|
Precautionary protective work on the Right bank of the Mohananda River from Km. 56.640 To Km. 56.700 = 60.00 m. at Ranibari Chandpur Upazilla Shibganj in connection with ''Morichar dara'' Sub- project under Nawabganj O&M Division BWDB, Chapainawabganj, during the FY 2023-2024.
NDR/Nawab/W-08/2023-24/e-GP/20241211/924568/00233402
|
Nawabganj O&M Division |
BDT 72.80 lakh |
17 Dec 2023 |
Completed |
|
Repair & Maintenance of Embankment inbetween km 6.800 to km 10.000 = 2.950 Km in c/w Chalan Beel Project Polder-C in Upazila: Manda, District: Naogaon under Naogaon O&M Division BWDB Naogaon during the FY-2023-2024.
OTM-07/2023-2024/e-GP/20241017/919285/00198007
|
Naogaon O&M Division |
BDT 1.01 crore |
10 Dec 2023 |
Completed |
|
Precautionary Bank Protective work from km. 75.529 to km. 75.669 = 140.00 m along the Right Bank of Mohananda River at Kasiabari in Gomostapur Upazila of Chapainawabganj District in C/W "Jhanjhani-Holdigachi Sub-Project" under Nawabganj O&M Division, BWDB, Chapainawabganj during the year 2023-2024.
NDR/Nawab/W-02/2023-24/e-GP/20241211/901326/00233391
|
Nawabganj O&M Division |
BDT 2.57 crore |
12 Nov 2023 |
Ongoing |
|
Precautionary Bank Protection Work on the Right bank of the Mohanonda River from Km 21.000 to Km 21.130 = 130.00 m at Ansarer Ghat Upazila : Chapainawabgonj Sadar, Dist : Chapainawabganj in Connection With "Morichardara Sub-Project'' under Nawabganj O&M Division, BWDB, Chapai Nawabganj during the FY 2023-2024.
NDR/Nawab/W-01/2023-24/e-GP/20241211/901325/00233369
|
Nawabganj O&M Division |
BDT 71.22 lakh |
12 Nov 2023 |
Completed |
|
Precautionary bank protective work on the Left bank of the Mohanonda River from Km 70.168 to Km 70.500 = 332.00m, Connection With "Protection of left Bank erosion of the Mohananda River at Brozonathpur Upazila : Gomostapur, Dist : Chapainawabganj'' under Nawabganj O&M Division, BWDB, Chapai Nawabganj during the FY 2022-2023&2023-2024.
OM/W-06/2022-23/2023-24/e-GP/20241209/846534/00231673
|
Nawabganj O&M Division |
BDT 2.29 crore |
15 Jun 2023 |
Completed |
|
Greasing, coloring of Bagdhani 2-vent regulator, weed cleaning & other works in Upazila- Paba, Dist- Rajshahi in C/W Karnahar Borobila Project under Rajshahi O&M Division, BWDB, Rajshahi during FY 2022-23
NDR/Karnahar-A/OTM/03/e-GP/20241209/786933/00231582
|
Rajshahi O&M Division |
BDT 8.99 lakh |
2 Mar 2023 |
Completed |
|
Bank Protective Work for protection of Muraripur Government Primary School and adjacent Village along the Left bank of Tulshiganga River from Km. (-) 10.600 to Km. (-) 10.526 = 74.00 m at Muraripur, Upazilla Joypurhat Sadar, District Joypurhat in C/W Upper Tulshiganga Left & Right Embankment Flood Control and Drainage project Under Joypurhat WD Division, BWDB, Joypurhat during the FY: 2022-23.
JOY/NDR/OTM/W-06/2022-23./e-GP/20241125/781837/00222973
|
Joypurhat WD Division |
BDT 89.45 lakh |
23 Jan 2023 |
Completed |
|
Constructions of 5 (Five) nos. 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at Different Govt. Primary School in Terokhada Upazila of Khulna District. under PEDP-4. FY: 2021-2021.
000/e-GP/DPHE/2023-07-11/00650818
|
Office of the Executive Engineer DPHE, Khulna |
BDT 81.77 lakh |
23 Jan 2022 |
Completed |
|
Constructions of 9 (Nine) nos. 2 storied RCC WASH Block having 4 storied foundation for MT & boys and FT & girls including all associated construction, sanitary, plumbing & electrical works at Dumuria Upazila (Norniya Govt. Primary School-275m; J. K. S Govt. Primary School-61m; Shekhertak Govt. Primary School-61m; Magurkhali Govt. Primary School-61m; North Magurghona Govt. Primary School-412m; West Shovona Govt. Primary School-244m; Sahos Joykhali Govt. Primary School-228m; Vandarpara Govt. Primary School-228m & Chechuri K.B Govt. Primary School-290m) of Khulna District. under PEDP-4 .
