Re-sectioning of embankment with slope protection work from Km. 10.220 to Km 10.820= 0.600 Km under the project "Permanent Rehabilitation of Damaged Embankment with Slope Protection work of Polder No-72 in Sandwip Upazilla Chattogram" under Chittagong O&M Division-2 BWDB Chittagong.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳৩৩.৭২ কোটি |
২২ আগ ২০২৪ |
|
Re-sectioning of embankment with slope protection work from Km. 10.820 to Km 11.520= 0.700 Km under the project "Permanent Rehabilitation of Damaged Embankment with Slope Protection work of Polder No-72 in Sandwip Upazilla Chattogram" under Chittagong O&M Division-2 BWDB Chittagong.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳৪৮.০৩ কোটি |
২২ আগ ২০২৪ |
|
Re-sectioning of embankment with slope protection work from Km. 12.370 to Km 12.790= 0.420 Km under the project "Permanent Rehabilitation of Damaged Embankment with Slope Protection work of Polder No-72 in Sandwip Upazilla Chattogram" under Chittagong O&M Division-2 BWDB Chittagong.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳২৮.৪৯ কোটি |
১১ এপ্রিল ২০২৪ |
|
Re-sectioning of embankment with slope protection work from Km. 16.200 to Km 16.700= 0.500 Km under the project "Permanent Rehabilitation of Damaged Embankment with Slope Protection work of Polder No-72 in Sandwip Upazilla Chattogram" under Chittagong O&M Division-2 BWDB Chittagong.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳৩২.৬৫ কোটি |
১০ মার্চ ২০২৪ |
|
Re-sectioning of embankment with slope protection work from Km. 13.600 to Km 14.150= 0.550 Km under the project "Permanent Rehabilitation of Damaged Embankment with Slope Protection work of Polder No-72 in Sandwip Upazilla Chattogram" under Chittagong O&M Division-2 BWDB Chittagong.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳৩৬.৮৬ কোটি |
১০ মার্চ ২০২৪ |
|
Re-sectioning of embankment with slope protection work from Km. 7.900 to Km 8.400= 0.500 Km under the project "Permanent Rehabilitation of Damaged Embankment with Slope Protection work of Polder No-72 in Sandwip Upazilla Chattogram" under Chittagong O&M Division-2 BWDB Chittagong.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳২৭.৩২ কোটি |
১৪ জানু ২০২৪ |
|
Re-sectioning of embankment with slope protection work from Km. 7.450 to Km 7.900 = 0.450 Km under the project "Permanent Rehabilitation of Damaged Embankment with Slope Protection work of Polder No-72 in Sandwip Upazilla Chattogram" under Chittagong O&M Division-2 BWDB Chittagong.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳২৪.৩০ কোটি |
১৪ জানু ২০২৪ |
|
Re-sectioning of embankment with slope protection work from Km. 6.900 to Km 7.450 = 0.550 Km under the project "Permanent Rehabilitation of Damaged Embankment with Slope Protection work of Polder No-72 in Sandwip Upazilla Chattogram" under Chittagong O&M Division-2 BWDB Chittagong.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳২৯.৬০ কোটি |
১৪ জানু ২০২৪ |
|
CONSTRUCTION OF 10 STORIED BOYS HOSTEL-1 BUILDING WITH 10 STORIED FOUNDATION
নেত্রকোণা · টেন্ডার →
|
Establishment of Sheikh Hasina University Project |
৳৯৭.৯৯ কোটি |
১৪ মে ২০২৩ |
|
CONSTRUCTION OF 10 STORIED GIRLS' HOSTEL-1 BUILDING WITH 10 STORIED FOUNDATION
নেত্রকোণা · টেন্ডার →
|
Establishment of Sheikh Hasina University Project |
৳৯৫.৯৮ কোটি |
১ মে ২০২৩ |
|
Slope protection of embankment and riverbank protective work at Fuljhuri Launch Ghat under Polder 41/6B from Km 19.450 to Km 19.700 = 0.250 Km in connection with "Rehabilitation of Polder 41/6A 41/6B & 41/7A and protection of vulnerable portion including Betagi town from the erosion of Bishkhali & Payra river under Barguna district" under Barguna O&M Division BWDB Barguna
বরগুনা · টেন্ডার →
|
Barguna O&M Division |
৳২৭.৪৯ কোটি |
২০ ডিসে ২০২২ |
|
Construction of 10-(Ten) Storied Faculty of Civil Engineering Building at RUET Rajshahi.
