Ownership

Something wrong here? Ask for a correction

Ownership, price benchmarks and eligibility checks come with Pro. Start with free alerts.

Get new tenders for Nilphamari every morning and afternoon, free

Enter your mobile number, or start it on Telegram in one tap. No login.

Free · no login · stop any time

Biggest competitors

Awards

1,395 results
Package Office (PE) Amount Contract date
Trea Planatation on Ambia Khanam Mahila Madrasa to Shibpur Border via Nagora High School Road at Ch. 00.00m- 1740.00m & 2385 00m-6685.00m Under Daulatkhan Upazia District. Bhola Road ID: (509292007) (Effective length For Tree Planatation = 6.00km

Bhola · Tenders →

Office of the Executive Engineer, LGED, Bhola BDT 10.90 lakh 26 Oct 2026
Tree Planatation on Jhalakathi RHD Bermohal via himanandakathi RHD Road at Ch. 13050.00m- 17548.00m Under Sadar Upazila. District. Jhalakathi Road ID: (542402001) (Effective length For Tree Planatation = 4.49 km)

Jhalokathi · Tenders →

Office of the Executive Engineer, LGED, Jhalakathi BDT 7.90 lakh 30 Sep 2026
Tree Planatation on Barishal pirojpur RHD (Gabkhan Bridge) Guaton Bazar via Sekerhat UP Road at Ch. 14610.00m- 19065.00m Under Sadar Upazila. District. Jhalakathi Road ID: (542402005) (Effective length For Tree Planatation = 4.455km)

Jhalokathi · Tenders →

Office of the Executive Engineer, LGED, Jhalakathi BDT 7.80 lakh 30 Sep 2026
Tree Planatation on Chowmohona GC via Bisherkandi Umarerper Batiaghata Wazedia - RHD (Baisary) at Ch. 6056.00m- 15600.00m Under Banaripara Upazila. District. Barishal Road ID: (506102001) (Effective length For Tree Planatation = 6.00 km).

Barishal · Tenders →

Office of the Executive Engineer, LGED, Barishal BDT 11.00 lakh 6 Sep 2026
Re-excavation of Ardhipara Khal in between Km 0.00 to Km 6.80 = 6.80 Km at Sreenagar Upazila District in Munshiganj under Munshiganj Water Development Division BWDB Munshiganj.

Dhaka · Tenders →

Munshiganj WD Division BDT 1.72 crore 16 Aug 2026
Re-Excavation of Bhagyakul Khal from Km 1.455 to km 4.675 = 3.22 Km at Sreenagar Upazila District in Munshiganj under Munshiganj Water Development Division BWDB Munshiganj.

Dhaka · Tenders →

Munshiganj WD Division BDT 88.50 lakh 16 Aug 2026
Procuring of Materials i.g. Geo Tube and Sand for Road Sub-Division-1 Feni under Feni Road Division during the year 2025-2026

Feni · Tenders →

Feni Road Division BDT 26.30 lakh 29 Jul 2026
Bank protection work on left bank of Tangon River at Shahpara Area from km. 30.565 to Km. 30.900 = 335.00 m in Upazila-Thakurgaon Sadar District-Thakurgaon.

Thakurgaon · Tenders →

Thakurgaon WD Division BDT 3.38 crore 25 Jun 2026
Supply Filling & Dumping of 3000 Nos 175kg Geo-bag (Polyster) at Different Vulnerable Points of Natore District for Emergency Flood Mitigation in C/W NDR Budget Under Natore WD Division BWDB Natore.

Natore · Tenders →

Natore WD Division BDT 9.30 lakh 17 Jun 2026
Conducting a Pre-Work Survey for River Morphological Data Collection Including Bathymetric Survey Riverbank Topographic Survey and Spot Level Measurement in the Project Areas of Fulchari (Gaibandha District) and Kalihati (Tangail District).

Dhaka · Tenders →

Office of the Project Director, Jamuna River Sustainable Management Project-1 Riverbank Protection and Riverbank Training (Component-1) BDT 16.00 lakh 11 Jun 2026
Small scale water resources works for Belgapur -Julupara Subproject under Niamatpur upazila of Naogaon

Naogaon · Tenders →

Office of the Executive Engineer, LGED, Naogaon BDT 69.20 lakh 10 Jun 2026
Repair work of 4 nos IPS under O&M Budget 2025-25 of Saidpur WD Division BWDB Saidpur Nilphamari.

