Construction of 04 Nos Bridges (1) 34.88 Meter (1x33.54 m) Long P.C. Girder Bridge at 49th KM (Ch:48+825 m) (2) 34.88 Meter (1x 33.54 m) Long P.C. Girder Bridge at 53th KM (Ch:52+155 m) (3) 19.64 Meter (1x 18.30 m) Long RCC Girder Bridge at 54th KM (Ch:53+215 m) (4) 34.88 Meter (1x 33.54 m) Long P.C. Girder Bridge at 55th KM (Ch:54+355 m) & 10 Nos Culverts SC-01C-03C-05C-07 & C-13C-14C-01C-02C-04C-06 and Flexible pavement at Ch. 46+820 to 47+070 on Sunamganj-Madanpur-Dirai-Shullah-Ajmiriganj-Habiganj Road (Z-2807) (Sullah-Jolshuka portion) under Sunamganj Road Division during the year 2025-2026. (Package No.WD-07)
সুনামগঞ্জ · টেন্ডার →
|
Sunamganj Road Division |
৳৮৫.৫৬ কোটি |
২৫ আগ ২০২৬ |
|
Periodic maintenance programme by Surface repair Profile Correction DBS Base Course and DBS Wearing Course at 0+000 km (Kazla) to 3+600 km (Signboard Koba Masjid) and 4+350 km (Proactive Medical) to 5+000 km (Sanarpar) of Dhaka (Jatrabari)-Cumilla (Mainamati)-Chattogram-Teknaf Road (N1) under Narayanganj Road Division during the year 202-2026.
নারায়ণগঞ্জ · টেন্ডার →
|
Narayanganj Road Division |
৳২২.৮৬ কোটি |
২০ আগ ২০২৬ |
|
Periodic Maintenance Programme (PMP-Major Road) Providing by construction of Rigid Pavement from Ch. 5+400 to Ch. 5+800 Ch. 6+250 to Ch. 7+200 & Ch. 14+300 to Ch. 14+985 Total Length = 2035.00m of Khulna-Chuknagar-Satkhira National Highway (N-760) under Road Division Khulna during the year 2025-2026.
খুলনা · টেন্ডার →
|
Khulna Road Division |
৳২২.৪২ কোটি |
২০ আগ ২০২৬ |
|
Strengthening & DBS Wearing Course work under PMP (Major-Road) at Ch.0+000 (Jhenaidah Bus Terminal) to Ch.4+570 (Truck Terminal) of Jhenaidah Bus Terminal-Arappur Intersection-Alhera Busstand Road (N-712) under Road Division Jhenaidah during the year 2025-2026.
ঝিনাইদহ · টেন্ডার →
|
Jhenaidah Road Division |
৳২২.২২ কোটি |
২০ আগ ২০২৬ |
|
Periodic Maintenance Program (PMP) for DBST Work including Surfacing Repair by DBS-Base Course and other Ancillary Works at Ch. 4+014 (Binadingi) to 20+000 (Garadia) and ch.28+000 (Outpara) to 31+020 ( Bewtha Mor) of Hemayetpur - Singair - Manikganj Road (R-504) under Manikganj Road Division during the year 2025-2026.
মানিকগঞ্জ · টেন্ডার →
|
Manikganj Road Division |
৳১৩.৩০ কোটি |
২০ আগ ২০২৬ |
|
PMP Major works for construction of service lane from ch. 0+000 m to ch. 3+000 m of Jatrabari-Demra-Shimrail-Narayanganj (Chasara) Road (R-110) under Road Division Narayanganj during the year 2024-2025.
নারায়ণগঞ্জ · টেন্ডার →
|
Narayanganj Road Division |
৳১২.৩৩ কোটি |
২০ আগ ২০২৬ |
|
Periodic Maintenance Programme providing Rut Cutting by Milling Machine and Surfacing with DBS-Wearing Course from Ch: 7+360 (Hemayetpur) to 12+000 (Genda) of Dhaka-Aricha National Highway (N-5) under Dhaka Road Division during the year 2025-2026.
ঢাকা · টেন্ডার →
|
Dhaka Road Division |
৳১৯.৫১ কোটি |
১১ আগ ২০২৬ |
|
Construction of Rigid Pavement at Katakhali Intersection at Ch. 222+944 Km of Daulatdia-Faridpur (Goalchamot)-Magura-Jhenaidah-Jessore-Khulna-Mongla (Digraj) (N-7) National Highway (Crossing point of N-7 & N-805) and Noapara Intersection at Ch.108+852Km of Bhanga-Bhatiapara-Mollahat-Fakirhat-Noapara (N-805) National Highway (Crossing point of N-805 & N-807) under Road Division Bagerhat during the year 2025-2026.