রাজশাহী · টেন্ডার →
|
Office of the Project Director |
৳৬৫.৩৪ কোটি |
২৯ জুন ২০২২ |
|
River bank protective work along the left bank of Meghna river from km150.987 to km 151.287 = 300 km in c/w "Protection work at the bank of Meghna river at Borokheri Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District" Project in Upazila-Kamalnagar Dist.-Lakshmipur under Lakshmipur O&M Division BWDB Lakshmipur during the year 2021-2022. (Package No.- Lak/W-24/Lot-3/2021-2022)
লক্ষ্মীপুর · টেন্ডার →
|
Laksmipur O&M Division |
৳২৭.১৫ কোটি |
২০ জানু ২০২২ |
|
Rehabilitation of Bank Revetment work on the left bank of the Padma River at Bakhar Ali from Km. 4.422 to Km. 5.012 = 590.00 M in connection with "Protection of Charbagdanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River" Project under Nawabganj O&M Division BWDB Chapainawabganj during the FY 2021-2022 & 2022-2023.
চাঁপাইনবাবগঞ্জ · টেন্ডার →
|
Nawabganj O&M Division |
৳১৬.১৩ কোটি |
১৯ জানু ২০২২ |
|
Rehabilitation of Bank Revetment work on the left bank of the Padma River at Bakhar Ali from Km. 6.612 to Km. 7.062 = 450.00 m in connection with "Protection of Charbagdanga and Shajahanpur area in sadar Upazilla of Chapainawabganj District from the erosion of the Padma River�????�???�??�?�¢??�????�???�??�?�¢?? under Nawabganj O&M Division BWDB Chapainawabganj during the FY 2021-2022 & 2022-2023 .
চাঁপাইনবাবগঞ্জ · টেন্ডার →
|
Nawabganj O&M Division |
৳১৭.৪৪ কোটি |
১৯ জানু ২০২২ |
|
River bank protective work along the left bank of Meghna river from km132.767 to km 133.042 = 0.275 km in c/w "Protection work at the bank of Meghna river at Borokheri Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District" Project in Upazila-Kamalnagar Dist.-Lakshmipur under Lakshmipur O&M Division BWDB Lakshmipur during the year 2021-2022. (Package No.- Lak/W-10/Lot-1/2021-2022)
লক্ষ্মীপুর · টেন্ডার →
|
Laksmipur O&M Division |
৳২৩.৩৭ কোটি |
১৬ জানু ২০২২ |
|
River bank protective work along the left bank of Meghna river from 133.042 to km 133.317 = 0.275 km including Stair (4nos)Umbrella Shed (4 nos) & Bench (4 nos) at Sheba gram (km 133.250) in c/w "Protection work at the bank of Meghna river at Borokheri Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District" Project in Upazila-Kamalnagar Dist.-Lakshmipur under Lakshmipur O & M Division BWDB Lakshmipur during the year 2021-2022. (Package No.- Lak/W-10/Lot-2/2021-2022)
লক্ষ্মীপুর · টেন্ডার →
|
Laksmipur O&M Division |
৳২৩.২৩ কোটি |
১৬ জানু ২০২২ |
|
River bank protective work along the left bank of Meghna river from km150.687 to km 150.987 = 300 km in c/w "Protection work at the bank of Meghna river at Borokheri Ludhua bazar and Kader ponditer hat areas in Ramgati and Kamal Nagar upazila under Lakshmipur District" Project in Upazila-Kamalnagar Dist.-Lakshmipur under Lakshmipur O&M Division BWDB Lakshmipur during the year 2021-2022. (Package No.- Lak/W-24/Lot-2/2021-2022)
