|
Construction of Additional class room CHAMTA MIRZAPUR GPS under PEDP4, Nagarpur, Tangail.
e-Tender/PEDP4/TNG/NAG/2020-21/W2-03720/e-GP/20231129/622887/00143938
|
Office of the Upazila Engineer, LGED, Nagarpur, Tangail |
৳৮৫.২৬ লাখ |
১৫ নভে ২০২১ |
Ongoing |
|
Rehabilitation of Sakhipur-Batajor Road form Ch. 000-9220m (ID No. 393852008) Under Sakhipur Upazila, District : Tangail.
TAN/AF-145/e-GP/20231029/578852/00118512
|
Office of the Executive Engineer, LGED, Tangail |
৳১৩.২৭ কোটি |
২০ মে ২০২১ |
Completed |
|
Construction of Submersible Rigid Pavement for Petrobangla Point Kayrabari Shaharbari Road from Ch.00 - 1000m & Ch. 2000m 3000m under Upazila Singra Dist. Natore. Road ID No. 169914043
IRIDP-3/NTR/DW-10/e-GP/20240919/535004/00178786
|
Office of the Executive Engineer, LGED, Natore |
৳৩.১৬ কোটি |
১৪ জানু ২০২১ |
Completed |
|
A R-06 Construction of RCC Road from Prof. Asraf house to Tower Road at Chandpur Ward No. 04 under Singra Paurashava Ch. 000 - 0340.00m.B D-02 Construction of RCC Drain with Slab from Ashraf house to Tower Road at Chandpur Ward No. 04 under Singra Paurashava Ch. 000 - 0340m.C R-05 Construction of RCC Road from Shahanaj house to Mohasin house at Kantapukuria Ward No-01 under Singra Paurashava Ch. 000 - 0235m.Link Abu Bakkar Siddique House Road Ch. 000-0115.00m.
UIIP-BC/PCO/W-226/e-GP/20240930/471300/00187833
|
PIU Office of Singra Pourashava, Natore |
৳১.১৩ কোটি |
২৭ জুলাই ২০২০ |
Completed |
|
Rehabilitation of NHW Mowchak-Fulbaria GC Road Ch.2050m-21200m Under Kaliakoir Upazila District Gazipur.ID333322005
GAZ/AF-40/e-GP/20231118/459454/00129792
|
Office of the Executive Engineer, LGED, Gazipur |
৳১৫.২১ কোটি |
১৪ মে ২০২০ |
Completed |
|
1 Details Estimate for Supply of ComputerLED MonitorDextopUPSColour PrinterEpson L3110Pendrive-62GB and Sanitary worksOffice Table at Ghasigram Union Parishad Desital Centre under Mohanpur UpazilaDistrict-Rajshahi.FY/2019-20202 Details Estimate for Supplyingassemblingfittingfixing & installation Sub-mersible water Pump motor set at ANear the House of Mozahar & B Near the House of Zolil Sardar at Village Mohiskundi Under Ghasigram UnionUpazila-MohanpurDistrict-Rajshahi.FY/2019-20203 Details Estimate for Brick-Solinr & CC.Road start from Gocha Hat- Zonab House under Ghasigram unionUpazila-MohanpurDistrict-Rajshahi.FY/2019-20204 Details Estimate for Supply of High Bench Low Bench at Atray Agrani Deggre College under Ghasigram UnionUpazila-MohanpurDistrict-Rajshahi.FY/2019-2020
ADP/19-20/4/e-GP/20241009/423826/00193559
|
Office of the Upazila Engineer |
৳৭.৭১ লাখ |
৯ ফেব ২০২০ |
Completed |
|
Construction of additional class room of Bil Doher RPS under PEDP4
e-Tender/PEDP4/NTR/SIN/2019-20/W2.00691/e-GP/20240929/420552/00187096
|
Office of the Upazila Engineer, LGED, Singra, Natore |
৳৮৮.৩৫ লাখ |
৯ ফেব ২০২০ |
Completed |
|
A a R-09 Construction of RCC Road from Uttar Damdama Eidgah Field to Hossain House at Uttar Damdama Ward no-02 under singra Paurashava Ch.000- 0335.00m.B R-01 Construction of RCC Road from Saiful House to Dilip House at Masinda Ward no-01 under singra Paurashava Ch.000-0185.00m.C D-03 Construction of RCC drain with Slab from Dilip House to River Ghat at Masinda ward no-01 Under Singra Paurashava ch.000-0235.00m.