বাগেরহাট · টেন্ডার →
|
Bagerhat Road Division |
৳১৭.১৯ কোটি |
৯ আগ ২০২৬ |
|
Repairing of Mograpara (Sonargaon College)-Kaikertek-Nabiganj Road (Z-1066) from Ch. 0+000 Km to 7+600 Km by Overlay and Necessary Repair Work Under Narayanganj Road Division during the year 2024-2025
নারায়ণগঞ্জ · টেন্ডার →
|
Narayanganj Road Division |
৳৭.৫৪ কোটি |
৬ জুলাই ২০২৬ |
|
Construction of Rigid Pavement (4-Lane) Widening RCC Box Culvert & Construction of RCC U-Drain at 19+755 km to 21+825 km of Joypurhat-Panchbibi-Hili Road (Z-5503) and at 0+000 km to 0+200 km of Hili-Dugdugi-Ghoraghat Road (N-521) Under Road Division Dinajpur During the year 2025-2026. (WP-06)
দিনাজপুর · টেন্ডার →
|
Dinajpur Road Division |
৳৪৮.৮৮ কোটি |
২৮ জুন ২০২৬ |
|
Periodic Maintenance Programme for providing partial Widening Strengthening Surfacing and Rigid Pavement at Chainage 0+580 to 1+900 and Chainage 11+000 to 16+871 km of Sherpur-Kaigari-Nandigram Road (Z-5034) under Road Division Bogura during the year 2025-2026.
বগুড়া · টেন্ডার →
|
Bogra Road Division |
৳২৬.০০ কোটি |
২০ এপ্রিল ২০২৬ |
|
Periodic Maintenance (PMP) Road for Rigid Pavement and RCC U Drain work at (Ch: 10+700 to 12+700 = 2000.00m) of Bheramara-Daulatpur (Z-7411) Road under Road Division Kushtia during the�??�?� year�??�?� 2025-2026
কুষ্টিয়া · টেন্ডার →
|
Kushtia Road Division |
৳২৪.৪৪ কোটি |
১২ এপ্রিল ২০২৬ |
|
PMP (Major-Bridge) work for Construction of 01 Nos P.C Girder Bridge (Pachuria Bridge) 25.74m(1x24.40m) Long Span at 39th km( Ch: 38+082m) of Takerhat-Gopalganj (Haridaspur)-Mollahat (Ghonapara) Road (R-850) under Road Division Gopalganj during the fy 2025-2026.
গোপালগঞ্জ · টেন্ডার →
|
Gopalganj Road Division |
৳৭.৪০ কোটি |
১২ এপ্রিল ২০২৬ |
|
Periodic Maintenance Programme (PMP Major Bridge/Culvert) for Re-Construction of 01 No. 31.828m Long P.C Girder Bridge (Hiron) at Ch:15+567m on Tungipara-Kotalipara (Majbadi) Road (Z-8430) under Gopalgonj Road Division Gopalganj. during the Year 2023-2024.
গোপালগঞ্জ · টেন্ডার →
|
Gopalganj Road Division |
৳৯.১১ কোটি |
১২ এপ্রিল ২০২৬ |
|
Installation of 2 (Two) Nos Single Span Overhead Gantry 2 (Two) Nos Double Span Overhead Gantry Sign 68 (Sixty Eight) Nos Cantilever Sign at different km of Bogura (Jahangirabad)-Natore National Highway (N-502) road under Natore and Bagura Road Division during the year 2025-2026.
নাটোর · টেন্ডার →
|
Natore Road Division |
৳৩.০৬ কোটি |
২৫ ফেব ২০২৬ |
|
i). Improvement of road from Gopaldi GC to Mollarchar RHD (Ch.0 - 3700m) (Road ID # 367022005); ii). Construction of 24m RCC bridge at Ch. 2104m on the road (Road ID # 367022005); iii). Construction of 3 Nos. Ghat.under upazila: Araihazar District:Narayanganj.
নারায়ণগঞ্জ · টেন্ডার →
|
Office of the Executive Engineer, LGED, Narayanganj |
৳১৫.৪৫ কোটি |
২ ফেব ২০২৬ |
|
Supply of Plant Produced Asphalt Materials for Routine Repairing of Potholes Edge Breaking Depression Undulation etc. at different portion of Different Road of Nayarhat Road Sub-Division under Road Division Manikganj during the year 2025-2026.