লক্ষ্মীপুর · টেন্ডার →
|
Laksmipur O&M Division |
৳২৭.৮১ কোটি |
১৬ জানু ২০২২ |
|
Narsingdi Jail Purta-1C / 24. Construction of 1 no 3 storied Administrative Building Court Magazine and virtual court with 4 storied foundation 25. 1 no 3 storied interview Block (Male and Female) with 3 storied foundation 26. 1 no 1 storied Visitor waiting room with 1 storied foundation 27. 1 no 3 storied Bachelor officers quarter with 3 storied foundation 28-29. 1 no 4 storied 1250 sft & 100 sft residential building with 5 storied foundation 30. 1 no 5 storied 800 sft residential building with 5 storied foundation 32. 1 no 3 Storied Male Wardens Barrack (150 nos) with MI unit with 6 storied foundation 33. 2 nos 2 storied Store (12�???�??�?�¢?? height) with 2 storied foundation. 34. 1 no 1 storied Fuel Store (12�???�??�?�¢?? height) with 1 storied foundation. 35. 1 no 2 storied power sub-station with 1 storied foundation 36. 1 no.1 storied Pump house with 1 storied foundation 37. 1 no 2 Storied Guard House with 2 storied foundation 38. 1 no 1 storied Canteen with 1 storied foundation. 39. Saluting Dias. 40. Parade ground/Play ground 41. 4 nos. Observation Tower 42. Sewerage Treatment Plant 43. 1 no 1 storied Garage with 1 storied foundation 44. 1 no 2 storied Main gate with Sentry Box with 2 storied foundation 45. Open Space. 46. 1 nos 2 storied Mosque with 3 Storied foundation 47. Pond 48. 1 no 2 Storied Multipurpose shed with 4 storied foundation 56. RCC Road. 57. Culvert 58. Compound Drain 59. RCC Walkway. 64. Side Development under the project of Construction of Narsingdi District Jail Narsingdi. FY-2020-2021.
নরসিংদী · টেন্ডার →
|
Norshingdi PWD Division, Norshingdi |
৳৬০.০৪ কোটি |
২২ ডিসে ২০২১ |
|
CONSTRUCTION OF 4 STORIED ADMINISTRATIVE BUILDING WITH 4 STORIED FOUNDATION
নেত্রকোণা · টেন্ডার →
|
Establishment of Sheikh Hasina University Project |
৳১০৩.৭২ কোটি |
১৪ ডিসে ২০২১ |
|
Construction of BFDC Complex under Bangladesh Film Development Corporation during the year 2020-2021 2021-2022 2022-23 & 2023-2024.
ঢাকা · টেন্ডার →
|
Construction of BFDC Complex Project |
৳২৭৪.০৫ কোটি |
২ ডিসে ২০২১ |
|
Construction of 10-(Ten) Storied Faculty of Electrical & Computer Engineering Building at RUET Rajshahi.
রাজশাহী · টেন্ডার →
|
Office of the Project Director |
৳৬৪.৬২ কোটি |
২ নভে ২০২১ |
|
Construction of 10-(Ten) Storied Administrative Building at RUET Rajshahi.
রাজশাহী · টেন্ডার →
|
Office of the Project Director |
৳৩৭.৭৭ কোটি |
২ নভে ২০২১ |
|
Remaining Works of Construction of JOYNAGAR Building No. 05 Residential Flats for Govt./Semi-Govt. Officers at Section-15 Mirpur Dhaka.
ঢাকা · টেন্ডার →
|
Mirpur H&S Division-2 |
৳৩৬.৫২ কোটি |
৯ জুন ২০২১ |
|
River bank protection work on the left bank of the Padma river at Alaipur in Upazilla-Bagha District- Rajshahi from km. 40.900 to km. 41.300=400.00 m. under Rajshahi O&M Division BWDB Rajshahi during the year 2020-2021.