Nilphamari

Syedpur WD Division BDT 1.60 lakh 10 Jun 2026
Re-excavation of 06 KM Khal/Khari including 2 sides dyke formation and maintain proper slope as per approved design In 05 no: Rasulpur 06 no: Paroil 07 no: srimantapur and 08 no: Bahadurpur union in Naogaon at Niamatpur Upazila.

Naogaon · Tenders →

RDRS-ECCCP-Drought BDT 1.09 crore 10 Jun 2026
Work for mutation/record correction of acquired land under O&M Budget 2025-26 of Saidpur WD Division BWDB Saidpur Nilphamari.

Nilphamari

Syedpur WD Division BDT 2.00 lakh 7 Jun 2026
Various Projects/River survey work under O&M Budget 2025-26 of Saidpur WD Division BWDB Saidpur Nilphamari.

Nilphamari

Syedpur WD Division BDT 5.00 lakh 7 Jun 2026
Repair & Maintance of Kharkharia Left Food Control Embankment in between km. 7.500 to 8.000 = 150.00 m under Saidpur WD Division BWDB Saidpur Nilphamari during year 2025-2026.

Nilphamari

Syedpur WD Division BDT 3.00 lakh 7 Jun 2026
Printing and Binding works in c/w "Revitalization of the Alaikuri River in Rangpur District".

Rangpur

Rangpur WD Division BDT 1.00 lakh 24 May 2026
Survey work of Alaikuri River in c/w "Revitalization of the Alaikuri River in Rangpur District".

Rangpur

Rangpur WD Division BDT 2.00 lakh 24 May 2026
Repair and Maintanance work of Alal Salafaq Crossbar at Teesta Right Flood Control Embankment in Upazila: Gangachara Dist: Rangpur under Rangpur WD Division BWDB Rangpur.

Rangpur

Rangpur WD Division BDT 5.70 lakh 24 May 2026
Repair Maintenance and painting work of sub-divisional office-2 under rangpur WD division BWDB Rangpur.

Rangpur

Rangpur WD Division BDT 2.00 lakh 24 May 2026
Construction of Out-let (1V-0.900mm) at km 18.200 km in Polder no. 55/2B under Patuakhali WD Division BWDB Patuakhali.

Patuakhali · Tenders →

Patuakhali WD Division BDT 36.70 lakh 12 May 2026
Repair of 1 Nos. Culvert at km. 4.000 of S9D Irrigation Canal under O&M Budget 2025-26 of Saidpur WD Division BWDB Saidpur Nilphamri.

Nilphamari

Syedpur WD Division BDT 2.00 lakh 11 May 2026
Repair & Maintenance of Revetment work on the Right Bank of Jmunneswary River at Sonnashi para in Upazila Kishoregonj Dist. Nilphamari under Saidpur Water Development Division BWDB Saidpur Nilphamari under O & M Bugdet during the year 2025-2026.

Nilphamari

Syedpur WD Division BDT 2.00 lakh 11 May 2026
Repair of 1 Nos. Syphon at km. 5.700 of S8D Irrigation Canal under O&M Budget 2025-26 of Saidppur WD Division BWDB Saidpur Nilphamri.

Nilphamari

Syedpur WD Division BDT 3.00 lakh 11 May 2026
Repair & Maintenance of Revetment work on the Left Bank of Chikly River at Kashiram Belpukur in Upazila Saidpur Dist. Nilphamari under Saidpur Water Development Division BWDB Saidpur Nilphamari under O&M Bugdet during the year 2025-2026.

Nilphamari

Syedpur WD Division BDT 2.00 lakh 11 May 2026
Re-excavation of Barnai River from km 45.450 to km 47.300 = 1.850 km in C/W "Re-Excavation Pollution Mitigation and Eviction of Barnai River in Rajshahi & Natore District" in Rajshahi District under Rajshahi WD Division BWDB Rajshahi. (Package No- Raj/EW-03)

Rajshahi · Tenders →

Rajshahi WD Division BDT 2.22 crore 7 May 2026
Establishment of Signboard and Change of Name plate in Different Office at Northan Zone BWDB rangpur. Under Rangpur WD Division during the FY- 2025-26.

Rangpur

Rangpur WD Division BDT 1.60 lakh 7 May 2026
Repair and Maintanance Work of Motorcycle at Rangpur WD Sub-Division-1 WD Sub-Division-2 and Kishorganj WD Sub-Division Office under Rangpur WD Division during the Financial Year 2025-2026.

Rangpur

Rangpur WD Division BDT 1.50 lakh 7 May 2026
Supply of Stationary materials for office of the Add. Cheif Engineer Northern Zone Rangpur office of the Rangpur WD Circle-1 and office of the Rangpur WD Division BWDB Rangpur under Rangpur WD Division during the Financial Year 2025-2026.