000/e-GP/DPHE/2023-07-11/00649131
|
Office of the Executive Engineer DPHE, Khulna |
BDT 1.44 crore |
18 Jan 2022 |
Completed |
|
Repair of BWDB Sopura Office Building Extension & Colony (Repair & Maintenance of Office Building & Gate, Colony Gate, Mosque & Boundary Wall at BWDB Office Building & Sopura Colony in connection with "Protection of Establisments from the Erosion of the Padma River on the Left Bank at Charghat & Bagha Upazillas of Rajshahi District '' Under Rajshahi O&M Division, BWDB, Rajshahi during the FY 2021-2022.)
BR-01/Lot-BR-01/B/e-GP/20241202/624389/00226365
|
Rajshahi O&M Division |
BDT 1.33 crore |
8 Nov 2021 |
Completed |
|
Re-excavation of Tulshiganga River from Km. 15.000 to Km. 21.160 = 6.160 Km. in C/W Re-Excavation of Tulshiganga, Little Jamuna, Chiri & Harabati River of Joypurhat District (1st Revised) Project during the FY: 2021-2022.
JOY-W-13/2021-22/e-GP/20241127/624502/00224223
|
Joypurhat WD Division |
BDT 5.68 crore |
1 Nov 2021 |
Completed |
|
Re-sectioning of embankment form km. 0.00 to km. 5.000 = 5000.00 m. along the Right bank of Atrai river under Construction of Right Embankment of Atrai River Project in Union Khelna, in Upazila Dhamoirhat, District Naogaon in c/w Rehabilitation of 3 nos Project in Upazila: Dhamoirhat, Patnitala & Mohadevpur District: Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O & M Division BWDB, Naogaon During the FY-2020-21.
Nao-W-8/e-GP/20241022/588312/00201751
|
Naogaon O&M Division |
BDT 3.64 crore |
15 Jun 2021 |
Completed |
|
Re-Sectioning of Embankment Form Km. 25.00 to Km 32.00 = 7000.00 m along The Right Bank of Atrai River at Mohisbathan in c/w Rehabilitation of 3 nos Project in Upazila: Dhamoirhat, Patnitala & Mohadevpur District: Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O&M Division, BWDB, Naogaon.
Nao-W-10/e-GP/20241022/588315/00201723
|
Naogaon O&M Division |
BDT 5.83 crore |
15 Jun 2021 |
Completed |
|
Protective work on the right bank of the River Mohananda at Gupenathpur from Meterage 1565.00 to Meterage 1715.00 = 150m in Upazila Bholahat District Chapai nawabganj in connection with "Border River Protection and Development Project (Phase-2)" under Nawabganj O&M Division, BWDB, Chapainawabganj during the year 2020-2021
BR-NAW-01/e-GP/20241219/581002/00237336
|
Nawabganj O&M Division |
BDT 91.61 lakh |
24 May 2021 |
Completed |
|
Other Structure & Infrastructure (construction of Park with beautification for recreational facility) at Rupganj, Narayanganj adjacent to NNIP (Block A/1) South main Irrigation Canal in c/w Re-excavation of Small River, Khal and Water Bodies in 64 District (1st Phase) (1st Revised) Project under Dhaka O&M Division-1, BWDB, Dhaka during the year 2020-2021, 2021-22.
FFW/W-05/1/Narayanganj/e-GP/20231127/580523/00140540
|
Dhaka O&M Division-1 |
BDT 89.53 lakh |
20 May 2021 |
Ongoing |
|
Bank Revetment work along the Left bank of the Atrai River from km. 6.700 km. 7.200 500.00 m at Purbo Nondonpur in Union Alampur Upazila- Dhamoirhat District-Naogaon Under Chilimpur-Saligram Sub-Project in c/w Rehabilitation of 3 nos Project in Upazila Dhamoirhat Patnitala & Mohadevpur District Naogaon and Bank Protection Project Including Dredging of Atrai River under Naogaon O&M Division BWDB Naogaon During the FY-2020-21.
Nao-W-1/e-GP/20241020/556145/00198988
|
Naogaon O&M Division |
BDT 10.65 crore |
9 Mar 2021 |
Completed |
|
Re-excavation of Hatikhoja khal from km 0.000 to km 10.000 equal to10000 m. in Upazila- Porsha District-Naogaon under Naogaon O&M Division BWDB Naogaon during the FY 2020-21.