রাজশাহী · টেন্ডার →
|
Rajshahi O&M Division |
৳২৫.৮৮ কোটি |
১১ মে ২০২১ |
|
Revetment work on the right bank of Jamuna river from meterage 3600.00 to meterage 3900.00 = 300 meter at Baoikhola area of Kazipur Upazila in Sirajganj District under Sirajganj O&M Division BWDB Sirajganj.
সিরাজগঞ্জ · টেন্ডার →
|
Sirajganj O&M Division |
৳২১.৪৩ কোটি |
১৯ এপ্রিল ২০২১ |
|
Rehabilitation of erosion prone Sea-Dyke with slope protection work from Km. 13.100 to Km 13.600 total 0.500 Km in connection with Rehabilitation of Erosion prone area with slope protection work in Polder No. 72 Sandwip Chittagong under Chittagong O&M division-2 BWDB Chittagong . (Package No- CTG-2/SDP-4/Lot-3) during the year 2020-21.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳৮.৮৬ কোটি |
১৩ এপ্রিল ২০২১ |
|
Rehabilitation of erosion prone Sea-Dyke with slope protection work from Km. 12.600 to Km 13.100 total 0.500 Km in connection with Rehabilitation of Erosion prone area with slope protection work in Polder No. 72 Sandwip Chittagong under Chittagong O&M division-2 BWDB Chittagong . (Package No- CTG-2/SDP-4/Lot-2) during the year 2020-21.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳৮.৬১ কোটি |
১৩ এপ্রিল ২০২১ |
|
Rehabilitation of erosion prone Sea-Dyke with slope protection work from Km. 12.100 to Km 12.600 total 0.500 Km in connection with Rehabilitation of Erosion prone area with slope protection work in Polder No. 72 Sandwip Chittagong under Chittagong O&M division-2 BWDB Chittagong . (Package No- CTG-2/SDP-4/Lot-1) during the year 2020-21.
চট্টগ্রাম · টেন্ডার →
|
Chattogram O&M Division -2 |
৳৮.৩২ কোটি |
১৩ এপ্রিল ২০২১ |
|
Bank Revetment work on the left bank of the Padma River at Shajahanpur from km 9.275 to km 9.500 = 225.00 m in connection with
চাঁপাইনবাবগঞ্জ · টেন্ডার →
|
Nawabganj O&M Division |
৳১৪.২১ কোটি |
১৭ ফেব ২০২১ |
|
Bank Revetment work on the left bank of the Padma River at Shajahanpur from km 9.725 to km 9.950 = 225.00 m in connection with
চাঁপাইনবাবগঞ্জ · টেন্ডার →
|
Nawabganj O&M Division |
৳১৪.০২ কোটি |
১৭ ফেব ২০২১ |
|
Vertical Extension works from 16th floor to 19th floor including Civil Sanitary and Internal Electrical works with Attic RCC Parapet Lime-terracing Water tank of Modhumoti Tower at Traffic Complex Rajarbag Police Line Dhaka.
ঢাকা · টেন্ডার →
|
Dhaka PWD Division-1, Dhaka |
৳১৭.৬১ কোটি |
১৯ এপ্রিল ২০২০ |
|
Rehabilitation of erosion prone Sea-Dyke with slope protection work from Km. 0.500 to Km 1.100 total 0.600 Km in connection with Rehabilitation of Erroson prone area with slope protection work in Polder No. 72 Sandwip Chittagong under Chittagong O&M division-2 BWDB Chittagong during the year 2019-20
চট্টগ্রাম · টেন্ডার →
|
Chittagong O&M Division -2 |
৳১২.৪৬ কোটি |
১২ এপ্রিল ২০২০ |
|
Rehabilitation of erosion prone Sea-Dyke with slope protection work from Km. 0.000 to Km 0.500 = 0.500 Km in connection with Rehabilitation of Erroson prone area with slope protection work in Polder No. 72 Sandwip Chittagong under Chittagong O&M division-2 BWDB Chittagong during the year 2019-20.