Rangpur

Rangpur WD Division BDT 3.00 lakh 7 May 2026
Precautionary slope protection work at Sabrang Tourism Park from Km. 3.860 to Km. 4.300=440 m. of Upazila-Teknaf and District-Coxs Bazar under Coxs Bazar WD Division-01 BWDB Coxs Bazar during the year 2025-26

Cox's Bazar · Tenders →

Cox's Bazar WD Division BDT 3.68 crore 7 May 2026
Precautionary slope protection work at Sabrang Tourism Park from Km. 3.000 to Km. 3.430=430 m. of Upazila-Teknaf and District-Coxs Bazar under Coxs Bazar WD Division-01 BWDB Coxs Bazar during the year 2025-26

Cox's Bazar · Tenders →

Cox's Bazar WD Division BDT 3.53 crore 7 May 2026
Repair and Maintenance of raincuts at different places in between km. 11.500 to km 18.000 = 500 m of Karatoya left FC embankment at Bengulia Goneshpur Jaiturbala and Shishudoho in Palashbari Upazilla Dist. Gaibandha under Gaibandha WD Division BWDB Gaibandha during the Financial Year 2025-2026.

Gaibandha · Tenders →

Gaibandha WD Division BDT 8.60 lakh 5 May 2026
Repair and Maintenance of ghogs or holes raincuts work at different places along the Right bank flood control embankment in between km. 2.00 to km 3.900 = 325.25 m at David Companypara in Gaibandha sadar Upazilla Dist. Gaibandha under Gaibandha WD Division BWDB Gaibandha during Financial Year 2025-2026.

Gaibandha · Tenders →

Gaibandha WD Division BDT 8.60 lakh 5 May 2026
Precautionary work along the Right Embankment of Teesta River from km.42.975 to km.43.230= 255.0 m at Alshiapara in Upazila: Jaldhaka Dist. Nilphamari under Rangpur WD DivisionBWDBRangpur during the year-2025-2026.

Rangpur · Tenders →

Rangpur WD Division BDT 38.80 lakh 5 May 2026
Precautionary Bank protective work in the left bank of Branch Titas River from K.m. 3.865 to K.m. 4.025 =160m at Homna Upazilla District-Cumilla under Cumilla WD Division BWDB Cumilla during the year 2025-2026.

Cumilla · Tenders →

Cumilla WD Division, BWDB BDT 1.17 crore 29 Apr 2026
Pre work & Post work Survey of different works of Operation & Maintenance budget under Dinajpur WD Sub-Division-2 under Dinajpur WD Division BWDB Dinajpur in c/w O&M budget during the year 2025-2026.

Dinajpur

Dinajpur WD Division BDT 2.00 lakh 20 Apr 2026
Resectioning work of existing FCDI embankment (North Side) from ch.km. 91.290 to ch.km. 91.640 = 350.00 m at parerhat Asrayun Prokolpo and adjacent area in Parerhat Union Indurkani Upazila Perojpur District under Pirojpur WD Division BWDB Perojpur During the� FY2025-26.

Pirojpur · Tenders →

Perojpur WD Division BDT 41.50 lakh 7 Apr 2026
Precautionary Bank Protection work along the left bank of Madhumati river from km 0.880 to km 1.330 = 450.00m at Dignagar in c/w "Bank Protective Works to protect the connecting road to Shahid Birsreshtho Munshi Abdur Rouf Smriti Museum including other areas and dredging project " in Upazilla -Alfadanga District -Faridpur under Faridpur WD Division BWDB Faridpur

Faridpur · Tenders →

Faridpur WD Division BDT 4.47 crore 6 Apr 2026
Precautionary Bank Protection work along the left bank of Madhumati river from km 0.400 to km 0.700=300.00m at West Narandia in c/w "Bank Protective Works to protect the connecting road to Shahid Birsreshtho Munshi Abdur Rouf Smriti Museum including other areas and dredging project" in Upazilla-Alfadanga District -Faridpur under Faridpur WD Division BWDB Faridpur.

Faridpur · Tenders →

Faridpur WD Division BDT 3.20 crore 6 Apr 2026
Work for correction of unrecorded acquired land under Rangpur WD Division BWDB Rangpur in the financial year 2025-26.

