|
140.00 m River Bank Protective work on the Left Bank of the Nolshia River at Meeripara (Porchimpara Govt. Parimary School) in Tukuria Union, Upazila: Pirganj, Dist.: Rangpur Under Rangpur O&M Division, BWDB, Rangpur.
Protective/Nolshia-32/e-GP/20250610/917871/00245995
|
Rangpur O&M Division |
৳১.২০ কোটি |
৫ ডিসে ২০২৩ |
Completed |
|
Collection of hydrological data including the payoff of gauge reader for 11 nos Water Level Gauge, 32 nos Rain Gauge & 6 nos Rain Gauge cum Evaporation stations under the jurisdiction of Dinajpur, Thakurgaon, Dalia & Kurigram Hydrology Section of Dinajpur Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2023-24.(From 01/01/2024 to 30/06/2024)
NMD-26/2023-24/e-GP/20250610/904969/00246028
|
Northern Measurement Division |
৳১৭.৮১ লাখ |
১৫ নভে ২০২৩ |
Completed |
|
Discharge Measurement & Triangulation survey work at 291.5 Dalia Station of 107 Teesta River ( Trans boundary river), 291.5 Dalia CHR Station, 294 Kaunia Station of 107 Teesta River, 62.1 Barati Station of 28 Jamunashwari River( Trans boundary river), 62 Badorganj Station of 28 Jamunashwari River, 331 Uttar Gomnati Station of 141 Buri Teesta river( Trans boundary river) with Survey Boat (Speed Boat/engine boat/country boat/dngi boat) by supplying fuel, surveyor, Skilled/Un skilled labours, pick-up, Rickshawa/Van etc. and Repair & Maintanance of gauge of Dalia Hydrology Section under Dinajpur Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2023-24.(From 01/01/2024 to 30/06/2024).
NMD-23/2023-24/e-GP/20250610/904966/00246005
|
Northern Measurement Division |
৳১৮.৬২ লাখ |
১৫ নভে ২০২৩ |
Completed |
|
Collection of hydrological data including the payoff of gauge reader for 3 nos Water level gauge, 14 nos Rain gauge and 3 nos Rain gauge cum Evaporation Station under the jurisdiction of Pabna, Bheramara and Sirajgonj Hydrology Section of Pabna Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2023-2024. (From 01-01-2024 to 30-06-2024)
NMD-19/2023-24/e-GP/20250610/904961/00246003
|
Northern Measurement Division |
৳৫.৮২ লাখ |
১৫ নভে ২০২৩ |
Completed |
|
Discharge measurement work of 39 Ganges River, 90 Hardinge Bridge Station with the help of Catamaran and Speed boat through Supplying of fuel, Lubricant, Gear oil, Skilled and Un-skilled Labour etc. under the jurisdiction of Bheramara Hydrology Section of Pabna Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2023-2024 (From 01-01-2024 to 14-03-2024).
NMD-16/2023-24/e-GP/20250610/904953/00245999
|
Northern Measurement Division |
৳২৩.০৩ লাখ |
১৫ নভে ২০২৩ |
Completed |
|
Discharge measurement work of 39 Ganges River, 90 Hardinge Bridge Station with the help of Catamaran and Speed boat through Supplying of fuel, Lubricant, Gear oil, Surveyor, Skilled and Un-skilled Labour etc. under the jurisdiction of Bheramara Hydrology Section of Pabna Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2023-2024 (From 01-07-2023 to 31-12-2023).
NMD-02/2023-24/e-GP/20250611/833281/00246033
|
Northern Measurement Division |
৳২১.২৬ লাখ |
২২ মে ২০২৩ |
Completed |
|
Discharge measurement works location at 36 Dudhkumar River ( 81.1 Dokkhin Tily) from July/2023 to December/2023 of Kurigram Hydrological section of Dinajpur Hydrological Sub-Division under Northern Measurement Division, BWDB, Pabna during the year of 2023-24.
