Re-Excavation of Khodiadanga Khal From km 4.000 to km 6.000 = 2.00 km in c/w "Re-Excavation of Small Rivers, Khal and Water Bodies in 64 districts Project (Phase-1)(2nd Revised)" in Upazila: Manda, Dist: Naogaon Under Naogaon O&M Division, BWDB, Naogaon during the FY 2021-22.
Naogaon/W-11/2021-22/e-GP/20241028/672782/00205283
|
Naogaon O&M Division |
BDT 85.42 lakh |
15 Mar 2022 |
Completed |
|
Removal of garbage, hyacinth, slushy earth, Jungles and other obstacles for Main Drainage Canal ( MDC Up) In between km. 0.00 to km.7.00 = 2.00 km in connection with NNIP Block-A/1 under repair & maintenance Budget of Dhaka O&M Division-1, BWDB, Dhaka during the FY 2021-22.
OTM/NNIP/Block A-1/03/2021-22/e-GP/20231121/654877/00133069
|
Dhaka O&M Division-1 |
BDT 7.12 lakh |
9 Feb 2022 |
Completed |
|
Construction of 28 nos Improved Toilet Sanitary Electrical works & Running water supply etc at Nabinagar (21) & Nasirnagar (7) Upazilla in Brahmanbaria District under Project for Improvement of sustainable Water Supply Sanitation and Hygiene System in Haor Areas of Department of Public Health Engineering.
000/e-GP/DPHE/2023-07-11/00656943
|
Office of the Executive Engineer, DPHE,Brahmanbaria |
BDT 1.26 crore |
6 Feb 2022 |
Completed |
|
Repair and Maintenance of barrack A, B & C and other related works at Jatrabari WDB Colony under Dhaka O&M Division-II, BWDB, Dhaka during the year-2021-2022.
e-Tender/NDR/OTM/JC-06/2021-22/e-GP/20231115/642236/00127649
|
Dhaka O&M Division-2 |
BDT 8.99 lakh |
4 Jan 2022 |
Completed |
|
Repair, maintenance, Steel Shutter windows, replacing of glass pan, Earth filling & cutting and clearing of Jungle and other related work of at Jatrabari WDB Colony under Dhaka O&M Division-II, BWDB, Dhaka during the year-2021-2022.
e-Tender/NDR/OTM/JC-04/2021-22/e-GP/20231115/642234/00127523
|
Dhaka O&M Division-2 |
BDT 9.40 lakh |
4 Jan 2022 |
Completed |
|
Construction of Mortuary house & other related works at Jatrabari WDB Colony under Dhaka O&M Division-2, BWDB, Dhaka, During the year 2021-22.
e-Tender/NDR/OTM/JC-08/2021-22/e-GP/20231115/642238/00127654
|
Dhaka O&M Division-2 |
BDT 8.27 lakh |
4 Jan 2022 |
Completed |
|
Repair, maintenance and supplying fitting & fixing of Electrical goods for Jatrabari Staff Quarter under Dhaka O&M Division-II, BWDB, Dhaka during the year 2021-2022.
e-Tender/NDR/OTM/JC-07/2021-22/e-GP/20231115/642237/00127577
|
Dhaka O&M Division-2 |
BDT 10.28 lakh |
4 Jan 2022 |
Completed |
|
Supplying fitting & fixing of Electrical goods for Banani WDB Officers Quarter under Dhaka O&M Division-II, BWDB, Dhaka during the year 2021-2022.
e-Tender/NDR/OTM/BC-06/2021-22/e-GP/20231115/642230/00127601
|
Dhaka O&M Division-2 |
BDT 10.81 lakh |
4 Jan 2022 |
Completed |
|
Repair & maintenance of Barrack, Water tank, Pump motor room, Over Head tank cleaning and other related works at Banani Officers Quarter under Dhaka O&M Division-2, BWDB, Dhaka during the year-2021-2022.
e-Tender/NDR/OTM/BC-07/2021-22/e-GP/20231115/642231/00127622
|
Dhaka O&M Division-2 |
BDT 8.31 lakh |
4 Jan 2022 |
Completed |
|
Repair & maintenance, supplying, fitting, fixing of wooden door, PVC door & veneered door shutter at Banani BWDB Officers Quarter under Dhaka O&M Division-II, BWDB, Dhaka during the year-2021-2022.