Rangpur

Rangpur WD Division BDT 2.90 lakh 5 Apr 2026
Part-01: Re-excavation for the Canal from Kutura Bridge (25.064562 88.661910) to Komolpur Eidghah Math (25.057494 88.648693) & Part-02: for the Canal from Mothurapur Bill (25.034186 88.728967) to Katabari Ghat (25.020080 88.727358)

Rajshahi · Tenders →

SB-ECCCP-Drought BDT 1.26 crore 31 Mar 2026
Single

Naogaon · Tenders →

SSS-Ecccp-Drought BDT 1.35 crore 29 Mar 2026
Precautionary Bank Protection Work along the left bank of Padma River at Kathuliya Union: Varara Upazilla: Pabna Sadar District Pabna From Km 12.310 to Km. 12.750 = 440.00 m in C/W PIRDP Under the Pabna WD Division BWDB Pabna During the FY: 2025-2026.

Pabna · Tenders →

Pabna WD Division BDT 3.81 crore 16 Mar 2026
Strengthening work of existing Emergency Work implemented in the FY 2022-23 by sand-cement gunny bag to protect the Sannyasipara Guchhagram of Bahagili Union from the erosion of the right bank of the Jamuneshwari River from km. 88.200 to km. 88.275=75.00m in Kishorganj Upazila of Nilphamari District under O&M Budget 2025-26 of Saidpur WD Division BWDB Saidpur.

Nilphamari · Tenders →

Syedpur WD Division BDT 10.50 lakh 15 Mar 2026
Precautionary Protective Work at Noyahati to Bir Charmadhua from km. 0.590 to km. 0.690 = 100 m along the Left bank of Meghna River at Union: Charmadhua Upazila: Raipura Dist: Narsingdi under Narsingdi WD Division BWDB Narsingdi during the FY 2025-26

Narsingdi · Tenders →

Narsingdi WD Division BDT 1.02 crore 10 Mar 2026
Re-excavation of Mirja Mahmud Khal from km 0.000 to km 2.750 = 2.750 km in Natore District under Natore WD Division BWDB Natore.

Natore · Tenders →

Natore WD Division BDT 1.64 crore 8 Mar 2026
Precautionary work to protect the Right bank of Teesta River from Km. 38.205 to km. 38.295 =90.00 meters at Dowabari in Upazila: Jaldhaka Dist: Nilphamari Under Dalia WD Division BWDB Dalia Nilphamari during the financial year 2025-26. (Pakage No: Dalia/NDR/PW-08/25-26.)

Nilphamari · Tenders →

Dalia WD Division BDT 41.00 lakh 2 Mar 2026
Re-excavation of Sukhanar khal from km: 0.000 to km: 0.950 in between total 0.950 km in c/w small river and canal re-excavation project at Upazila Shajahanpur District Bogura under Bogura WD Division BWDB Bogura during the FY 2025-2026.

Bogura · Tenders →

Bogura WD Division BDT 10.30 lakh 2 Mar 2026
Supply and installation of CCTV cameras to strengthen security in office premises under Shewra Beel Sub-project under Bogura WD Division BWDB Bogura in the FY 2025-26.

Bogura · Tenders →

Bogura WD Division BDT 4.40 lakh 2 Mar 2026
Re-excavation of Gograjola to Krishnopur khal from km. 0.000 to km. 2.750 = 2.750 km at Upazila-Chandina under Cumilla W.D Division BWDB Cumilla during the year 2025-26.

Cumilla · Tenders →

Cumilla WD Division, BWDB BDT 54.40 lakh 2 Mar 2026

Contract progress

141 results
Description Office (PE) Value Contract date Status
Construction of Regulator Name Plate in c/w Chilimpur-Chaligram Sub- project under Naogaon O&M Division BWDB, Naogaon during the FY 2023-2024.

OTM-5/2023-2024/e-GP/20241017/911416/00198067

Naogaon O&M Division BDT 1.69 lakh 30 Nov 2023 Completed
Repair of Existing Damaged Bank Protection Work & Ancillary Work in various places in C/W "Raktadaha-Lohachura Beel Drainage Scheme" under Naogaon O&M Division, BWDB, Naogaon during the FY 2023-2024.

OTM-6/2023-2024/e-GP/20241022/911417/00202035

Naogaon O&M Division BDT 5.80 lakh 30 Nov 2023 Completed
Construction of Regulator Name Plate in c/w Construction of Embankment on Right Bank of Atrai River Project under Naogaon O&M Division BWDB, Naogaon during the FY 2023-2024.

OTM-3/2023-2024/e-GP/20241028/911406/00205393

Naogaon O&M Division BDT 2.54 lakh 30 Nov 2023 Completed
Dumping of CC Block to Protect the Foundation of Kashiabari Regulator in upazila- Atrai, District-Naogaon in C/W "Raktadaha-Lohachura Beel Drainage Scheme" under Naogaon O&M Division, BWDB, Naogaon during the FY 2023-2024.