NMD-15/2023-24/e-GP/20250611/833303/00246032
|
Northern Measurement Division |
৳৩.১২ লাখ |
২২ মে ২০২৩ |
Completed |
|
Discharge measurement works location at 32 Dharla River (76.5 Moghalhat) from July/2023 to December/2023 of Kurigram Hydrological section of Dinajpur Hydrological Sub-Division under Northern Measurement Division, BWDB, Pabna during the year of 2023-24.
NMD-14/2023-24/e-GP/20250611/833302/00246031
|
Northern Measurement Division |
৳৩.১২ লাখ |
২২ মে ২০২৩ |
Completed |
|
Emergency repair and strengthening of 110m Bank Protection works in between BRE Km 155.000 to Km 156. 000 on the Right Bank of Jamuna River through 250kg geo textiles bags under Sirajganj O&M Division, BWDB, Sirajganj during FY-2022-2023.
NDR-OTM-14/2022-2023/e-GP/20240701/830143/00164181
|
Sirajganj O&M Division |
৳৬৬.৫৯ লাখ |
১১ মে ২০২৩ |
Completed |
|
Discharge measurement work of 39 Ganges River, 90 Hardinge Bridge Station with the help of Catamaran and Speed boat through Supplying of fuel, Lubricant, Gear oil, Surveyor, Skilled and Un-skilled Labour etc. under the jurisdiction of Bheramara Hydrology Section of Pabna Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2022-2023 (From 16-02-2023 to 10-04-2023).
NMD-17/2022-23/e-GP/20240627/763072/00164043
|
Northern Measurement Division |
৳১৪.৯০ লাখ |
৭ ডিসে ২০২২ |
Completed |
|
Discharge measurement works location at 36 Dudhkumar River ( 81.1 Dokkhin Tily) from January/2023 to June/2023 of Kurigram Hydrological section of Dinajpur Hydrological Sub-Division under Northern Measurement Division, BWDB, Pabna during the year of 2022-23.
NMD-33/2022-23/e-GP/20240703/763090/00164470
|
Northern Measurement Division |
৳৩.১২ লাখ |
৭ ডিসে ২০২২ |
Completed |
|
Discharge Measurement work and repair & maintenance work at 236-Pulhat Station of 89-Punarbhaba River, 287-Kodalkatigaon Station of 105-Tangon River, 340-Kazipara Station of 150-Tetulia/Tulai River, 142/1 Bhushirbandar Station of 57-Karatoa/Atrai River with Survey Boat (Engine Boat) by supplying surveyor, labours, pick-up, rickshaw van etc. and Payoff, Gauge Reader under Northern Measurement Division, BWDB, Pabna during the financial year 2022-23.
NMD-26/2022-23/e-GP/20240703/763083/00164425
|
Northern Measurement Division |
৳৫.৮৫ লাখ |
৭ ডিসে ২০২২ |
Completed |
|
Discharge measurement work with the help of Van (Rickshaw), pick-up, surveyor, skilled & unskilled labour , Engine boat of river 7 Bangali at 11 Khanpur, 135 Tulshiganga at 325 Sonamukhi, 59 Katakhali at 155 Mohimaganj, 28 Korotoa at 65 Bogura,7 Bangali at 10 Shimulbari (Small river) & Data collection work for 08 nos Rain gauge station, 01 no Evaporation cum Rain gauge station, Repair of 9 nos Rain gauge cum Evaporation Station and 11 nos Water level gauge station, sending data for 3 nos flood forecasting station of Bogra Hydrology Section of Rajshahi Hydrology Sub-division under Northern Measurement Division, BWDB, Pabna during the year 2022-23.
