Construction of Regulator Name Plate in c/w Chilimpur-Chaligram Sub- project under Naogaon O&M Division BWDB, Naogaon during the FY 2023-2024.
OTM-5/2023-2024/e-GP/20241017/911416/00198067
|
Naogaon O&M Division |
BDT 1.69 lakh |
30 Nov 2023 |
Completed |
|
Repair of Existing Damaged Bank Protection Work & Ancillary Work in various places in C/W "Raktadaha-Lohachura Beel Drainage Scheme" under Naogaon O&M Division, BWDB, Naogaon during the FY 2023-2024.
OTM-6/2023-2024/e-GP/20241022/911417/00202035
|
Naogaon O&M Division |
BDT 5.80 lakh |
30 Nov 2023 |
Completed |
|
Construction of Regulator Name Plate in c/w Construction of Embankment on Right Bank of Atrai River Project under Naogaon O&M Division BWDB, Naogaon during the FY 2023-2024.
OTM-3/2023-2024/e-GP/20241028/911406/00205393
|
Naogaon O&M Division |
BDT 2.54 lakh |
30 Nov 2023 |
Completed |
|
Dumping of CC Block to Protect the Foundation of Kashiabari Regulator in upazila- Atrai, District-Naogaon in C/W "Raktadaha-Lohachura Beel Drainage Scheme" under Naogaon O&M Division, BWDB, Naogaon during the FY 2023-2024.
OTM-1/2023-2024/e-GP/20241017/910399/00197967
|
Naogaon O&M Division |
BDT 4.37 lakh |
30 Nov 2023 |
Completed |
|
Tree Plantation works at right bank of flood control embankment of Tulshiganga River from km. 3.900 to km. 4.400 = 500 m and from km. 6.400 to km. 6.800 = 400 m Total 900 m in Khetlal upazilla of Joypurhat District Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/W-05/23-24/e-GP/20241120/902186/00220848
|
Joypurhat WD Division |
BDT 19.80 lakh |
19 Nov 2023 |
Completed |
|
Tree Plantation works at right bank of flood control embankment of Tulshiganga River from km. 3.000 to km. 3.900 = 900 m in Sadar & Khetlal upazilla of Joypurhat District Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/W-04/23-24/e-GP/20241120/902185/00220834
|
Joypurhat WD Division |
BDT 17.82 lakh |
15 Nov 2023 |
Completed |
|
Tree Plantation works in C/W different Completed projects Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/W-02/23-24/e-GP/20241124/902181/00222180
|
Joypurhat WD Division |
BDT 17.82 lakh |
15 Nov 2023 |
Completed |
|
Tree Plantation works at Little Jamuna left bank flood control embankment from km. 6.200 to km. 6.800 = 600 m in Sadar upazilla of Joypurhat District Under Joypurhat WD Division, BWDB, Joypurhat during the FY 2023-24.
JOY/OB/OTM/W-03/23-24/e-GP/20241120/902184/00220807
|
Joypurhat WD Division |
BDT 8.91 lakh |
15 Nov 2023 |
Completed |
|
Afforestation on the different Embankment in Rehabilitation of 3 Nos Project in Upazila-Dhamurhat, Patnitala & Mohadevpur, District-Naogaon and Bank Protection Project including Dredging of Atrai River under Naogaon O&M Division, BWDB, Naogaon during the Year 2023-2024.
Nao-W-16/e-GP/20241022/862546/00202036
|
Naogaon O&M Division |
BDT 9.00 lakh |
16 Aug 2023 |
Completed |
|
River bank rehabilitation work from km 6.500 to km 7.500= total 1.000 km in c/w Rajshahi Town Protection Project under Rajshahi O & M Division, BWDB, Rajshahi in FY 2022-23.
NDR/RTPP/OTM/04/e-GP/20241203/838309/00227151
|
Rajshahi O&M Division |
BDT 22.80 lakh |
25 May 2023 |
Completed |
|
Coloring, Greasing and Ancillary work of Borodhor 12-vent & Katadhar 2 vent regulator and Obstacle in c/w Naogaon Polder-1 Sub Project in upazila-Raninagar,District-Naogaon under Naogaon O&M Division, BWDB, Naogaon during the FY-2022-2023.