OTM-1/2023-2024/e-GP/20241017/910399/00197967

Naogaon O&M Division BDT 4.37 lakh 30 Nov 2023 Completed
Tree Plantation works at right bank of flood control embankment of Tulshiganga River from km. 3.900 to km. 4.400 = 500 m and from km. 6.400 to km. 6.800 = 400 m Total 900 m in Khetlal upazilla of Joypurhat District Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.

JOY/OB/OTM/W-05/23-24/e-GP/20241120/902186/00220848

Joypurhat WD Division BDT 19.80 lakh 19 Nov 2023 Completed
Tree Plantation works at right bank of flood control embankment of Tulshiganga River from km. 3.000 to km. 3.900 = 900 m in Sadar & Khetlal upazilla of Joypurhat District Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.

JOY/OB/OTM/W-04/23-24/e-GP/20241120/902185/00220834

Joypurhat WD Division BDT 17.82 lakh 15 Nov 2023 Completed
Tree Plantation works in C/W different Completed projects Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.

JOY/OB/OTM/W-02/23-24/e-GP/20241124/902181/00222180

Joypurhat WD Division BDT 17.82 lakh 15 Nov 2023 Completed
Tree Plantation works at Little Jamuna left bank flood control embankment from km. 6.200 to km. 6.800 = 600 m in Sadar upazilla of Joypurhat District Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.

JOY/OB/OTM/W-03/23-24/e-GP/20241120/902184/00220807

Joypurhat WD Division BDT 8.91 lakh 15 Nov 2023 Completed
Afforestation on the different Embankment in Rehabilitation of 3 Nos Project in Upazila-Dhamurhat, Patnitala & Mohadevpur, District-Naogaon and Bank Protection Project including Dredging of Atrai River under Naogaon O&M Division, BWDB, Naogaon during the Year 2023-2024.

Nao-W-16/e-GP/20241022/862546/00202036

Naogaon O&M Division BDT 9.00 lakh 16 Aug 2023 Completed
River bank rehabilitation work from km 6.500 to km 7.500= total 1.000 km in c/w Rajshahi Town Protection Project under Rajshahi O & M Division, BWDB, Rajshahi in FY 2022-23.

NDR/RTPP/OTM/04/e-GP/20241203/838309/00227151

Rajshahi O&M Division BDT 22.80 lakh 25 May 2023 Completed
Coloring, Greasing and Ancillary work of Borodhor 12-vent & Katadhar 2 vent regulator and Obstacle in c/w Naogaon Polder-1 Sub Project in upazila-Raninagar,District-Naogaon under Naogaon O&M Division, BWDB, Naogaon during the FY-2022-2023.

OTM-04/2022-23/e-GP/20230818/819946/0078041

Naogaon O&M Division BDT 3.74 lakh 18 Apr 2023 Completed
Construction of Inlet/Outlet at Hapania Bazar in C/W Jobaibeel FCDI project in Upazila: Sapahar, District: Naogaon under Naogaon O&M Division, BWDB, Naogaon during the FY 2022-2023.

OTM-06/2022-23/e-GP/20241019/819948/00198497

Naogaon O&M Division BDT 3.85 lakh 18 Apr 2023 Completed
Civil Repair, Painting & Greasing of 1 Vent Shimultole, 1 Vent Nolpokra, 2 Vent Udoyshree Regulator in c/w Right Embankment of Atrai River Sub-Project in Upazila:-Dhamoirhat under Naogaon O&M Division, BWDB, Naogaon during the FY-2022-2023.

OTM-09/2022-23/e-GP/20241019/819951/00198455

Naogaon O&M Division BDT 3.60 lakh 18 Apr 2023 Completed
Painting works of Boundary Wall of Rangpur Teesta Project Colony under Rangpur O&M Division, BWDB, Rangpur during the year 2022-2023.

OMB-OTM-10/e-GP/20230811/814485/0077621

Rangpur O&M Division BDT 4.50 lakh 6 Apr 2023 Completed
Repair & Maintenance works for SDE-1 General & office Bathroom, Teesta Building's Ladies' Prayer Room & Bathroom Room under Rangpur O&M Division, BWDB, Rangpur, during the years 2022-2023.

OMB-OTM-08/e-GP/20230811/814482/0077620

Rangpur O&M Division BDT 4.49 lakh 6 Apr 2023 Completed
Repair & Maintenance of Lab & Mosque of the Rangpur O&M Division, BWDB, Rangpur during the years 2022-2023.