UIIP-BC/PCO/W-87/e-GP/20240930/408795/00187577
|
PIU Office of Singra Pourashava, Natore |
৳৭৫.৭৯ লাখ |
১৫ জানু ২০২০ |
Completed |
|
Widening and Strengthening of Manikganj-Bangladesh Hat Tilli- Sonka Nagarpur Road at Ch.000-7655 Under Upazila Sadar District Manikganj. Road ID-356462001
DDIRWSP/Manikganj/Sadar/19-20/RD-01/e-GP/20230930/390205/0092649
|
Office of the Executive Engineer, LGED, Manikganj |
৳১০.২১ কোটি |
২ ডিসে ২০১৯ |
Completed |
|
Periodic Maintenance of Kamdia hat GC-Panitala hat GC Road at Ch.4500m-9016m & 10785m- 13000m under Gobindaganj Upazila. Dist. Gaibandha. Road ID. 132302004
e-APP/LGED/Gai/GOBM/19-20/W-55/e-GP/20240925/380693/00182548
|
Office of the Executive Engineer, LGED, Gaibandha |
৳১.৫৬ কোটি |
১৪ নভে ২০১৯ |
Completed |
|
Periodic Maintenance of Charabari Bazar-Porabari UP-Baroha Silimpur GC Road from Ch. 000m-1200m Tangail Sadar ID No.393953016
e-Tender/LGED/Tang/GOBM/2019-20/W-53/e-GP/20220614/375655/006814
|
Office of the Executive Engineer, LGED, Tangail |
৳৪০.৩৭ লাখ |
১১ নভে ২০১৯ |
Completed |
|
Periodic Maintenance of KanchanpurGC Dhongpara-Ishorgonj GC via Mirikpur Road from Ch. 000m-830m & 5800m-6875m Basail ID No.393092008
e-Tender/LGED/Tang/GOBM/2019-20/W-86/e-GP/20231107/378463/00123766
|
Office of the Executive Engineer, LGED, Tangail |
৳৬০.০৯ লাখ |
১১ নভে ২০১৯ |
Completed |
|
Widening of Badargonj UZHQ-Chowmohoni Via Laldighihat GC Road from Ch. 1100m - 5000m Road ID. 185032002 Badarganj
e-Tender/LGED/Rang/GOBM/19-20/W-70/e-GP/20240321/379810/00160267
|
Office of the Executive Engineer, LGED, Rangpur |
৳২.৫৭ কোটি |
৭ নভে ২০১৯ |
Completed |
|
Periodic Maintenance of Gajaghanta GC- Jummapara ZHQ Road from Ch. 00m - 2275m Road ID. 185272008 Gangachara
e-Tender/LGED/Rang/GOBM/19-20/W-60/e-GP/20240323/379820/00160337
|
Office of the Executive Engineer, LGED, Rangpur |
৳২.০৯ কোটি |
৭ নভে ২০১৯ |
Completed |
|
Widening of Badargonj UZHQ-Chowmohoni Via Laldighihat GC Road from Ch. 5000m - 8890mRoad ID. 185032002 Badarganj
e-Tender/LGED/Rang/GOBM/19-20/W-69/e-GP/20240323/379811/00160334
|
Office of the Executive Engineer, LGED, Rangpur |
৳২.৫০ কোটি |
৭ নভে ২০১৯ |
Completed |
|
Construction of 24.00m Long RCC Girder Bridge on Sohagdol UP Office - Banshkati Bazar Pathalipara via Sukadittakati GPS Rajabari collage at Ch 9936m Road ID 579873013
IBRP/Piroj/Nesar/Brg-03/e-GP/20241207/328021/00229560
|
Office of the Executive Engineer, LGED, Pirojpur |
৳১.৭৯ কোটি |
৪ আগ ২০১৯ |
Ongoing |
|
Construction of 18.00m Long RCC Girder Bridge on Juluhar bazaar-Laxankati RHD via Mirzapur Durgakathi at Ch 4592m Road ID 579872003
IBRP/Piroj/Nesar/Brg-02/e-GP/20241202/328020/00226555
|
Office of the Executive Engineer, LGED, Pirojpur |
৳১.৩৬ কোটি |
৪ আগ ২০১৯ |
Ongoing |
|
Construction of 39.00m Long RCC Girder Bridge on Badarganj GC -Haque Saheber Mor-Dugdugirhat via Kalupara UP & Gupirdanga Hat Road at Ch. 3813m Under UpazilaBadarganj District. Road ID No-185033025
FDR/RAN/18-19/BW-15/e-GP/20240829/339422/00170131
|