OTM-04/2022-23/e-GP/20230818/819946/0078041
|
Naogaon O&M Division |
BDT 3.74 lakh |
18 Apr 2023 |
Completed |
|
Construction of Inlet/Outlet at Hapania Bazar in C/W Jobaibeel FCDI project in Upazila: Sapahar, District: Naogaon under Naogaon O&M Division, BWDB, Naogaon during the FY 2022-2023.
OTM-06/2022-23/e-GP/20241019/819948/00198497
|
Naogaon O&M Division |
BDT 3.85 lakh |
18 Apr 2023 |
Completed |
|
Civil Repair, Painting & Greasing of 1 Vent Shimultole, 1 Vent Nolpokra, 2 Vent Udoyshree Regulator in c/w Right Embankment of Atrai River Sub-Project in Upazila:-Dhamoirhat under Naogaon O&M Division, BWDB, Naogaon during the FY-2022-2023.
OTM-09/2022-23/e-GP/20241019/819951/00198455
|
Naogaon O&M Division |
BDT 3.60 lakh |
18 Apr 2023 |
Completed |
|
Painting works of Boundary Wall of Rangpur Teesta Project Colony under Rangpur O&M Division, BWDB, Rangpur during the year 2022-2023.
OMB-OTM-10/e-GP/20230811/814485/0077621
|
Rangpur O&M Division |
BDT 4.50 lakh |
6 Apr 2023 |
Completed |
|
Repair & Maintenance works for SDE-1 General & office Bathroom, Teesta Building's Ladies' Prayer Room & Bathroom Room under Rangpur O&M Division, BWDB, Rangpur, during the years 2022-2023.
OMB-OTM-08/e-GP/20230811/814482/0077620
|
Rangpur O&M Division |
BDT 4.49 lakh |
6 Apr 2023 |
Completed |
|
Repair & Maintenance of Lab & Mosque of the Rangpur O&M Division, BWDB, Rangpur during the years 2022-2023.
OMB-OTM-09/e-GP/20230811/814483/0077619
|
Rangpur O&M Division |
BDT 4.50 lakh |
6 Apr 2023 |
Completed |
|
Eviction works of Illegal Structure Nearby Structures, Irrigation and Drainage Canal of Various Project from Non-Development Revenue Budget Under Magura O&M Division, BWDB, Magura during the FY 2022-23.
Magura/NDR-35/2022-23/e-GP/20230811/790553/0077618
|
Magura O&M Division |
BDT 2.70 lakh |
23 Feb 2023 |
Completed |
|
Survey and Exploration Works of Different Irrigation and Drainage Canal of Various Project of BWDB, Magura from Non-Development Revenue Budget Under Magura O&M Division, BWDB, Magura during the FY 2022-23.
Magura/NDR-34/2022-23/e-GP/20230810/790552/0077617
|
Magura O&M Division |
BDT 4.50 lakh |
23 Feb 2023 |
Completed |
|
Re-sectioning or Repair of Dhalai River Right Embankment from km 8.000 to km 8.290 in between 200 m at Bongaon in Kamalganj Upazilla District Moulvibazar under NDR Budget of Moulvibazar O&M Division, BWDB, Moulvibazar during the year 2022-23
MOULV/NDR/2022-23/W-08/e-GP/20231220/789308/00156327
|
Moulvibazar O&M Division |
BDT 10.25 lakh |
15 Feb 2023 |
Completed |
|
Re-sectioning or Repair of Embankment from km 3.000 to km 7.000 in between 300 m in Vurvurichora at Srimongol Upazilla District Moulvibazar under NDR Budget of Moulvibazar O&M Division, BWDB, Moulvibazar during the year 2022-23
MOULV/NDR/2022-23/W-11/e-GP/20231220/789311/00156332
|
Moulvibazar O&M Division |
BDT 4.01 lakh |
15 Feb 2023 |
Completed |
|
Temporary protection work by Geo-bag on the left bank of Gopaldi river from km 33.400 to km 33.630 = 0.230 km in polder no 55/2D of Patuakhali O&M Division, BWDB, Patuakhali during FY 2022-23.