e-Tender/NDR/OTM/BC-04/2021-22/e-GP/20231115/642228/00127634
|
Dhaka O&M Division-2 |
BDT 8.90 lakh |
4 Jan 2022 |
Completed |
|
Painting & other Repair, Maintenance 12 nos flat and others at Jatrabari WDB Colony under Dhaka O&M Division-II, BWDB, Dhaka during the year-2021-2022.
e-Tender/NDR/OTM/JC-05/2021-22/e-GP/20231115/642235/00127644
|
Dhaka O&M Division-2 |
BDT 8.89 lakh |
4 Jan 2022 |
Completed |
|
Repair & maintenance work of glass door, ceiling, work station, low height partition wall & civil work in Pani Bhaban under Dhaka O&M Division-2, BWDB, Dhaka during the year 2021-22.
e-Tender/NDR/LTM/PB-01/2021-22/e-GP/20231115/626436/00127587
|
Dhaka O&M Division-2 |
BDT 11.26 lakh |
10 Nov 2021 |
Completed |
|
Construction of additional class room Malanchi Sreerampur under PEDP4 Bagherpara Jashore
e-Tender/PEDP4/JSR/BAG/2019-2020/W2.01254/e-GP/20241024/453989/00203087
|
Office of the Upazila Engineer, LGED, Bagherpara, Jessore |
BDT 59.54 lakh |
10 May 2020 |
Completed |
|
Construction of additional class room Barbhage under PEDP4 Bagherpara Jashore
e-Tender/PEDP4/JSR/BAG/2019-2020/W2.01255/e-GP/20241024/453990/00203078
|
Office of the Upazila Engineer, LGED, Bagherpara, Jessore |
BDT 73.69 lakh |
10 May 2020 |
Completed |
|
Construction of additional class room B.T. Toilkup under PEDP4 Bagherpara Jashore
e-Tender/PEDP4/JSR/BAG/2019-20/W2.01183/e-GP/20241024/449166/00203076
|
Office of the Upazila Engineer, LGED, Bagherpara, Jessore |
BDT 66.57 lakh |
10 May 2020 |
Completed |
|
Construction of additional class room Chatiantla under PEDP4 Bagherpara Jashore
e-Tender/PEDP4/JSR/BAG/2019-2020/W1.00587/e-GP/20241024/453986/00203074
|
Office of the Upazila Engineer, LGED, Bagherpara, Jessore |
BDT 91.78 lakh |
10 May 2020 |
Completed |
|
Construction of additional class room Ramkrishnapur under PEDP4 Bagherpara Jashore
e-Tender/PEDP4/JSR/BAG/2019-20/W1.00550/e-GP/20241024/449159/00203090
|
Office of the Upazila Engineer, LGED, Bagherpara, Jessore |
BDT 90.24 lakh |
10 May 2020 |
Completed |
|
Construction of additional class room Basuary Eshaitkhali under PEDP4 Bagherpara Jashore
e-Tender/PEDP4/JSR/BAG/2019-2020/W1.00588/e-GP/20241024/453987/00203062
|
Office of the Upazila Engineer, LGED, Bagherpara, Jessore |
BDT 99.59 lakh |
10 May 2020 |
Completed |
|
Construction of additional class room B. P. under PEDP4 Bagherpara Jashore
e-Tender/PEDP4/JSR/BAG/2019-20/W2.01180/e-GP/20241024/449161/00203089
|
Office of the Upazila Engineer, LGED, Bagherpara, Jessore |
BDT 67.37 lakh |
10 May 2020 |
Completed |
|
Maintenance of Overlay Borhangonj - Sikder Hat - Moniram - Mirzakalu Road at Ch- 4000m - 8365m Road Id 509212005
BOR/M-353/e-GP/20241227/400549/00240502
|
Office of the Executive Engineer, LGED, Bhola |
BDT 1.18 crore |
6 Feb 2020 |
Completed |
|
Maintenance of Overlay Borhanuddin - Chowmuhunir hat Road at CH- 800m - 7470m Road Id 509213001
BOR/M-355/e-GP/20241227/400552/00240501
|
Office of the Executive Engineer, LGED, Bhola |
BDT 2.09 crore |
6 Feb 2020 |
Completed |
|
Construction of Two 2 Storied Rural Market Building With 04 Storied Foundation in Kunjer Hat Under Borhanuddin Upazila Dist Bhola.
CRMIDP/BHL/W-206/e-GP/20241225/410632/00239883
|
Office of the Executive Engineer, LGED, Bhola |
BDT 1.88 crore |
2 Feb 2020 |
Completed |
|
Construction of 15.00m Long RCC Girder Bridge on Muguria Bazar - UZR 2002 Fazle Rahman Munsi Bari Mosque via Bangla Bazar at Ch. 1250km. Road ID No. 509544004.