Office of the Executive Engineer, LGED, Rangpur |
৳৩.০২ কোটি |
৩ জুলাই ২০১৯ |
Completed |
|
Construction of Class room of Hatdelua Primary School under NBIDGPS Project-1
e-Tender/ NBIDGPS/SER/ULL/2018-19/W1..03798/e-GP/20240912/338005/00175486
|
Office of the Upazila Engineer, LGED, Ullapara, Sirajganj |
৳১.০২ কোটি |
২৬ জুন ২০১৯ |
Completed |
|
Construction of remaining work of 72.06m RCC Girder Bridge Approach Road on Nagarpur UP-Alokdia Road at Ch. 970m over the Noyai River under Nagarpur Upazila District Tangail.
PD/CLBUURP/W-193A/e-GP/20220612/313332/005831
|
Office of the Executive Engineer, LGED, Tangail |
৳১.১৯ কোটি |
২১ মে ২০১৯ |
Completed |
|
Improvement of Rangamati House of Heto Road Ch.00-2000m ID No. 185765104 Pirganj
RDRIIP-2/W-VRB-202/e-GP/20240819/318998/00168296
|
Office of the Executive Engineer, LGED, Rangpur |
৳১.৪৫ কোটি |
১৬ মে ২০১৯ |
Completed |
|
A Construction of class room of Hariram Shahapur Rajakpur Primary school & B Construction of class room of Paharpur Adibashi Primary school.
e-Tender/NBIDNNGPS/RAN/PIR/2018-19/W1.03623/e-GP/20241124/301840/00222255
|
Office of the Upazila Engineer, LGED, Pirganj, Rangpur |
৳১.৫৫ কোটি |
৯ মে ২০১৯ |
Completed |
|
Improvement of Boundary wall at Mirpara Graveyard Near Al-Haz Abubakker Helal Union Mithapur Upazila Badalgachi Dist-Naogaon Latitude 24.998647 Longitude 88.941923 Part-1
GSIDP/NAO/SDW-205/e-GP/20240929/311487/00187274
|
Office of the Executive Engineer, LGED, Naogaon |
৳৮.১২ লাখ |
৬ মে ২০১৯ |
Completed |
|
Construction of class room of AULIABAD Government primary school under NBIDGPS project-1Construction of class room of BANGRA Government primary school under NBIDGPS project-1
e-Tender/NBIDGPS/TAN/KAL/2018-19/W1.04258/e-GP/20231114/308026/00126996
|
Office of the Upazila Engineer, LGED, Kalihati, Tangail |
৳১.৪৯ কোটি |
২২ এপ্রিল ২০১৯ |
Completed |
|
Construction of class room of SORAI Government primary school under NBIDGPS project-1Construction of class room of NAGBARI Government primary school under NBIDGPS project-1
e-Tender/NBIDGPS/TAN/KAL/2018-19/W1.04210/e-GP/20231114/308004/00126966
|
Office of the Upazila Engineer, LGED, Kalihati, Tangail |
৳১.৩৪ কোটি |
২২ এপ্রিল ২০১৯ |
Completed |
|
Improvement by Bituminous Carpeting of a Twbaria GC-Daptior UP Office Road Ch. 00-1000m ID No. 393763002 b Mamudnagar UP Office-Jangalia Bazar Road Ch. 1100-1550m ID No. 393763013 Under Nagarpur Upazila District Tangail GMRIDP
GMRIDP/TANG/NAGA/UNR/227/e-GP/20220611/305946/005523
|
Office of the Executive Engineer, LGED, Tangail |
৳১.৩৩ কোটি |
১৭ এপ্রিল ২০১৯ |
Completed |
|
Improvement of Neogibari GPS - Rupsa Hat Road under Sadar Upazila Dist. Sirajganj. SDIRIDP/SAD/SUB/VIL-77 ID No. 188784149 Starting point - Rupsa Hat Ch. 00 - 1500m
SDIRIDP/SAD/W-96/e-GP/20240821/287605/00168789
|
Office of the Executive Engineer, LGED, Sirajganj |
৳১.৭৪ কোটি |
২৮ ফেব ২০১৯ |
Completed |
|
Construction of Administrative Extension Building and Hall Room for Abhoynagar Upazila Parishad District Jashore.