NDR/PTK/2022-23/W-02/e-GP/20231222/784341/00156555
|
Patuakhali O&M Division |
BDT 57.91 lakh |
9 Feb 2023 |
Completed |
|
Annual repair work of different type of lift gates, flap gates & hoisting devices in c/w projects & sub-projects except Manu River Irrigation Project under Moulvibazar Mechanical O & M Division, BWDB, Moulvibazar during the year 2022-23.
OTM-06/MMOMD/2022-23/e-GP/20230811/785148/0077622
|
Moulvibazar Mech. O&M Division |
BDT 4.50 lakh |
6 Feb 2023 |
Completed |
|
Tree Plantation work both bank of Pagla River in Upazila Nawabganj Sadar & Shibganj, Dist. Chapainawabganj in C/W "Re-Excavation of small River, Channel and water bodlies in 64 districts (1st Phase) (2nd Revised)" Project Uuder Nawabganj O&M Division, BWDB, Chapainawabganj during the FY 2022-2023.
OM/Tree-01/2022-2023/e-GP/20230814/774061/0077805
|
Nawabganj O&M Division |
BDT 22.49 lakh |
11 Jan 2023 |
Completed |
|
Repair/Re-sectioning of flood control embankment in between km 133.307 to km 134.000 = 535.00 meter in c/w Challan Beel Project polder-C under Rajshahi O&M Division, BWDB, Rajshahi during the Fiscal Year 2022-2023.
NDR/Polder-C/01/e-GP/20241203/777671/00227169
|
Rajshahi O&M Division |
BDT 34.19 lakh |
10 Jan 2023 |
Ongoing |
|
Dismantling, Repair, & Installation with paint work of 8 (Eight) vent Regulator on Nabaganga River for Magura O&M Division, under Bheramara Mechanical Division, BWDB, Bheramara, Kushtia during the FY 2022-2023.
GK/2022-23/Magura/OTM-03/e-GP/20230818/777941/0078036
|
Bheramara ME Division |
BDT 8.13 lakh |
10 Jan 2023 |
Completed |
|
Repair, Manufacturing & Installation of Satoir 4-Vent Regulator with paint work for Faridpur O&M Division, under Bheramara Mechanical Division, BWDB, Bheramara, Kushtia during the FY 2022-2023.
GK/2022-23/Faridpur/OTM-01/e-GP/20230818/777793/0078035
|
Bheramara ME Division |
BDT 9.76 lakh |
10 Jan 2023 |
Completed |
|
Repair of Little Jamuna River Left Embankment from km. 6.200 to km. 6.800 = 600.00 m in C/W Protection of Chechra Village Erosion from Little Jamuna River Border River and Tulshiganga Sub-Project in Upazilla Joypurhat Sadar, District Joypurhat under Joypurhat WD Division, BWDB, Joypurhat during the FY: 2022-23.
JOY/NDR/OTM/W-10/2022-23/e-GP/20241125/769446/00222990
|
Joypurhat WD Division |
BDT 13.48 lakh |
22 Dec 2022 |
Ongoing |
|
Completion of incomplete works of " River Bank Protective Work along the left bank of Dhaleswari river in c/w Babupur-Lauhati FCD Project for a length of 400m (from km 11.320 to km 11.720) in UZ: Delduar of Tangail district during the year 2017-18" under NDR budget during the year 2021-22.
NDR/Gaskumulli/21-22/e-GP/20220920/682745/0042920
|
Tangail O&M Division |
BDT 13.51 lakh |
4 Apr 2022 |
Completed |
|
Repair, Manufacturing & Installation of 02 (two) no's vertical lift gate (Size:1.50m x 1.80m), 04 (four) no's Pedestal Type hoisting device with paint work for Modonkhali and jakersurra Regulator for Faridpur O&M Division, under Bheramara Mechanical Division, BWDB, Bheramara, Kushtia during the FY 2021-2022.
GK/2021-22/Faridpur/OTM-01/e-GP/20221210/672691/0056332
|
Bheramara ME Division |
BDT 11.47 lakh |
13 Mar 2022 |
Completed |
|
Temporary bank protective work at the right bank of Rahmatkhali khal Adjacent to Kalir char from km. 4.500 to km. 4.600 =0.100 K.M at tomchar union in sadar upazilla, district Lakshmipur in c/w Operation & Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2021-22 (LAK/OM/OTM/W-03/2021-2022).