মানিকগঞ্জ · টেন্ডার →
|
Manikganj Road Division |
৳২৮.২০ লাখ |
৫ জানু ২০২৬ |
|
Widening & Strengthening of Pipulia-Hazatkhala-Bagmara Road Ch. 00-6455m. Road ID No: 419912001 under Lalmai Upazila Cumilla District (Value of Recovered Material Tk= 3911331.00)
কুমিল্লা · টেন্ডার →
|
Office of the Executive Engineer, LGED, Cumilla |
৳১৫.২১ কোটি |
২৪ ডিসে ২০২৫ |
|
Widening of Bazar Area construction of drain bus-bay and DBS Overlay at Ch: 276+030 km. to Ch: 276+130 km. Ch:296+610 km. to Ch: 297+060 km. (Padua Bazar) and Ch: 300+150 km. to Ch: 301+300 km (Lohagara-Amirabad) of Dhaka (Jatrabari)- Cumilla (Moinamati)-Chattogram-Cox's Bazar-Teknaf National Highway (N-1) under Chattogram South Road Division during the year 2024-2025.
চট্টগ্রাম · টেন্ডার →
|
Chattogram South Road Division |
৳১১.২৪ কোটি |
২৩ নভে ২০২৫ |
|
PMP Works for Repairing of Damaged Choto Feni Nodi bridge (Noakhali End) Scour Protection at 6th Km. of Sonagazi-Olamabazar-Chardarbeshpur-Companigonj Road (Z-1434) under Noakhali Road Division During the year 2024-2025.
নোয়াখালী · টেন্ডার →
|
Noakhali Road Division |
৳৪.৮৪ কোটি |
১৭ নভে ২০২৫ |
|
Supplying of Asphalt materials for Departmental Routine maintenance work of different Roads of Section-3 of Narayanganj Road Sub-Division-2 under Narayanganj Road Division during the FY-2023-2024.
ঢাকা · টেন্ডার →
|
Narayanganj Road Division |
৳২৯.১০ লাখ |
১৫ ফেব ২০২৪ |
|
Supplying of Asphalt materials for Departmental Routine maintenance work of different Roads of Section-1 of Narayanganj Road Sub-Division-1 under Narayanganj Road Division during the FY-2023-2024.
ঢাকা · টেন্ডার →
|
Narayanganj Road Division |
৳২৯.৫০ লাখ |
১৫ ফেব ২০২৪ |
|
i Improvement of road from South West Corner of Bata Shoe Company to Bangshi River at Saibaria (Ch. 0 - 1565m); ii Construction of drain from South West Corner of Bata Shoe Company to Bangshi River at Saibaria (Ch. 10 - 1025m); iii Improvement of road from Kaliagar Protiva School to Islampur Rishipara (Ch.0 - 920m) including 75m link road; iv Re-construction of drain from Kaliagar Protiva School to Islampur Rishipara (Ch. 0 - 990m) including 75m link drain; v Improvement of road from Dhamrai Bazar to Bangshi River at Kagojipara (Ch. 310 - 1295m) including 370m link road; vi Re-construction of link drain (Ch.0-300m) of the road from Dhamrai Bazar to Bangshi River at Kagojipara
ঢাকা · টেন্ডার →
|
PIU Office of Dhamrai Pourashava, Dhaka |
৳১৭.৯৯ কোটি |
১৫ ফেব ২০২৪ |
|
Supplying of Asphalt materials for Departmental Routine maintenance work of different Roads of Section-3 of Vitikandi Road Sub-Division under Narayanganj Road Division during the FY-2023-2024.
ঢাকা · টেন্ডার →
|
Narayanganj Road Division |
৳২৯.৬০ লাখ |
১৫ ফেব ২০২৪ |
|
Supplying of Asphalt materials for Departmental Routine maintenance work of different Roads of Section-2 of Vitikandi Road Sub-Division under Narayanganj Road Division during the FY-2023-2024.
ঢাকা · টেন্ডার →
|
Narayanganj Road Division |
৳২৯.৯০ লাখ |
১৫ ফেব ২০২৪ |
|
Supplying of Asphalt materials for Departmental Routine maintenance work of different Roads of Section-1 of Narayanganj Road Sub-Division-2 under Narayanganj Road Division during the FY-2023-2024.