EUCPW-27/e-GP/20240408/286684/00160907
|
Office of the Upazila Engineer, LGED, Abhoynagar, Jessore |
৳৫.৪২ কোটি |
২৪ ফেব ২০১৯ |
Completed |
|
Improvement by Bituminous Carpeting of Kanchanpur GC Dhongpara-Isharganj GC via Mirikpur Road Ch. 1350-4350m and Construction of 1no 3.0x3.0m Box Calvert on Same Road at Ch. 2680m Under Basail Upazila District Tangail ID No. 393092008 Salvage Cost. 271858.00
MRRIDP/18/TANG/BASA/UZR/82/e-GP/20231114/281897/00127083
|
Office of the Executive Engineer, LGED, Tangail |
৳৩.৮৩ কোটি |
২০ ফেব ২০১৯ |
Completed |
|
Package no MGSP/TAN/2018-19/W-17 a.Rehabilitation of Thanapara BSCIC road starting from Shantikunja moar to commitment Coaching moar by Bituminous Carpeting road under Tangail Pourashava. Ch. 000 to 0410 m effective Length-410m. b.Construction of RCC Drain at Thana para BSCIC road starting from Shantikunja moar to commitment Coaching moar Ch. 0-260 m effective Length-260m under Tangail Pourashava. c.Construction of RCC drain starting from Tangail Bypass to Sontosh Science & Technology via Victoria road & main road under Tangail Pourashava Ch. 0000 to 0745 m effective Length-745 m. d.Rehabilitation of Pocchim AkurTakur Para Housing area road by Bituminous Carpeting under Tangail Pourashava Ch. 0000 to 0960 m. e.Construction of RCC Drain at Pocchim AkurTakur Para Housing area road under Tangail Pourashava under Tangail Pourashava Ch.0000 to1020 m Length1020m. f.Improvement of road starting from Sabalia Bottola to BoraiBil by Bituminous Carpeting under Tangail Pourashava Ch- 0000 to 0550m. g.Construction of RCC Drain at Sabalia Bottola to Borai Bil under Tangail Pourashava Ch- 0000 to 0620m. Length620m. Memo no-LGED/PD/MGSP/W-10/2014 Part-07/1338. Date- 12/11/2018.