চট্টগ্রাম · টেন্ডার →
|
Chittagong O&M Division -2 |
৳১০.৪৩ কোটি |
১২ এপ্রিল ২০২০ |
|
Precautionary Bank Protection work of Nababer Hat to Nandir Bazar Launch Ghat from km 0.500 to km 0.615 & km 0.800 to km 1.200 Total 515.00 m from erosion of the Arialkhan river in Muladi Upazilla Dist. Barisal under NDR Budget under Barisal O&M Division BWDB Barisal during the year 2019-20
বরিশাল · টেন্ডার →
|
Barisal O&M Division |
৳২.৫৪ কোটি |
১ এপ্রিল ২০২০ |
|
Construction of RCC drain (BADC mor to Mother Textile) from Mission gate to Nager Halot Jora Bridge. Ch.0+000 to 1+250
গাজীপুর · টেন্ডার →
|
PIU Office of Gazipur City Corporation |
৳১৩.৪৭ কোটি |
১৩ জানু ২০২০ |
|
A. Rehabilitation of road by BC and RCC drain from Simoltoli to Naga Bridge. Ch.0 to 0800.B. Rehabilitation of road by BC from Green Hospital to Sahapara. Ch.00 to 580m. & link01. ch00-21 D. Improvement of road by BC & RCC from BIDC bazar to Mohila Ghat. Ch.0 to 1850.E. Rehabilitation of Joydebpur Koler Bazar-Bangal Ghac connecting road by BC. Ch.0000 to 0600.F. Repairing of road by BC from Rajbari road to Sashan mor via Tankirpar. Ch.0000 to 1000.G. Re-construction of BC road from Talha Pukurpar to Mirjapur Kitchen Market at Ch.000 to 1+650m H. Rehabilitation of BC Road from Bahadurpur Sagor Market to Hazi Market Ch. 0000 to 0+ 810 m
গাজীপুর · টেন্ডার →
|
PIU Office of Gazipur City Corporation |
৳১২.৪৯ কোটি |
৫ জানু ২০২০ |
|
Remaining work of Repairing & widening of Road by BC from Bilaspur Bot-tola to Porabari Bazar of Dhaka-mymenshingh road via Salna Bazar & Jularpar Bazar. ( Bilaspur Bot-Tola to Salna Bazar ch.00+000-4+800)(Salna bazar to Jularpar Bazar Ch 04+800-07+500)( Jularpar Bazar to Porabari Bazar Ch.7+500-8+882m).
গাজীপুর · টেন্ডার →
|
PIU Office of Gazipur City Corporation |
৳৯.৯৭ কোটি |
১৫ ডিসে ২০১৯ |
|
1) Improvement of RCC Road from Salna bazar to Mojlishpur Itahata (ch.00-5472m).
গাজীপুর · টেন্ডার →
|
Construction of Internal road, drain & footpath in zone 1 to 5 of Gazipur city corporation. |
৳৩১.৬৩ কোটি |
১৩ নভে ২০১৯ |
|
Construction of 10-storied building at Abandoned House No-18/A-2 Road No-2 Nasirabad Housing Society 10- storied building at Abandoned House No-26/A-2 Road No-2 Nasirabad Housing Society 11- storied building at Abandoned House No-30/B-2 Road No-3 Nasirabad Housing Society 10- storied building at Abandoned House No-31/B-2 Road No-3 Nasirabad Housing Society and 9- storied building at Abandoned House No-16/461 Jamal Khan Lane Chattogram including Civil Sanitary Internal Electrification works etc. under Public Works Maintenance Division Chattogram through the Project titled as Construction of Residential Flats for Government Officers/Staffs at 36-Abandoned House in Chattogram.