LAK/OM/OTM/W-03/2021-2022/e-GP/20220921/657181/0043965
|
Laksmipur O&M Division |
BDT 6.29 lakh |
7 Feb 2022 |
Completed |
|
Tree Plantation Works at Various Dyke of Different Irrigation and Drainage Canal Under Non-Development Revenue Budget Under Magura O&M Division, BWDB, Magura during the FY 2021-22.
Magura/NDR-22/2021-22/e-GP/20220817/655168/0030427
|
Magura O&M Division |
BDT 3.60 lakh |
6 Feb 2022 |
Completed |
|
Annual repair and partial rehabilitation work of different type of gates & hoisting devices with accessories c/w projects & sub-projects except Manu River Irrigation Project under Moulvibazar Mechanical O & M Division, BWDB, Moulvibazar during the year 2021-22.
OTM-02/MMOMD/2021-22/e-GP/20220903/647439/0033390
|
Moulvibazar Mech. O&M Division |
BDT 7.60 lakh |
1 Feb 2022 |
Completed |
|
Strengthing and Repairing of Hasnapara Spur-1 by Geo bag at BRE Km. 110.700
Rev/OTM-05/2021-22/e-GP/20220903/648321/0033387
|
Bogura O&M Division |
BDT 8.99 lakh |
25 Jan 2022 |
Completed |
|
Construction of Main Gate for Derai O&M Sub-Division Office in Upazila-Derai, District-Sunamganj in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2021-2022.
Sunam-2/NDR/2021-22/OTM-03/e-GP/20231122/646628/00135328
|
Sunamganj O&M Division-2 |
BDT 6.30 lakh |
10 Jan 2022 |
Completed |
|
Construction of Boundary wall of Derai O&M Sub-Division Office in Upazila-Derai, District-Sunamganj in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2021-2022.
Sunam-2/NDR/2021-22/OTM-02/e-GP/20231122/646627/00135326
|
Sunamganj O&M Division-2 |
BDT 9.44 lakh |
10 Jan 2022 |
Completed |
|
Construction of Sign Board for road crossing River/Khal in c/w NDR budget under Sunamganj O&M Division-2, BWDB, Sunamganj during the FY 2021-2022.
Sunam-2/NDR/2021-22/OTM-01/e-GP/20231122/646626/00135330
|
Sunamganj O&M Division-2 |
BDT 6.66 lakh |
10 Jan 2022 |
Completed |
|
Breach closing of Baghabari to Nimaichora Flood Control Embankment from Km. 7.975 to Km. 8.000 Total 25.00m (near Ratanpur) and from Km. 24.484 to Km. 24.565 Total 80.00m (near Char Bhangura) Grand total 105.00m under Pabna O&M Division ,BWDB, Pabna during the FY: 2021-22
PAB/W-07/2021-22/e-GP/20220903/641523/0033370
|
Pabna O&M Division |
BDT 11.77 lakh |
23 Dec 2021 |
Completed |
|
Repair & Maintenance of BWDB's Office, Colony & Rest House with Mosque under Pabna O&M Division, BWDB, Pabna during the FY: 2021-22.
PAB/W-06/2021-22/e-GP/20220903/629898/0033368
|
Pabna O&M Division |
BDT 11.23 lakh |
22 Nov 2021 |
Completed |
|
Construction of C.C Drain at I3S19T9 irrigation canal From Km. 0.00 to Km. 0.205 Total=205.00 m in C/W PIRDP under Pabna O&M Division, BWDB, Pabna during the FY: 2021-22.
PAB/W-04/2021-22/e-GP/20220903/629887/0033372
|
Pabna O&M Division |
BDT 10.69 lakh |
22 Nov 2021 |
Completed |
|
Emergency repair and maintenance works to protect the slope of Embankment to control the seepage inbetween BRE km-133.280 to BRE km-133.680=400.0 m at Doripara in Upazila Sariakandi of Bogra District during the Flood of the year 2021
OTM-EMG-07-2020-2021/e-GP/20220903/587876/0033383
|
Bogura O&M Division |
BDT 18.00 lakh |
17 Jun 2021 |
Completed |
|
Repair maintenance and supply work for Non-residential building of Teesta Project Colony, Rangpur under Rangpur O & M Division, BWDB , Rangpur during the year 2020-2021.