NMD-25/2022-23/e-GP/20240703/763080/00164421
|
Northern Measurement Division |
৳৩.০৫ লাখ |
৭ ডিসে ২০২২ |
Completed |
|
Discharge measurement work with the help of Van (Rickshaw), pick-up, surveyor, skilled & unskilled labour and engine boat of river 51 Little Jamuna at 133 Naogaon, 57 Atrai at 145 Mohadebpur, 57 Atrai at 144 Chalkhariharpur, 57 Atrai at 147 Atrai Railway Bridge & 37 Fokirni Barnai at 83.1 Naldangahat (all small river) & Data collection work for 08 nos Rain gauge station, Repair of 08 nos Rain gauge Station and 8 nos Water level gauge station, sending data for 3 nos flood forecasting station of Naogaon Hydrology Section of Rajshahi Hydrology Sub-division under Northern Measurement Division, BWDB, Pabna during the year 2022-23.
NMD-24/2022-23/e-GP/20240702/763079/00164328
|
Northern Measurement Division |
৳৩.৫৭ লাখ |
৭ ডিসে ২০২২ |
Completed |
|
Discharge measurement work at 66 Ullapara Station of 28 DCJ Korotoa River and 17.1 Baral Bridge station of 9 Baral River and Repair & Maintanance work of 6 nos Rain gauge cum Evaporation Station & 8 nos Water level gauge station; Data Collection Works for 2 nos Water level gauge, 5 nos Rain gauge & 1 nos Evaporation cum Rain gauge Station and sending data for 2 nos flood forecasting station with the help of Engine boat/ Country Boat through Supplying of Pick-up, Surveyor and Labour (Skilled and Un-skilled) etc under the jurisdiction of Sirajgonj Hydrology Section of Pabna Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2022-2023. (From 01-01-2023 to 30-06-2023)
NMD-21/2022-23/e-GP/20240702/763076/00164327
|
Northern Measurement Division |
৳৩.৭৫ লাখ |
৭ ডিসে ২০২২ |
Completed |
|
Discharge measurement work of 39 Ganges River, 90 Hardinge Bridge Station with the help of Catamaran and Speed boat through Supplying of fuel, Lubricant, Gear oil, Surveyor, Skilled and Un-skilled Labour etc. under the jurisdiction of Bheramara Hydrology Section of Pabna Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2022-2023 (From 11-04-2023 to 30-06-2023).
NMD-18/2022-23/e-GP/20240702/763073/00164326
|
Northern Measurement Division |
৳১৪.৮৬ লাখ |
৭ ডিসে ২০২২ |
Completed |
|
Discharge Measurement work , repair & Maintenance of 291.5 Dalia Station of 107 Teesta River ( Trans boundary river), 291.5 Dalia CHR Station of 107- Teesta main canal, 294 Kaunia Station of 107 Teesta River, 62.1 Barati Station of 28 Jamunashwari River( Trans boundary river), 62 Badorganj Station of 28 Jamunashwari River, 331 Uttar Gomnati Station of 141 Buri Teesta river( Trans boundary river) with Survey Boat (Speed Boat/engine boat/country boat/dngi boat) by supplying fuel, lubricant, gear oil, surveyor, Skilled/Un skilled labours, pick-up, Rickshawa/Van etc. & Pay off Rain Gauge & Evaporation Gauge Reader of Dinajpur Hydrology Sub-Division, under Northern Measurement Division, BWDB, Pabna during the financial year 2022-23.( From 01/01/2023 to 31/03/2023).
NMD-27/2022-23/e-GP/20240627/763084/00164060
|
Northern Measurement Division |
৳১৩.৭৯ লাখ |
৭ ডিসে ২০২২ |
Completed |
|
Discharge measurement work of 39 Ganges River, 90 Hardinge Bridge Station with the help of Catamaran and Speed boat through Supplying of fuel, Lubricant, Gear oil, Surveyor, Skilled and Un-skilled Labour etc. under the jurisdiction of Bheramara Hydrology Section of Pabna Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2022-2023 (From 01-01-2023 to 15-02-2023).