OMB-OTM-09/e-GP/20230811/814483/0077619

Rangpur O&M Division BDT 4.50 lakh 6 Apr 2023 Completed
Eviction works of Illegal Structure Nearby Structures, Irrigation and Drainage Canal of Various Project from Non-Development Revenue Budget Under Magura O&M Division, BWDB, Magura during the FY 2022-23.

Magura/NDR-35/2022-23/e-GP/20230811/790553/0077618

Magura O&M Division BDT 2.70 lakh 23 Feb 2023 Completed
Survey and Exploration Works of Different Irrigation and Drainage Canal of Various Project of BWDB, Magura from Non-Development Revenue Budget Under Magura O&M Division, BWDB, Magura during the FY 2022-23.

Magura/NDR-34/2022-23/e-GP/20230810/790552/0077617

Magura O&M Division BDT 4.50 lakh 23 Feb 2023 Completed
Re-sectioning or Repair of Dhalai River Right Embankment from km 8.000 to km 8.290 in between 200 m at Bongaon in Kamalganj Upazilla District Moulvibazar under NDR Budget of Moulvibazar O&M Division, BWDB, Moulvibazar during the year 2022-23

MOULV/NDR/2022-23/W-08/e-GP/20231220/789308/00156327

Moulvibazar O&M Division BDT 10.25 lakh 15 Feb 2023 Completed
Re-sectioning or Repair of Embankment from km 3.000 to km 7.000 in between 300 m in Vurvurichora at Srimongol Upazilla District Moulvibazar under NDR Budget of Moulvibazar O&M Division, BWDB, Moulvibazar during the year 2022-23

MOULV/NDR/2022-23/W-11/e-GP/20231220/789311/00156332

Moulvibazar O&M Division BDT 4.01 lakh 15 Feb 2023 Completed
Temporary protection work by Geo-bag on the left bank of Gopaldi river from km 33.400 to km 33.630 = 0.230 km in polder no 55/2D of Patuakhali O&M Division, BWDB, Patuakhali during FY 2022-23.

NDR/PTK/2022-23/W-02/e-GP/20231222/784341/00156555

Patuakhali O&M Division BDT 57.91 lakh 9 Feb 2023 Completed
Annual repair work of different type of lift gates, flap gates & hoisting devices in c/w projects & sub-projects except Manu River Irrigation Project under Moulvibazar Mechanical O & M Division, BWDB, Moulvibazar during the year 2022-23.

OTM-06/MMOMD/2022-23/e-GP/20230811/785148/0077622

Moulvibazar Mech. O&M Division BDT 4.50 lakh 6 Feb 2023 Completed
Tree Plantation work both bank of Pagla River in Upazila Nawabganj Sadar & Shibganj, Dist. Chapainawabganj in C/W "Re-Excavation of small River, Channel and water bodlies in 64 districts (1st Phase) (2nd Revised)" Project Uuder Nawabganj O&M Division, BWDB, Chapainawabganj during the FY 2022-2023.

OM/Tree-01/2022-2023/e-GP/20230814/774061/0077805

Nawabganj O&M Division BDT 22.49 lakh 11 Jan 2023 Completed
Repair/Re-sectioning of flood control embankment in between km 133.307 to km 134.000 = 535.00 meter in c/w Challan Beel Project polder-C under Rajshahi O&M Division, BWDB, Rajshahi during the Fiscal Year 2022-2023.

NDR/Polder-C/01/e-GP/20241203/777671/00227169

Rajshahi O&M Division BDT 34.19 lakh 10 Jan 2023 Ongoing
Dismantling, Repair, & Installation with paint work of 8 (Eight) vent Regulator on Nabaganga River for Magura O&M Division, under Bheramara Mechanical Division, BWDB, Bheramara, Kushtia during the FY 2022-2023.

GK/2022-23/Magura/OTM-03/e-GP/20230818/777941/0078036

Bheramara ME Division BDT 8.13 lakh 10 Jan 2023 Completed
Repair, Manufacturing & Installation of Satoir 4-Vent Regulator with paint work for Faridpur O&M Division, under Bheramara Mechanical Division, BWDB, Bheramara, Kushtia during the FY 2022-2023.

GK/2022-23/Faridpur/OTM-01/e-GP/20230818/777793/0078035

Bheramara ME Division BDT 9.76 lakh 10 Jan 2023 Completed
Repair of Little Jamuna River Left Embankment from km. 6.200 to km. 6.800 = 600.00 m in C/W Protection of Chechra Village Erosion from Little Jamuna River Border River and Tulshiganga Sub-Project in Upazilla Joypurhat Sadar, District Joypurhat under Joypurhat WD Division, BWDB, Joypurhat during the FY: 2022-23.