ঢাকা · টেন্ডার →
|
Narayanganj Road Division |
৳২৯.৮০ লাখ |
১৫ ফেব ২০২৪ |
|
Supplying of Asphalt materials for Departmental Routine maintenance work of different Roads of Section-3 of Narayanganj Road Sub-Division-1 under Narayanganj Road Division during the FY-2023-2024.
ঢাকা · টেন্ডার →
|
Narayanganj Road Division |
৳২৯.৯০ লাখ |
১৫ ফেব ২০২৪ |
|
Supplying of Asphalt materials for Departmental Routine maintenance work of different Roads of Vitikandi Road Sub-Division under Narayanganj Road Division during the FY-2023-2024.
ঢাকা · টেন্ডার →
|
Narayanganj Road Division |
৳২৯.৫০ লাখ |
৩০ নভে ২০২৩ |
|
Earth workWidening Strengthening Surfacing (5.50m) Rigid pavement (7.30m) U/surface/Saucer drain Toe/Guide wall Sign Signal KM post Road marking work from Ch. 0+000 Km (Jharaborsha Tinmatha More) to 7+200 Km (Barokona Bazar) of Saghata-Barokona-Jummarbari-Sonatola Road (Z-5036) under Road Division Gaibandha during the year 2022-2023.
রংপুর · টেন্ডার →
|
Rangpur Zone |
৳২০.৮৪ কোটি |
১৬ অক্টো ২০২৩ |
|
Construction of RCC U-drain & Removal of sludge or semi-liquid clay or substances etc remove Works at 11th(P) Km (Nayabari U-Turn Portion) of Dhaka (Jatrabari)-Cumilla (Mainamati) -Chattagram-Teknaf Road (N1) Under Narayanganj Road Division During the FY 2022-2023.
ঢাকা · টেন্ডার →
|
Narayanganj Road Division |
৳৮৯.৯০ লাখ |
৩০ আগ ২০২৩ |
|
Re-Construction of Culvert Re-Construction and Surfacing work of Approach road Construction of Rigid Pavement and U-Drain Protective work Installation of Sign and Signal at Dinajpur-Bochaganj-Bakultala road (Z-5006) Rangpur-Badarganj-Parbatipur-Dinajpur road (R-554) and Thakurgaon-Nekmard-Pirganj-Birganj road (Z-5002) under Road Division Dinajpur during the year 2022-23 (WP-04).
দিনাজপুর · টেন্ডার →
|
Dinajpur Circle |
৳৯৪.৪৪ কোটি |
২৬ জুন ২০২৩ |
|
Construction of Extending Box Culvert with RCC Retaining Wall at 12th km (Madanpur Intersection) of Dhaka(Jatrabari) - Cumilla (Mainamati) - Chattogram - Teknaf Road (N-1) under Narayanganj Road Division during the FY 2022-2023.
ঢাকা · টেন্ডার →
|
Narayanganj Road Division |
৳৩.৩১ কোটি |
১১ জুন ২০২৩ |
|
Re-construction of Road Pavement Rigid Pavement Bridge Culvert & Protective work from Ch. 42+000 to 49+000 of Jamalpur (Madargonj)-Koyra- Monsurnagar(Kazipur)-Abdullah More (Sarishabari)-Tangail (Dhanbari) Road (Z-4029) Under Tangail Road Division during the year 2021-2022. (WP-06)
জামালপুর · টেন্ডার →
|
Jamalpur Circle |
৳৪৯.০০ কোটি |
৪ এপ্রিল ২০২৩ |
|
Re-construction of Flexible Pavement Construction of Rigid pavement Construction of Bridge & Culvert and Protective work from Ch. 09+000 to Ch. 18+000 KM of Jamalpur (Madarganj)-Koyra-Mansurnagar (Kazipur)-Abdullah More (Sarishabari)-Tangail (Dhanbari) Zilla Highway (Z-4029) under Jamalpur Road Division (WP-2).
জামালপুর · টেন্ডার →
|
Jamalpur Circle |
৳৬৮.০০ কোটি |
৬ মার্চ ২০২৩ |
|
Name of Work : Widening Strengthening Surfacing RCC 'U' Drain & Rigid Pavement Work etc at Ch: 89+500 to 111+605 Km of Bogura-Naogaon-Mohadevpur-Patnitala-Dhamoirhat-Joypurhat Road (R-545) Under Road Division Naogaon During the Year 2022-2023. (WP-08)
রাজশাহী · টেন্ডার →
|
Rajshahi Circle |
৳৮৯.৮৮ কোটি |
৫ ফেব ২০২৩ |
|
Repair Rut Cutting & Profile correction for Tyre way depression undulation on damaged pavement by DBS-Base Course at 11th km (p) 12th km (p) 13th km (p) 14th km (p) 15th km (p) 16th km (p) 17th km (p) 18th km (p) 19th km (p) & 20th km (p) of Dhaka(Jatrabari)-Cumilla(Maynamati)-Chattogram-Teknaf Road (N1) under Narayanganj Road Division during the FY 2022-2023.