NMD-16/2022-23/e-GP/20240627/763071/00164065
|
Northern Measurement Division |
৳১৩.৮১ লাখ |
৭ ডিসে ২০২২ |
Completed |
|
Re-Excavation of Rishibari Khal from Km. 0.000 to 7.200 = 7.200 km at Upazila- Dohar, Dist- Dhaka in connection with "Re-Excavation of Small River, Channel and Wetland in 64 district of Bangladesh (1st Phase) (2nd Revised)" under Dhaka O&M Division-II, BWDB, Dhaka during the Financial Year 2021-22 & 2022-23.
Dhaka-W-14/2021-22/e-GP/20231122/729001/00134936
|
Dhaka O&M Division-2 |
৳২.৬৫ কোটি |
৩০ আগ ২০২২ |
Completed |
|
Repair and Maintenance of Kaliganj Sub-Divisional Engineer's Office Building, Renovation and Upgradation of Inspection bungalow of Kaliganj with reconstruction of Boundary wall under operating budget at Satkhira O & M Division - 1 , BWDB, Satkhira during the year 2021-22
Sat 1/W 3/21-22/e-GP/20240627/653055/00164027
|
Satkhira O&M Division-1 |
৳২৫.০৯ লাখ |
২৯ মে ২০২২ |
Completed |
|
Discharge measurement works location at Baruipara (Mohananda River) from April/2022 to June/2022 of Rajshahi Hydrological section of Rajshahi Hydrological Sub-Division under Northern Measurement Division, BWDB, Pabna during the year of 2021-22.
NMD-Boarder-02/2021-22/e-GP/20220913/683394/0036635
|
Northern Measurement Division |
৳২.৬৫ লাখ |
৭ এপ্রিল ২০২২ |
Completed |
|
Discharge measurement works location at 107 Teesta River (Uttor Kaharibari- Dokkhin Kaharibari) from April/2022 to June/2022 of Dalia Hydrological section of Dinajpur Hydrological Sub-Division under Northern Measurement Division, BWDB, Pabna during the year of 2021-22.
NMD-Boarder-05/2021-22/e-GP/20220913/683397/0036501
|
Northern Measurement Division |
৳৩.৫২ লাখ |
৭ এপ্রিল ২০২২ |
Completed |
|
Discharge measurement works location at 32 Dharla River (Moghalhat) from April/2022 to June/2022 of Kurigram Hydrological section of Dinajpur Hydrological Sub-Division under Northern Measurement Division, BWDB, Pabna during the year of 2021-22.
NMD-Boarder-03/2021-22/e-GP/20220913/683395/0036632
|
Northern Measurement Division |
৳২.৫৮ লাখ |
৭ এপ্রিল ২০২২ |
Completed |
|
Re-Excavation of Patiljhap-Kandamatra-braha-Mailail Khal from km. 7.000 to km. 13.450 = 6.450 km. at Upazila- Nawabganj, Dist- Dhaka in connection with "Re-Excavation of Small River, Channel and Wetland in 64 district of Bangladesh (1st Phase) (2nd Revised)" under Dhaka O&M Division-II, BWDB, Dhaka during the Financial Year 2021-22.
Dhaka-W-18/2021-22/e-GP/20231122/675040/00134996
|
Dhaka O&M Division-2 |
৳২.২৪ কোটি |
২০ মার্চ ২০২২ |
Ongoing |
|
Re-Excavation of Showour Kata Khal From km 0.000 to km 3.000 = 3.00 km in c/w "Re-Excavation of Small Rivers, Khal and Water Bodies in 64 Districts Project (Phase-1) (2nd Revised)" in Upazila: Sapahar, Dist: Naogaon Under Naogaon O&M Division, BWDB, Naogaon diuring the FY 2021-22.
Naogaon/W-10/2021-22/e-GP/20241028/672781/00205142
|
Naogaon O&M Division |
৳১.৯৮ কোটি |
১৫ মার্চ ২০২২ |
Completed |
|
400m River Bank Protection work along the Left bank of Korotoya river at Parboalmari in UZ. Pirgonj, Dist. Rangpur under Rangpur O&M Division, BWDB, Rangpur.