IBRP/Bho/Lal/Brg-05/e-GP/20241225/400586/00239800
|
Office of the Executive Engineer, LGED, Bhola |
BDT 1.22 crore |
19 Jan 2020 |
Completed |
|
Construction of barbed wire fencing with beautification along the right bank of Khowai river at masulia from km 50.200 km 50.420220 m in C/W Khowai river system project under NDR Budget under Habiganj O & M division during the year 2019-20
WR-02/2019-20/e-GP/20231116/381417/00129372
|
Habiganj O&M Division |
BDT 6.30 lakh |
17 Nov 2019 |
Completed |
|
Rehabilitation of Kashipur UP Dhopadha RHD more Arenda-Manikgonj hat Road from Ch. 00m-1800m Road ID-265523003 Under Lohagara Upazilla Dist Narail.
e-Tender/LGED/NRL/GOBM/19-20/W-24/e-GP/20241026/376495/00204318
|
Office of the Executive Engineer, LGED, Narail |
BDT 1.10 crore |
6 Nov 2019 |
Completed |
|
A Improvement of Batashi Sluice Gate-Siddique Molla House Road Ch. 00-1260m by BC Road ID- 265525160 Salvage Cost Tk 737035.00 B Improvement of Salnagar UP Office-Rajapur via Shekpara Batashi Primary School Road Ch. 1000-2000m by BC Road ID- 265524071 Salvage Cost Tk 62968.00 C Improvement of Noldi Nowapara School-Esakoti Bil Road Ch. 00-1080m by BC Road ID- 265525317 Salvage Cost Tk 147599.00 D Improvement of Noldi Chakulia School-Ruhul Shikder House Road Ch. 500-1115m by BC Road ID- 265525288 Salvage Cost Tk 1005961.00 E Improvement of Chardaulatpur-Kheyaghat Road Ch. 1400-2400m by BC Road ID- 265524046 Salvage Cost Tk 1687412.00 Under Lohagara Upazila Dist Narail.
JRRIDP/18/NRL/W-08/e-GP/20241126/319324/00223522
|
Office of the Executive Engineer, LGED, Narail |
BDT 3.25 crore |
16 Jun 2019 |
Ongoing |
|
Repair of 4 no Water Control StructuresHatabo Kandhabpur Darikandi Rupsi in connection of NNIP Block-A/1 Irrigation Project at Bhulta & Golakanthail RupganjNarayanganj under Dhaka O&M Division-1 during 2018-19
OTM/ NNIP/ work-24/18-19 /e-GP/20231127/299871/00139990
|
Dhaka O&M Division-1 |
BDT 14.88 lakh |
22 May 2019 |
Completed |
|
1. Construction of class room of DR. ANOWAR SHAMSUN NAHER Under NBIDNNGPS 2. Construction of class room of BONDO TAKURIA Under NBIDNNGPS
e-Tender/NBIDNNGPS/TAN/DHA/2018-19/W1.01555/e-GP/20231120/310974/00132562
|
Office of the Upazila Engineer, LGED, Dhanbari, Tangail |
BDT 1.40 crore |
15 May 2019 |
Completed |
|
Protective work at Barudi-Chotakia along the right bank of Meghna river from km 0.000 to km 0.690 in upazila Sonargaon Dist-Narayangonj under Dhaka O&M Division-1BWDB DHaka
e-T/Narayanganj/ OTM/Barudi-Chotakia/e-GP/20231127/308203/00139992
|
Dhaka O&M Division-1 |
BDT 5.02 crore |
22 Apr 2019 |
Ongoing |
|
Removal of garbage hyacinth spoil earth vegetables and other obstacles fromi SDC-1 km.0.000 to km.1.200 1.200km ii SDC-2 km 0.000 to km 0.900 0.900km iii SDC-3 km.0.000 to km.4.000 4.000km iv SDC-4km 0.000 to km 2.000 2.000kmv SDC-5 km.0.000 to km5.000 5.000 km total13.100kmNNIP Block-A/1 under Operating Expenses Former Non-Development Revenue Budget of Dhaka O&M Division-1 BWDB Dhaka during the year 2018-19.