নারায়ণগঞ্জ · টেন্ডার →
|
Narayanganj Road Division |
৳৯৯.৫০ লাখ |
৩০ জানু ২০২৩ |
|
Repair Rut Cutting & Profile correction for Tyre way depression undulation on damaged pavement by DBS-Base Course at 31st km (p) 32rd km (p) 33th km (p) 34th km (p) 35th km (p) 36th km (p) 38th km (p) & 39th km (p) of Dhaka(Jatrabari)-Cumilla(Maynamati)-Chattogram-Teknaf Road (N1) under Narayanganj Road Division during the FY 2022-2023.
নারায়ণগঞ্জ · টেন্ডার →
|
Narayanganj Road Division |
৳৯৯.০০ লাখ |
৩০ জানু ২০২৩ |
|
Repair Rut Cutting & Profile correction for Tyre way depression undulation on damaged pavement by DBS-Base Course at 22nd km (p) 23rd km (p) 24th km (p) 25th km (p) 26th km (p) 27th km (p) 28th km (p) 29th km (p) & 30th km (p) of Dhaka(Jatrabari)-Cumilla(Maynamati)-Chattogram-Teknaf Road (N1) under Narayanganj Road Division during the FY 2022-2023.
নারায়ণগঞ্জ · টেন্ডার →
|
Narayanganj Road Division |
৳৯৯.০০ লাখ |
৩০ জানু ২০২৩ |
|
Periodic Maintenance of Barabari-Lalmonirhat-Burimari Road (N-509) under Road Division Lalmonirhat through Strengthening with Aggregate base type-I and Surfacing (DBS-Base course 70 mm & DBS-Wearing course-50 mm) from Ch. 7+000(Mahendranagar Bazar) to Ch.8+800(Lalmonirhat Airbase) & Ch. 10+000(Lalmonirhat Airbase) to Ch.12+575 (Shimanto Mor) under PMP (Road- Major) during the year 2022-2023
রংপুর · টেন্ডার →
|
Rangpur Zone |
৳১৫.৫৬ কোটি |
৮ জানু ২০২৩ |
|
Strengthening with Base Type-I Providing DBS wearing course & RCC Palisiding at 0+000 to 8+140 km of Sharda bazar-Shadipur-Sholua-Malekar mor (Z-6018) Road & Strengthening with Base Type-I Providing DBS Base & DBST at 0+000 to 3+300 km of Shibpur-Durgapur-Taherpur (Z-6005) Road under RHD Road Division Rajshahi During the year 2022-2023.
রাজশাহী · টেন্ডার →
|
Rajshahi Circle |
৳১১.৫৬ কোটি |
২২ ডিসে ২০২২ |
|
Construction of Hard Shoulder by Periodic Maintenance Program (PMP-Major) Including surfacing work (DBS Base Course and DBS Wearing Course work) at Ch. 386+222 (Vusirbandar) to Ch. 390+522 (Bankali) of Dhaka ( Mirpur) -Utholi-Paturia- Notakhola-Kashinathpur- Bogura-Rangpur-Beldanga- Banglabandha Road (N-5) under Road Division Dinajpur during the year 2022-2023
রংপুর · টেন্ডার →
|
Rangpur Zone |
৳১৫.৩৩ কোটি |
৬ ডিসে ২০২২ |
|
Construction of 76.01m (3x24.40m) Long PC Girder Bridge (Ghaghat Bridge-01) at 1st (P) km (Ch. 00+148.00m) 75.99m (2x15.25+42.68m) Long RCC & PC Girder Bridge (Ghaghat Bridge-02) at 1st (P) km (Ch. 00+888.00m) 44.02m (1x42.68m) Long PC Girder Bridge (Matherhat Bridge) at 14th(P) km (Ch.13+307.00m) 25.74m (1x24.40) Long PC Girder (Bazarpara Bridge) at 27th(P) km (Ch.26+807.5 km) 31.828m (1x30.488) Long PC Girder) (Halhalai Bridge) at 32th(P) km (Ch.31+259.69 km) of Gaibandha-Sundorgonj-Pirgacha (Kadomtoly) Road (Z-5613) and 44.020m (1x42.68) Long PC Girder Bridge (Shakdaho Bridge) at 27th km (Ch.26+719) of Gaibandha-Gobindaganj via Nakahihat Road (Z-5554) Under Road Division Gaibandha During The Year 2022-2023 (WP-10)
রংপুর · টেন্ডার →
|
Rangpur Zone |
৳৬২.৫৬ কোটি |
৬ ডিসে ২০২২ |
|
Supplying of Asphalt materials & Cold applied instant patching premix asphalt for Departmental Routine maintenance work of different Roads under Narayanganj Road Division during the FY-2022-2023.