JOY/NDR/OTM/W-10/2022-23/e-GP/20241125/769446/00222990

Joypurhat WD Division BDT 13.48 lakh 22 Dec 2022 Ongoing
Completion of incomplete works of " River Bank Protective Work along the left bank of Dhaleswari river in c/w Babupur-Lauhati FCD Project for a length of 400m (from km 11.320 to km 11.720) in UZ: Delduar of Tangail district during the year 2017-18" under NDR budget during the year 2021-22.

NDR/Gaskumulli/21-22/e-GP/20220920/682745/0042920

Tangail O&M Division BDT 13.51 lakh 4 Apr 2022 Completed
Repair, Manufacturing & Installation of 02 (two) no's vertical lift gate (Size:1.50m x 1.80m), 04 (four) no's Pedestal Type hoisting device with paint work for Modonkhali and jakersurra Regulator for Faridpur O&M Division, under Bheramara Mechanical Division, BWDB, Bheramara, Kushtia during the FY 2021-2022.

GK/2021-22/Faridpur/OTM-01/e-GP/20221210/672691/0056332

Bheramara ME Division BDT 11.47 lakh 13 Mar 2022 Completed
Temporary bank protective work at the right bank of Rahmatkhali khal Adjacent to Kalir char from km. 4.500 to km. 4.600 =0.100 K.M at tomchar union in sadar upazilla, district Lakshmipur in c/w Operation & Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2021-22 (LAK/OM/OTM/W-03/2021-2022).

LAK/OM/OTM/W-03/2021-2022/e-GP/20220921/657181/0043965

Laksmipur O&M Division BDT 6.29 lakh 7 Feb 2022 Completed
Tree Plantation Works at Various Dyke of Different Irrigation and Drainage Canal Under Non-Development Revenue Budget Under Magura O&M Division, BWDB, Magura during the FY 2021-22.

Magura/NDR-22/2021-22/e-GP/20220817/655168/0030427

Magura O&M Division BDT 3.60 lakh 6 Feb 2022 Completed
Annual repair and partial rehabilitation work of different type of gates & hoisting devices with accessories c/w projects & sub-projects except Manu River Irrigation Project under Moulvibazar Mechanical O & M Division, BWDB, Moulvibazar during the year 2021-22.

OTM-02/MMOMD/2021-22/e-GP/20220903/647439/0033390

Moulvibazar Mech. O&M Division BDT 7.60 lakh 1 Feb 2022 Completed
Strengthing and Repairing of Hasnapara Spur-1 by Geo bag at BRE Km. 110.700

Rev/OTM-05/2021-22/e-GP/20220903/648321/0033387

Bogura O&M Division BDT 8.99 lakh 25 Jan 2022 Completed
Construction of Main Gate for Derai O&M Sub-Division Office in Upazila-Derai, District-Sunamganj in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2021-2022.

Sunam-2/NDR/2021-22/OTM-03/e-GP/20231122/646628/00135328

Sunamganj O&M Division-2 BDT 6.30 lakh 10 Jan 2022 Completed
Construction of Boundary wall of Derai O&M Sub-Division Office in Upazila-Derai, District-Sunamganj in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2021-2022.

Sunam-2/NDR/2021-22/OTM-02/e-GP/20231122/646627/00135326

Sunamganj O&M Division-2 BDT 9.44 lakh 10 Jan 2022 Completed
Construction of Sign Board for road crossing River/Khal in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2021-2022.

Sunam-2/NDR/2021-22/OTM-01/e-GP/20231122/646626/00135330

Sunamganj O&M Division-2 BDT 6.66 lakh 10 Jan 2022 Completed
Breach closing of Baghabari to Nimaichora Flood Control Embankment from Km. 7.975 to Km. 8.000 Total 25.00m (near Ratanpur) and from Km. 24.484 to Km. 24.565 Total 80.00m (near Char Bhangura) Grand total 105.00m under Pabna O&M Division ,BWDB, Pabna during the FY: 2021-22

PAB/W-07/2021-22/e-GP/20220903/641523/0033370

Pabna O&M Division BDT 11.77 lakh 23 Dec 2021 Completed
Repair & Maintenance of BWDB's Office, Colony & Rest House with Mosque under Pabna O&M Division, BWDB, Pabna during the FY: 2021-22.

PAB/W-06/2021-22/e-GP/20220903/629898/0033368

Pabna O&M Division BDT 11.23 lakh 22 Nov 2021 Completed
Construction of C.C Drain at I3S19T9 irrigation canal From Km. 0.00 to Km. 0.205 Total=205.00 m in C/W PIRDP under Pabna O&M Division, BWDB, Pabna during the FY: 2021-22.