Protective/ Kor-03/e-GP/20250611/651803/00246034
|
Rangpur O&M Division |
৳৬.৫৯ কোটি |
২৭ জানু ২০২২ |
Completed |
|
Water Level Data Collection Works from Water level Gauge station through Contractor for the month January to March/2022 Under the jurisdiction of Kurigram &Thakurgoan Hydrology Section under Northern Measurement Division, BWDB, Pabna during the financial year 2021-2022.
GR-NMD-25/2021-22/e-GP/20220626/633443/0015324
|
Northern Measurement Division |
৳২.৫২ লাখ |
১ ডিসে ২০২১ |
Completed |
|
Discharge Measurement work at 32 Dharla (Transboundary River) 76 Taluksimulbari, 32 Dharla 77 Kurigram and 36 Dudhkumar (Transboundary River) 81 Pateswari stations through Supplying Survey Boat (Catamaran/Speed Boat/Engine Boat), fuel, mobil, gear oil, surveyor, skilled/ Un-skilled labours, pick-up, Rickshaw Van etc. and Repair & Maintanance of gauge and Pay off of Rain Gauge & Evaporation Gauge under the jurisdiction of Dinajpur Hydrology Sub-Division under Northern Measurement Division, BWDB Pabna, during the financial year 2021-2022. (From 01-01-2022 to 30-06-2022)
NMD-21/2021-22/e-GP/20220913/630716/0036680
|
Northern Measurement Division |
৳৬.৫০ লাখ |
২৫ নভে ২০২১ |
Completed |
|
Discharge measurement work for 80 Mohananda at station 211.5 Chapai Nawabgonj, 89-Punarbhaba at 238 Rohanpur, 98-Shibbarnai at 261 Nawhata, 57 Gur at 147.5 Singra,148 Pagla at 338 Kansat through Supplying Van/ Rickshaw, pick-up, surveyor, skilled & unskilled labour with the help of shaded engine boat, engine boat and Country boat and Payoff of 11 nos Rain gauge Reader, 2 nos Evaporation cum Rain gauge Reader, Repair of 13 nos Rain gauge cum Evaporation Station and 9 nos Water level gauge station, sending data for 5 nos station to flood forecasting and Warning center and sending water sample during the financial year 2021-2022. (From 01-01-2022 to 30-06-2022)
NMD-17/2021-22/e-GP/20220914/630712/0036682
|
Northern Measurement Division |
৳৮.৪৩ লাখ |
২৫ নভে ২০২১ |
Completed |
|
Re-Excavation of Boalia Khal From Km 0.000 to Km 2.315 Total 2.315 Km at Polder No-01 in C/W Drainage Improvement of Polder 1 2 6-8 and 6-8 (Extension) Project in Satkhira District under Satkhira O&M Division-1 BWDB Satkhira during the Year 2021-22.
W sat-1/24/e-GP/20230302/615055/0062232
|
Satkhira O&M Division-1 |
৳৬৭.০৫ লাখ |
১০ অক্টো ২০২১ |
Completed |
|
Water Level Data Collection Works from Water level Gauge station through Contractor for the month October to December/2021 (Months) under the jurisdiction of Kurigram & Thakurgoan Hydrology Section under Northern Measurement Division, BWDB, Pabna during the financial year 2021-2022.
GR-NMD-20/2021-22/e-GP/20220622/614481/0011072
|
Northern Measurement Division |
৳২.৫৮ লাখ |
২৩ সেপ ২০২১ |
Completed |
|
Water Level Data Collection Works from Water level Gauge station through Contractor for the month October/2021 to December/2021 (3 months) under the jurisdiction of Pabna Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2021-2022.
GR-NMD-16/2021-22/e-GP/20220626/614475/0015320
|
Northern Measurement Division |
৳২.০৬ লাখ |
২৩ সেপ ২০২১ |
Completed |
|
Water Level Data Collection Works from Water level Gauge station through Contractor for the month October to December/2021 (3 months) under the jurisdiction of Rajshahi Hydrology Sub-Division under Northern Measurement Division, BWDB, Pabna during the financial year 2021-2022.