OTM/ NNIP/ work-10/18-19/e-GP/20231127/259265/00139989
|
Dhaka O&M Division-1 |
BDT 12.03 lakh |
1 Apr 2019 |
Completed |
|
Embankment cum road with temporary protective work at Kalapaharia along the right bank of Meghna branch river from Purbakanda Shaheb Bazar to Kadmirchar Govt. Primary School from km 0.182 to km 0.266 total 0.084 km in Upazila-Araihazar District- Narayanganj under NDR budget of Dhaka O&M Division-1 BWDB Dhaka during the year 2018-2019
e-T/Narayanganj/ OTM/Kalapaharia/e-GP/20231127/294599/00139991
|
Dhaka O&M Division-1 |
BDT 40.26 lakh |
12 Mar 2019 |
Completed |
|
Repair maintance and replacement of Tiles Drain Window Door at Anandapur BWDB colony under Habiganj O&M Division BWDB Habiganj during the year-2018-19.
Package No - Habiganj -WR-06/2018-19/e-GP/20231116/281999/00127853
|
Habiganj O&M Division |
BDT 4.49 lakh |
7 Feb 2019 |
Completed |
|
Precautionary Protective work at Machulia along the right bank of Khowai river from km 50.000 to km 50.170 total 170 m in c/w Khowai River System in Upazila Habiganj Sadar Dist.Habiganj under NDR Budget under Habiganj O&M Division BWDB Habiganj during the year-2018-19.
Package No - Habiganj -WR-03/2018-19/e-GP/20231116/281996/00127864
|
Habiganj O&M Division |
BDT 76.35 lakh |
7 Feb 2019 |
Completed |
|
Re-excavation of Dhamai River from km 9.000 to 15.000 6000 m under Moulvibazar O&M Division in c/w Re-excavation of small river khal & water bodies in 64 Districts Phase-1 during the year 2018-19 & 2019-20.
Moulvibazar-W 17/2018-19/e-GP/20231217/269088/00155109
|
Moulvibazar O&M Division |
BDT 3.24 crore |
6 Jan 2019 |
Ongoing |
|
Re-excavation of Small River/Khal/Pond for A to Z Hospital Adjacent chotka bill baya nagra khal from km 0.00 to km 12.750 km at Narayanganj Sadar Upzilla Dist-Narayanganj in connection with Re-excavation of small river khal & water bodies in 64 Districts Phase-1 Project under Dhaka O&M Division-1 BWDB Dhaka during the year 2018-19.
Narayanganj/W-09/2018-19/e-GP/20231127/259888/00140580
|
Dhaka O&M Division-1 |
BDT 3.67 crore |
6 Dec 2018 |
Ongoing |
|
Re-excavation of Small River/Khal/Pond for Golakandail to Baliapara khal from km 0.00 to km 5.42 km at Rupganj Upzilla Dist-Narayanganj in connection with Re-excavation of small river khal & water bodies in 64 Districts Phase-1 Project under Dhaka O&M Division-1 BWDB Dhaka during the year 2018-19
Narayanganj/W-06/2018-19/e-GP/20231122/259885/00135091
|
Dhaka O&M Division-1 |
BDT 1.10 crore |
6 Dec 2018 |
Completed |
|
Re-Excavation of Alkatar Parbatkai khal from km0.00 to km 4.00 total 4.00 km in c/w Re-excavation of small river khal & water bodies in 64 districts project Phase-I in Upazila- Habiganj Sadar District- Habiganj under Habiganj O&M Division BWDB Habiganj during the year 2018-19. Package No - Habiganj -W-01/2018-19
Habiganj-W-01/2018-19/e-GP/20231116/258863/00129162
|
Habiganj O&M Division |
BDT 1.15 crore |
2 Dec 2018 |
Completed |
|
Re-excavation of Mora Juri River from km 0.000 to 4.700 4700 m under Moulvibazar O&M Division in c/w Re-excavation of small river khal & water bodies in 64 Districts Phase-1 during the year 2018-19 & 2019-20.