Colony/OTM/Works-01/2020-21/e-GP/20220603/588066/003991
|
Rangpur O&M Division |
BDT 13.49 lakh |
14 Jun 2021 |
Completed |
|
Supply filling and dumping of 250 kg geo Bag for Emergency work, where and when necessary under Nawabganj O & M division BWDB, Chapainawabganj during FY-2020-2021 and 2021-2022.
NDR/Geo Bag/2020-2021/e-GP/20220621/579789/0011028
|
Nawabganj O&M Division |
BDT 40.67 lakh |
20 May 2021 |
Completed |
|
Repair & re-installation of 5 (Five) Nos. MS Lift Gate at Kanshat 5-Vent regulator of Nawabganj O&M Division under Bogura Mechanical Division, BWDB, Bogura During the FY 2020-21.
BMD/Gate/Nawabganj/LTM-30/2020-21/e-GP/20220621/579551/0011024
|
Bogura ME Division |
BDT 5.70 lakh |
17 May 2021 |
Completed |
|
Strengthening of Embankment on emergency basis Work along Left Embankment of Manu River at Khaspremnagar at 7 no. Kamarchak Up in Rajnagar Upazila Chainage from Km 43.290 to 43.400 = 110 m in c/w Tarapasha-Premnagar FC Sub-Project under Moulvibazar O&M Division during the FY 2020-21.
LTM-27/2020-2021/e-GP/20220817/573684/0030433
|
Moulvibazar O&M Division |
BDT 16.37 lakh |
2 May 2021 |
Completed |
|
Afforestration at different location in Lakshmipur District in c/w Operation and Maintenance Budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-2021.
LAK/OM/OTM-10/2020-21/e-GP/20220622/572968/0011069
|
Laksmipur O&M Division |
BDT 16.20 lakh |
27 Apr 2021 |
Completed |
|
Operates of Rahmatkhali 2 Nos 14-Vent regulator, Monpura 1-Vent Regulator, Navigation gate and Jarirdhona 4-Vent Regulator in c/w Operation and Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-21.
LAK/OM/OTM-07/2020-21/e-GP/20220622/572964/0011059
|
Laksmipur O&M Division |
BDT 2.70 lakh |
27 Apr 2021 |
Completed |
|
Changing Gear oil, Grease and wire rope of 14 Vent Rahmatkhali New Regulator in c/w Operation & Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-21.
LAK/OM/OTM-05/2020-21/e-GP/20220622/572962/0011040
|
Laksmipur O&M Division |
BDT 2.69 lakh |
27 Apr 2021 |
Completed |
|
Repair & maintenance of Rahmatkhali 14 nos. Radial gates internal metal parts of hoisting and supplying, fitting, fixing electric goods for repair of electric line device in c/w Operation & Maintenance budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-21.
LAK/OM/OTM-06/2020-21/e-GP/20220622/572963/0011071
|
Laksmipur O&M Division |
BDT 2.70 lakh |
27 Apr 2021 |
Completed |
|
Conducting Topographic, Bathymetric and Drone survey for preparation of DPP of -Protection work at the left bank of Meghna river at Borokheri, Ludhua bazar and kader ponditer hat areas in Ramgati and Kamalnagar Upazila under Lakshmipur District" in c/w Operation and Maintenance Budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-2021.
LAK/OM/OTM-11/2020-21/e-GP/20220622/572969/0011046
|
Laksmipur O&M Division |
BDT 10.35 lakh |
27 Apr 2021 |
Completed |
|
Removal of Water hyacinth from Rahmatkhali Khal from Km. 13.00 to 14.00 = 1.000 Km., Km. 18.00 to 19.500 = 1.50 Km., Wapda Khal km. 6.000 to km 7.000 = 1.000 Km. in c/w Operation and Maintenance Budget under Lakshmipur O&M Division, BWDB, Lakshmipur during the year 2020-2021.
LAK/OM/OTM-04/2020-21/e-GP/20220622/572961/0011041
|
Laksmipur O&M Division |
BDT 3.59 lakh |
27 Apr 2021 |
Completed |