GR-NMD-17/2021-22/e-GP/20220626/614478/0015317
|
Northern Measurement Division |
৳৩.৬১ লাখ |
২৩ সেপ ২০২১ |
Completed |
|
Other structure and infrastructure Land scaping evict etc of Chuadanga District i/c with the Project Re-excavation of Small Rivers Khal & Water bodies in 64 Districts Phase-1 under Chuadanga O&M Division BWDB Chuadanga during The FY 2018-19.
FFW/W-35/e-GP/20220627/331179/0015494
|
Chuadanga O&M Division |
৳২৪.৬২ লাখ |
১২ জুন ২০১৯ |
Completed |
|
Other structure and infrastructure Land scaping evict etc of Meherpur District i/c with the Project Re-excavation of Small Rivers Khal & Water bodies in 64 Districts Phase-1 under Chuadanga O&M Division BWDB Chuadanga during The FY 2018-19.
FFW/W-40/e-GP/20220626/331180/0015343
|
Chuadanga O&M Division |
৳২৫.০৩ লাখ |
১২ জুন ২০১৯ |
Completed |
|
Repair and Renovation of Morphology Divisinal office BWDB Kushtia under NDR budget during the financial Year 2018-19.
KMD-12Col / 2018-19/e-GP/20220627/297296/0015688
|
Morphology Division BWDB Kushtia |
৳৪.২১ লাখ |
১৮ মার্চ ২০১৯ |
Completed |
|
Repair of Damaged Electric pole Pump house and Changing of Electrical Wire of Chuadanga O&M Colony under Chuadanga O&M Division BWDB Chuadanga During the FY-2018-19.
CHUA-NDR-Elec-01/2018-19/e-GP/20220627/288386/0015671
|
Chuadanga O&M Division |
৳৩.৫৬ লাখ |
৭ মার্চ ২০১৯ |
Completed |
|
Repairing and Changing work of Electrical Wire of Chuadanga O&M Divisional office under Chuadanga O&M Division BWDB Chuadanga During the FY-2018-19.
CHUA-NDR-Elec-02/2018-19/e-GP/20220627/288387/0015672
|
Chuadanga O&M Division |
৳২.৬৭ লাখ |
৬ মার্চ ২০১৯ |
Completed |
|
Repair & Maintenance of Water Control Structure at Rashikpur village of Mujibnagar Upazilla under the District Meherpur under Chuadanga O&M Division BWDB Chuadanga During the year 2018-19.
CHUA-NDR-09/2018-19/e-GP/20220627/258988/0015673
|
Chuadanga O&M Division |
৳২.৬৭ লাখ |
৫ ডিসে ২০১৮ |
Completed |
|
Re-sectioning of Secondary Irrigation Canal of Ganges Main Canal Both bank of S-11G canal in between km. 0.000 and 4.200 in connection with Rehabilitation of the Ganges-Kobadak Irrigation Project under Chuadanga O & M Division BWDB Chuadanga during the FY 2016-17.
RGKIP/CHU/W-6/2016-17/e-GP/20220627/87434/0015695
|
Chuadanga O&M Division |
৳৩৬.০০ লাখ |
১৫ ফেব ২০১৭ |
Completed |
|
Construction/Re-construction of Syphon 2Vent- 1.50m x 1.50m of S-15G Irrigation Canal at km. 3.250 Shombhunagar over Guraykhali Drainage channel in connection with Rehabilitation of the Ganges-Kobadak Irrigation Project under Chuadanga O & M Division BWDB Chuadanga during the FY- 2016-17.
RGKIP/CHU/W-32/2016-17/e-GP/20220627/87432/0015690
|
Chuadanga O&M Division |
৳১.২৩ কোটি |
১৫ ফেব ২০১৭ |
Completed |