MGSP/TAN/2018-19/W-17/e-GP/20220905/252418/0033828
|
PIU Office of Tangail Pourashava, Tangail |
৳১০.৩৩ কোটি |
১৯ নভে ২০১৮ |
Completed |
|
Rehabilitation of Tangail Tangail-Nagarpur Reg. HW at Kagmari College-Charabari-Torapgonj GC-Shahjani GC Road from Ch. 7129-14150m Under Sadar Upazila District Tangail Road ID No. 393952003 Flood
FDR/Tan/18-19/UZR/W11/e-GP/20231106/237256/00122857
|
Office of the Executive Engineer, LGED, Tangail |
৳৫.৯৯ কোটি |
১৫ নভে ২০১৮ |
Completed |
|
Rehabilitation of Tangail Tangail-Nagarpur Reg. HW at Kagmari College-Charabari-Torapgonj GC-Shahjani GC Road from Ch. 00-7129m Under Sadar Upazila District Tangail Road ID No. 393952003 Flood
FDR/Tan/18-19/UZR/W10/e-GP/20220618/237255/008243
|
Office of the Executive Engineer, LGED, Tangail |
৳৭.১৪ কোটি |
১৫ নভে ২০১৮ |
Completed |
|
Improvement of Tilna Bazar Zme-Mosque under a under Tilna Union Upazila Sapahar Dist Naogaon. Latitude25.1375 Longitude 88.5774
GSIDP/NAO/DW-156/e-GP/20240919/239962/00178761
|
Office of the Executive Engineer, LGED, Naogaon |
৳১১.৫৯ লাখ |
৫ নভে ২০১৮ |
Completed |
|
Periodic Maintenance of Sanerhat GC-Rahmatpur GC Bairagirhat Road from Ch. 000m-12703m Road ID 185762008 Pirganj
e-Tender/LGED/Rang/GOBM/18-19/W-09/e-GP/20230326/231961/0062691
|
Office of the Executive Engineer, LGED, Rangpur |
৳২.০৪ কোটি |
৯ অক্টো ২০১৮ |
Completed |
|
Improvement of Boundary wall at Dahuka Graveyeard under Ganguria Union Upazila Porsha District Naogaon Latitude 25.0544 Longitude 88.5131
GSIDP/NAO/DW-88/e-GP/20241001/213328/00188638
|
Office of the Executive Engineer, LGED, Naogaon |
৳৩.৮৩ লাখ |
২৫ জুলাই ২০১৮ |
Completed |
|
Improvement of Nithpur Durga Mondir under Nithpur Union Upazila Porsha District Naogaon Latitude 25.0234 Longitude 88.4547
GSIDP/NAO/DW-85/e-GP/20241002/213324/00189869
|
Office of the Executive Engineer, LGED, Naogaon |
৳২.৯১ লাখ |
২৫ জুলাই ২০১৮ |
Completed |
|
Vertical Extension of Academic Building Including Sanitary Water Supply and Electrification Works Pre Vocational & Vocational Program At Shahid Jahangir High School Sadar Upazilla District-Tangail.WD-93o
eGp -12-tan-SESIP-WD-93o/e-GP/20230122/212225/0061488
|
Office of the Executive Engineer, Tangail Zone |
৳৭৩.৬৮ লাখ |
১৮ জুলাই ২০১৮ |
Completed |
|
Rehabilitation of 4.00x3.60m RCC Box Culvert on Darisaya-Bengula Bazar Road at Ch. 400m Under Gopalpur Upazila District Tangail ID No. 393382008 FDDRIP
FDR/Tan/17-18/CW03/e-GP/20231031/209627/00119519
|
Office of the Executive Engineer, LGED, Tangail |
৳২০.৬৭ লাখ |
৯ জুলাই ২০১৮ |
Completed |
|
Const. of KACHARI PARA Primary School
e-Tender/NBIDNNGPS/SRJ/KAM/2017-18/w1.00011/e-GP/20221015/158286/0050993
|
Office of the Upazila Engineer, LGED, Kamarkhand, Sirajganj |
৳৭০.৪৫ লাখ |
১২ ফেব ২০১৮ |
Completed |
|
Const. of Digreepara Primary School.
e-Tender/NBIDNNGPS/SRJ/SAD/2017-18/.W1.00009/e-GP/20220911/149380/0035738
|
Office of the Upazila Engineer, LGED, Sirajganj Sadar, Sirajganj |
৳৭৩.০৩ লাখ |
২৮ জানু ২০১৮ |
Completed |
|
Const. of CHARMIRPUR Primary School.