Moulvibazar-W 14/2018-19/e-GP/20231213/256241/00153395
|
Moulvibazar O&M Division |
BDT 2.19 crore |
28 Nov 2018 |
Ongoing |
|
Re-excavation/Maintenance of 01One Nos. Pond owned by Zila Parishad of Lalmonirhat at Hatibandha Upazila under Water Preservation and Safe Water Supply Project.FY 2017-2018
000/e-GP/DPHE/2023-07-11/00191381
|
Office of the Executive Engineer ,DPHE, Lalmonirhat |
BDT 25.76 lakh |
24 Apr 2018 |
Completed |
|
Construction of DOKIN VAUTLI Primary School Under NBIDNNGPS Project-1
e-Tender/NBIDNNGPS/MDR/KAL/2017-18/W1.00090/e-GP/20231219/170095/00155722
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
BDT 58.94 lakh |
7 Mar 2018 |
Completed |
|
Construction of ARUAKANDI Primary School Under NBIDNNGPS Project-1
e-Tender/NBIDNNGPS/MDR/KAL/2017-18/W1.00185/e-GP/20231219/170103/00155677
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
BDT 66.26 lakh |
7 Mar 2018 |
Completed |
|
Construction of class room of Char Biladia Government Primary SchoolUpazila-LohagaraDist-Narail.
e-Tender/NBIDGPS/NRL/LOH/2017-18/W1.00503/e-GP/20241103/169419/00210654
|
Office of the Upazila Engineer, LGED, Lohagara, Narail |
BDT 75.07 lakh |
5 Mar 2018 |
Completed |
|
Construction of class room of SON MONDII Government Primary school under NBIDGPS Project-1 Vertical-3 rooms
e-Tender/NBIDGPS/MDR/KAL/2017-2018/W1.00041/e-GP/20231219/158661/00155884
|
Office of the Upazila Engineer, LGED, Kalkini, Madaripur |
BDT 34.68 lakh |
4 Mar 2018 |
Completed |
|
Construction of Class Room of HONUMANER CHAR Government Primary School Under NBIDGPS Project-1 Jamalpur Sadar Jamalpur.
e-Tender/NBIDGPS/JML/SAD/2017-18/W1.00517/e-GP/20231029/164514/00118630
|
Office of the Upazila Engineer, LGED, Jamalpur Sadar, Jamalpur |
BDT 75.57 lakh |
19 Feb 2018 |
Completed |
|
Construction of KHOAJPUR union porishod complex Bhaban under Madaripur sadar
e-Tender/UCCP-2/MDR/SAD/2017-18/W3/e-GP/20231101/157936/00120360
|
Office of the Upazila Engineer, LGED, Madaripur Sadar, Madaripur |
BDT 1.36 crore |
4 Feb 2018 |
Completed |
|
Improvement of Kafuria UP Office at Takia - Agdigha hat road Ch. 1900 - 2900m under Natore Sadar Upazila District Natore. Road ID no. 169633010 Cost of Salvaged Materials Taka 3650.00
GRDRIDP-Nat-UNR-21/17-18/e-GP/20240910/156857/00174109
|
Office of the Executive Engineer, LGED, Natore |
BDT 49.94 lakh |
25 Jan 2018 |
Completed |
|
Precautionary Protective work at Tetoiya along the left bank of Khowai River from km 47.785 to km 47.915 total130.00m in C/W Khowai river System Project under NDR in Upazila- Habiganj sadar District- Habiganj under Habiganj O&M Division BWDB Habiganj during the year 2017-18.
WR-02/2017-18/e-GP/20231116/157593/00127849
|
Habiganj O&M Division |
BDT 87.60 lakh |
24 Jan 2018 |
Ongoing |
|
Improvement of Dhaka Sylhet Highway to Pinna house via Dc Shddqur house road Dhaka Sylhet Highway road to Brammadi GC via Siddqur Rahman house to Brammadi Nobi Nawas house road at Ch. 500-2650m Road ID No 358765385
GDP-II/NAR/Shib/WR-105/e-GP/20231116/155166/00129391
|
Office of the Executive Engineer, LGED, Narshingdi |
BDT 1.09 crore |
23 Jan 2018 |
Completed |
|
Improvement of bailabo akabors house pucca road prothan bari via nimairtak via kakerbase school road boilabakbar house to prothanbari ninaittek via dopathor gps road at ch 500-2500 m road id 358765204
GDP-II/NAR/SHIB/WR-103/e-GP/20231028/155169/00117883
|
Office of the Executive Engineer, LGED, Narshingdi |
BDT 1.09 crore |
22 Jan 2018 |
Completed |
|
Improvement of Sluice Gate Bazar-Mohishasura UP Office via Chanderpara & Balushair Road from ch. 1738-3000m under Sadar Upazila Dist Narsingdi.Road Id 368603032 salvage cost tk 690107
IRIDP-2/NSD/DW-182/e-GP/20231028/146657/00117881
|
Office of the Executive Engineer, LGED, Narshingdi |
BDT 72.97 lakh |
28 Dec 2017 |
Completed |