PAB/W-04/2021-22/e-GP/20220903/629887/0033372

Pabna O&M Division BDT 10.69 lakh 22 Nov 2021 Completed
Emergency repair and maintenance works to protect the slope of Embankment to control the seepage inbetween BRE km-133.280 to BRE km-133.680=400.0 m at Doripara in Upazila Sariakandi of Bogra District during the Flood of the year 2021

OTM-EMG-07-2020-2021/e-GP/20220903/587876/0033383

Bogura O&M Division BDT 18.00 lakh 17 Jun 2021 Completed
Repair maintenance and supply work for Non-residential building of Teesta Project Colony, Rangpur under Rangpur O & M Division, BWDB , Rangpur during the year 2020-2021.

Colony/OTM/Works-01/2020-21/e-GP/20220603/588066/003991

Rangpur O&M Division BDT 13.49 lakh 14 Jun 2021 Completed
Supply filling and dumping of 250 kg geo Bag for Emergency work, where and when necessary under Nawabganj O & M division BWDB, Chapainawabganj during FY-2020-2021 and 2021-2022.

NDR/Geo Bag/2020-2021/e-GP/20220621/579789/0011028

Nawabganj O&M Division BDT 40.67 lakh 20 May 2021 Completed
Repair & re-installation of 5 (Five) Nos. MS Lift Gate at Kanshat 5-Vent regulator of Nawabganj O&M Division under Bogura Mechanical Division, BWDB, Bogura During the FY 2020-21.

BMD/Gate/Nawabganj/LTM-30/2020-21/e-GP/20220621/579551/0011024

Bogura ME Division BDT 5.70 lakh 17 May 2021 Completed
Strengthening of Embankment on emergency basis Work along Left Embankment of Manu River at Khaspremnagar at 7 no. Kamarchak Up in Rajnagar Upazila Chainage from Km 43.290 to 43.400 = 110 m in c/w Tarapasha-Premnagar FC Sub-Project under Moulvibazar O&M Division during the FY 2020-21.

LTM-27/2020-2021/e-GP/20220817/573684/0030433

Moulvibazar O&M Division BDT 16.37 lakh 2 May 2021 Completed
Afforestration at different location in Lakshmipur District in c/w Operation and Maintenance Budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-2021.

LAK/OM/OTM-10/2020-21/e-GP/20220622/572968/0011069

Laksmipur O&M Division BDT 16.20 lakh 27 Apr 2021 Completed
Operates of Rahmatkhali 2 Nos 14-Vent regulator, Monpura 1-Vent Regulator, Navigation gate and Jarirdhona 4-Vent Regulator in c/w Operation and Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-21.

LAK/OM/OTM-07/2020-21/e-GP/20220622/572964/0011059

Laksmipur O&M Division BDT 2.70 lakh 27 Apr 2021 Completed
Changing Gear oil, Grease and wire rope of 14 Vent Rahmatkhali New Regulator in c/w Operation & Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-21.

LAK/OM/OTM-05/2020-21/e-GP/20220622/572962/0011040

Laksmipur O&M Division BDT 2.69 lakh 27 Apr 2021 Completed
Repair & maintenance of Rahmatkhali 14 nos. Radial gates internal metal parts of hoisting and supplying, fitting, fixing electric goods for repair of electric line device in c/w Operation & Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-21.

LAK/OM/OTM-06/2020-21/e-GP/20220622/572963/0011071

Laksmipur O&M Division BDT 2.70 lakh 27 Apr 2021 Completed
Conducting Topographic, Bathymetric and Drone survey for preparation of DPP of -Protection work at the left bank of Meghna river at Borokheri, Ludhua bazar and kader ponditer hat areas in Ramgati and Kamalnagar Upazila under Lakshmipur District" in c/w Operation and Maintenance Budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-2021.

LAK/OM/OTM-11/2020-21/e-GP/20220622/572969/0011046

Laksmipur O&M Division BDT 10.35 lakh 27 Apr 2021 Completed
Removal of Water hyacinth from Rahmatkhali Khal from Km. 13.00 to 14.00 = 1.000 Km., Km. 18.00 to 19.500 = 1.50 Km., Wapda Khal km. 6.000 to km 7.000 = 1.000 Km. in c/w Operation and Maintenance Budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-2021.

LAK/OM/OTM-04/2020-21/e-GP/20220622/572961/0011041

Laksmipur O&M Division BDT 3.59 lakh 27 Apr 2021 Completed
New tenders morning and afternoon, free Start alerts