e-Tender/NBIDNNGPS/SRJ/SAD/2017-18/.W1.00284/e-GP/20220913/157392/0036538
|
Office of the Upazila Engineer, LGED, Sirajganj Sadar, Sirajganj |
৳৭১.৭৩ লাখ |
২৮ জানু ২০১৮ |
Completed |
|
Improvement of Ghatail West para-Taragonj Bazar-Anehola UP Office Road Ch. 3040-5250m under Ghatail Upazila District Tangail ID No. 393283003 IRIDP-2
IRIDP-2/TNG/SDW-234/e-GP/20220914/152821/0036822
|
Office of the Executive Engineer, LGED, Tangail |
৳১.৪৪ কোটি |
২১ জানু ২০১৮ |
Completed |
|
Periodic Maintenance of Kashpukuria UP Office - Shumbhudia GC Road from Ch. 000m -1400m Chowhali ID. No.188273005
e/Tender/LGED/Seraj/GOBM/17-18/W-30/e-GP/20220910/142533/0035522
|
Office of the Executive Engineer, LGED, Sirajganj |
৳২৩.৬২ লাখ |
৩০ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Jotpara GC Baby Stand - Shubhudia GC Road from Ch. 000m-1668m Chowhali ID. No.188272004
e-Tender/LGED/Seraj/GOBM/17-18/W-31/e-GP/20220910/142534/0035512
|
Office of the Executive Engineer, LGED, Sirajganj |
৳১৮.৪৯ লাখ |
৩০ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Chowhali Upazila H/Q - Nagorpur Thana Border Road from Ch. 000m-2212m Chowhali ID. No.188272001
e-Tender/LGED/Seraj/GOBM/17-18/W-04/e-GP/20220910/140291/0035520
|
Office of the Executive Engineer, LGED, Sirajganj |
৳৬১.৯৫ লাখ |
২৮ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Charsolimabad GC - Doulatpur GC Chowhali Part Road from Ch. 000m -1580m Chowhali ID. No.188272006
e-Tender/LGED/Seraj/GOBM/17-18/W-16/e-GP/20220910/137601/0035449
|
Office of the Executive Engineer, LGED, Sirajganj |
৳৪২.৫৩ লাখ |
২৮ নভে ২০১৭ |
Completed |
|
Package No MGSP/PBG/TAN/2017-18/W-10 a. Maintenance & Rehabilitation of Thanapara Bokhari Mosque road starting from Delduar road to Thanapara Bisic road by RCC under Tangail Pourashava. Ch.0000-0650m. b. Maintenance of Biswas Betka MES road starting from Mymensingh road to Munshipara road by WBM & Dense Carpeting under Tangail Pourashava. Ch.0000-0790m. c. Maintenance of road starting from Biswas Betka Dhaka road Godown bridge to Ghotkbari morh by WBM and dense carpeting under Tangail Pourashava. Ch.0000-0300m. d. Maintenance of Alowa Bayan para/Ghoshpara road starting from Purabari road to near the H/O. Suvas Babu by RCC & Protective work under Tangail Pourashava. Ch.0000-0110m. Financial Year 2017-18. Refence no LGED/PD/MGSP/W-10/2014 Part-3/1152 date-18-10-2017.
MGSP/PBG/TAN/2017-18/W-10/e-GP/20220914/132071/0036770
|
PIU Office of Tangail Pourashava, Tangail |
৳১.৩৬ কোটি |
৬ নভে ২০১৭ |
Completed |
|
Construction of additional class room of SANTOSH JAHNAVI Primary school
e-Tender/PEDP-III/TNG/SAD/2017-18/W4.399 /e-GP/20231123/124883/00135633
|
Office of the Upazila Engineer, LGED, Tangail Sadar, Tangail |
৳৬৬.৭৪ লাখ |
২৪ অক্টো ২০১৭ |
Completed |
|
Emergency Maintenance of 1Vx3.00mx2.50m RCC Box Culvert on Salgrampur Bazar-Kholaghata Road at Ch. 2620m Under Sakhipur Upazila District Tangail ID No.393854050 GOBMEM Structure
e-Tender/LGED/Tang//GOBM/2017-18/W-36/e-GP/20231025/127853/00115402
|
Office of the Executive Engineer, LGED, Tangail |
৳১২.৭০ লাখ |
১৯ অক্টো ২০১৭ |
Completed |
|
Construction of Upazila Muktijoddha Complex Bhaban at Chowhali Upazila Under Sirajgonj District.
CUMCP/SIR/CHO/16/C-326 /e-GP/20240821/105663/00168858
|
Office of the Executive Engineer, LGED, Sirajganj |
৳১.৮৩ কোটি |
৩১ মে ২০১৭ |
Completed |