ঢাকা · টেন্ডার →
|
Maintenance Circle , Dhaka |
৳৮১.৬৭ কোটি |
৪ নভে ২০১৯ |
|
Remaining works of construction of 16 (sixteen) storied Residential flat Buiding No-06 for selling to the limited income group of people at Block -F Mohammadpur H/E Dhaka under Dhaka Division-2 National Housing Authority Mohammadpur Dhaka
ঢাকা · টেন্ডার →
|
Dhaka Division -2 |
৳১৬.৯৯ কোটি |
২১ অক্টো ২০১৯ |
|
CONSTRUCTION OF 13TH STORIED EED HEAD OFFICE BUILDING WITH 13 STORIED FOUNDATION ALONG WITH TWO BASEMENT FLOOR IN/C. SANITARY WATER SUPPLY ELECTRIFICATION AND OTHER RELEVANT WORKS AT DHAKA METRODHAKA.
ঢাকা · টেন্ডার →
|
Office of the Executive Engineer, Dhaka Zone. |
৳১১৭.৯০ কোটি |
১৮ জুন ২০১৯ |
|
Precautionary Protective work for protection of Pamer Hat & Janater Hat from the erosion of the Kirtonkhola river from Km 0.00 to Km 0.250=250.00m and Km 0.500 to Km 0.750=250.00m (Total=500.00m) at Barishal Sadar upazila Barishal district under Barishal O & M division BWDB Barishal during the year 2018-2019.
বরিশাল · টেন্ডার →
|
Barisal O&M Division |
৳৫.৭০ কোটি |
২৩ মে ২০১৯ |
|
Construction of model Mosque and Islamic Cultural Center at Tahirpur Upozilla of Sunamganj District (Three storied building with three storied foundation B-type) (Sub head: civil works internal sanitary water supply electrical works and ancillary works of main building) under the project of �¢??Establishment of 560 model mosques and Islamic cultural centers in each district and Upozilla of Bangladesh�¢?�
সুনামগঞ্জ · টেন্ডার →
|
Sunamganj PWD Division |
৳১১.৮০ কোটি |
৩ এপ্রিল ২০১৯ |
|
Construction of model Mosque and Islamic Cultural Center at Chatak Upozilla of Sunamganj District Three storied building with three storied foundation B-type Sub head civil works internal sanitary water supply electrical works and ancillary works of main building under the project of Establishment of 560 model mosques and Islamic cultural centers in each district and Upozilla of Bangladesh
সুনামগঞ্জ · টেন্ডার →
|
Sunamganj PWD Division |
৳১১.০২ কোটি |
৩ এপ্রিল ২০১৯ |
|
Vertical extension of Circuit House in Jhenaidah(Type-1) ( Vertical extension of 2nd floor over existing 2storied building)
ঝিনাইদহ · টেন্ডার →
|
Jhenaidah PWD Division |
৳৩.১৬ কোটি |
২৬ নভে ২০১৮ |
|
Construction of Vertical Expansion of 2nd Floor of Mohendrapur Police Fari at Rajbari District(CivilSanitary and Electric Works)
যশোর · টেন্ডার →
|
Jessore PWD Circle |
৳৬১.৬০ লাখ |
২৩ এপ্রিল ২০১৮ |
|
Renovation Repair and Maintenance of District Shilpakala Academy at Jhenidah (SH: Supply & Installation Acoustics with sound profing at Auditorium Building) under 15 (fifteen) district Shilpakala Academy Project.
ঝিনাইদহ · টেন্ডার →
|
Jhenaidah PWD Division |
৳৪৭.৮০ লাখ |
২০ মার্চ ২০১৮ |
|
Establishment and Extension of Hostel for the Visually Impaired Chidren (Girls-06 Boys-11 & Extension16 Units) project One at Adorso High School Chuadanga Sub-Head : Civil Sanitary Internal Electrification Deep Tube well Underground Reservoir RCC Road Boundary wall External Electrification)
চুয়াডাঙ্গা · টেন্ডার →
|
Chuadanga PWD Division |
৳১.৭৮ কোটি |
১৫ জানু ২০১৮ |