নারায়ণগঞ্জ · টেন্ডার →
|
Narayanganj Road Division |
৳২৯.৯০ লাখ |
২২ নভে ২০২২ |
|
Construction of 44.02m (1x42.68m) long P.C Girder Turag Uttarpara Mugrakanda Bridge-2 at 1st K.M (Ch. 00+648m) 24.0m (2X 12.0m) Long R.C.C Slab AWALL MARKET Bridge at 4th K.M. (CH. 3+360m) & 25.74m (1x24.40m) Long P.C Girder Bottole Bazar Bridge at 6th K.M (Ch. 5+800m) with ancillary work on Turag- Ruhitpur-Bourvity Road (Z-5069) under Dhaka Road Division Dhaka during the yeare 2021-2022 [WP-3]
ঢাকা · টেন্ডার →
|
Dhaka Zone |
৳৩১.৭৮ কোটি |
২৯ সেপ ২০২২ |
|
Periodic Maintenance Programme (PMP-Major/2021-2022) DBST works including widening of existing pavement with DBS-Base Course from Ch. 34+621 to 55+169 (Total Length - 20548.00m) of Bhatiapara-Kalna-Lohagara-Narail-Jashore Road (N-806) under Jashore Road Division during the year 2021-2022.
খুলনা · টেন্ডার →
|
Khulna Zone |
৳৩৫.৫৬ কোটি |
১৩ সেপ ২০২২ |
|
Periodic Maintenance Programme providing pavement re-construction and DBS wearing course works at Ch. 6+000 to Ch. 8+800 of Chinakhora-Sujanagar Road (Z-6024) and Ch. 6+817 to Ch. 10+784 of Ataikula-Sujanagar Road (Z-6030) under Pabna Road Division during the year 2021-2022.
রাজশাহী · টেন্ডার →
|
Rajshahi Zone |
৳১৭.৭৮ কোটি |
২১ জুলাই ২০২২ |
|
Periodic Maintenance Programme (PMP-Major Road) providing Widening Strengthening Surfacing with DBS- Base and Wearing Course Construction of Rigid Pavement Sign-Signal Km Post Road Marking from Ch: 210+790m (Ferryghat More) to Ch: 213+730m (Old Rupsha Ferryghat More) (Total Length = 2940.00m) of Daulatdia-Faridpur (Goalchamot)-Magura-Jhenaidah-Jashore-Khulna-Mongla (Digraj) Road (N-7) under Road Division Khulna during the year 2021-2022.
খুলনা · টেন্ডার →
|
Khulna Zone |
৳২৫.৫৬ কোটি |
১৭ জুলাই ২০২২ |
|
Construction of 28.78m ( 1x 27.44m) Long 4 Lane P.C Girder Bridge (Madonpur Bridge) Including U-Loop at 12th km Ch.11+742.27m) on Dhaka(Jatrabari) - Cumilla(Maynamati) - Chattagram - Teknaf Road (N-1) under Narayanganj Road Divisionduring the FY 2021-2022.
নারায়ণগঞ্জ · টেন্ডার →
|
Narayanganj Road Circle |
৳১৩.৩৩ কোটি |
৬ জুলাই ২০২২ |
|
Supplying of cold Asphalt materials & cold applied instant patching premix asphalt for Departmental Routine maintenance work of different Roads under Narayanganj Road Division during the FY 2021-2022.
নারায়ণগঞ্জ · টেন্ডার →
|
Narayanganj Road Division |
৳১৯.৮০ লাখ |
২০ জুন ২০২২ |
|
widening Strenthening and Surfacing work from ch.21+440 to ch.60+780 km of Bamondanga (Gaibandha)-Shathibari-Aftabgonj (Dinajpur) Road (Z-5013) under Road Division Rangpur During the year 2021-2022.
রংপুর · টেন্ডার →
|
Rangpur Road Division |
৳৪৫.৫৬ কোটি |
২৩ মে ২০২২ |