Nos 1.60mx1.60m Culvert at Ch. 804m & 1130m on the same Road ID No 506515092 Sadar Barisal
IRIDP-2/BRS/DW-115/e-GP/20241209/87614/00231445
|
Office of the Executive Engineer, LGED, Barisal |
৳৭৫.৪৬ লাখ |
২৮ ফেব ২০১৭ |
Completed |
|
Widening of existing pavement including strengthing surfacing protective work Traffic sign signal KM post guide post Road marking construction of 01 no. 44.02m PC Girder Alphadanga Bridge at Ch. 2.770 Construction of 01 No. 1x6.00x3.00x10.25m RCC Box Culvert at Ch. 3.500 of Sasrail-Alphadanga Road Z-7002 Ch 0.000 to Ch. 4.000 under Faridpur Road Division during the year 2016-2017.
E-GP-09/GZ/2016-17PMP Road/e-GP/20220606/83438/004578
|
Gopalgonj Zone |
৳১৪.৮৯ কোটি |
১৭ জানু ২০১৭ |
Completed |
|
Improvement of Goalando-Faridpur-Tarail Z- 7108 Road Project from 59th p km to 61st km providing Widening Strengtheing of Flexible Pavement Earth work from 47th p km to 61st km Retaining wall Guide wall palasiding Sign signals and km post at different km under Road Division Faridpur during the year 2016-2017.
E-GP-04/GZ/2016-17/e-GP/20220606/77687/004577
|
Gopalgonj Zone |
৳৮.৮৬ কোটি |
৩০ নভে ২০১৬ |
Completed |
|
Construction of 299.25m Long Bridge on Dhantara GC to Kakran Road over Dhaleswari river (Branch of Bangshi river) at Ch. 2+600KM (Road ID No.326142013) under Upazila: Dhamrai, Dist: Dhaka.
PD/CLBUURP/W-133/e-GP/2023918/63356/0084148
|
Office of the Executive Engineer, LGED, Dhaka |
৳৩৬.৮৩ কোটি |
১১ আগ ২০১৬ |
Completed |
|
Earth work for widening/raising of embankment, Strengthening, Surfacing Work, Construction of hard shoulder and Installation of Sign, Singal, Guide post and KM post of Godagari-Amnura-Nachole-Parbotipur-Adda Road from Ch. 0+000 to Ch.12+009 under Rajshahi Road division during the year 2015-2016 (Package no. WD-04).
11/e- GP/ADP/SE/Raj/2015- 16 /e-GP/20220514/55698/001800
|
Rajshahi Circle |
৳১৪.৩৯ কোটি |
২৮ এপ্রিল ২০১৬ |
Completed |
|
Overlay works at ch. 89.206 to ch. 115.50 of Dhaka-Mawa-Bhanga-Barisal -Patuakhali road.
E-PW-02/e-GP/20220404/29/00749
|
Gopalgonj Zone Office |
৳১৬.৪১ কোটি |
১০ অক্টো ২০১২ |
Completed |