Naogaon-W-09/2020-21/e-GP/20241017/549732/00197640
|
Naogaon O&M Division |
BDT 4.24 crore |
23 Feb 2021 |
Completed |
|
Installation of 60 Nos. 100x50 mm dia deep tube well with submersible pump capacity 1.5 HP with RO Filter at different primary school of Satkhira district under PEDP-4
000/e-GP/DPHE/2023-07-11/00453193
|
Office of the Executive Engineer,DPHE,Satkhira |
BDT 1.29 crore |
16 Apr 2020 |
Completed |
|
Construction of 07 nos community based reverse osmosis plant for Different upazila of bagerhat district unde Arsenic Risk Reduction Project for Water Supply .
000/e-GP/DPHE/2023-07-11/00351381
|
Office of the Executive Engineer,DPHE Bagerhat |
BDT 2.02 crore |
1 Sep 2019 |
Completed |
|
Construction of 07 Nos. Community Based Reverse Osmosis RO Plant in Satkhira District under Arsenic Risk Reduction Project on Water Supply Department of Public Health Engineering DPHE FY-2019-20
000/e-GP/DPHE/2023-07-11/00348363
|
Office of the Executive Engineer,DPHE,Satkhira |
BDT 1.89 crore |
8 Aug 2019 |
Completed |
|
Re-excavation of Baniajuri Khal from km.0.000 to km.5.000 5.000 km. in upazila- Ghior District- Manikganj under Manikganj WD Division BWDB Manikganj during the year 2018-19.
Manikganj/W-01/2018-19/e-GP/20231122/256828/00135162
|
Manikganj WD Division |
BDT 1.48 crore |
28 Nov 2018 |
Completed |
|
CONSTRUCTION OF COMMUNITY BASED REVERSE OSMOSIS SYSTEM UNDER VWSP PROJECT
000/e-GP/DPHE/2023-07-11/00243247
|
Office of the Executive Engineer DPHE, Khulna |
BDT 31.11 lakh |
20 Nov 2018 |
Completed |
|
Construction of 10 Nos. RCC WASH Block MTBoys and FTGirls in Satkhira District including 2 Nos. Inspection Pit 1 Nos. Soak Well & 1Nos. Septic tank with all Sanitary & Electrical works etc. FY-2017-18
000/e-GP/DPHE/2023-07-11/00194473
|
Office of the Executive Engineer,DPHE,Satkhira |
BDT 1.46 crore |
8 May 2018 |
Completed |
|
CONSTRUCTION OF 10 NOS RCC WASH BLOCK MT BOYS AND FT GIRLS INCLUDING 20 NOS INSPECTION PIT 10 NOS SOAK WELL AND 10 NOS SEPTIC TANK WITH ALL SANITARY AND ELECTRICAL WORKS ETC AT KHULNA DISTRICT
000/e-GP/DPHE/2023-07-11/00179183
|
Office of the Executive Engineer DPHE, Khulna |
BDT 1.41 crore |
25 Mar 2018 |
Completed |
|
247304023 - Improvement of Aladipur R&H - Baduria Bazar Road Ch 1375m - 2685m & 3673m -3923m Dumuria Salvage Cost of this package is Tk 569460.00 fixed which will be paid by contractor
KDRIDP/Khul/W- 62/2017-18/e-GP/20241111/164575/00216595
|
Office of the Executive Engineer, LGED, Khulna |
BDT 2.16 crore |
7 Mar 2018 |
Completed |
|
Re-excavation of 05 Nos. Pond at Assasuni Upazila in Upazila Satkhira District under Water Preservation and Safe Water Supply Project through Re-Excavation / Maintenance of Ponds / Dighi / Ditches owned by Zila Parishads Department of Public Health Engineering DPHE
000/e-GP/DPHE/2023-07-11/00168496
|
Office of the Executive Engineer,DPHE,Satkhira |
BDT 1.63 crore |
19 Feb 2018 |
Completed |
|
Construction of Khornia Growth Center Dumuria
KDRIDP/Khul/GC- 02/2017-18/e-GP/20241105/154317/00213162
|
Office of the Executive Engineer, LGED, Khulna |
BDT 18.72 lakh |
15 Jan 2018 |
Completed |
|
Repair/Rehabilitation of Protective Work Along the Main Guide-Bund of Hazi Shariatullah Bridge from km 0.000 to km 0.150 total 150.00m at Right Bank of Arial Khan River in Connection with Protection of Dhaka- Mawa- Bhanga- Khulna National Highway Adjacent to Hazi Shariatullah Bridge from the erosion of Arial Khan River Project Under Madaripur O&M Division BWDB Madaripur During the Year 2017-18 & 2018-19.
HSB/W-03/Lot.-01/2017-18/e-GP/20231116/151738/00129083
|
Madaripur O&M Division |
BDT 6.88 crore |
7 Jan 2018 |
Completed |
|
Repair/Rehabilitation of Protective Work Along the Main Guide-Bund of Hazi Shariatullah Bridge from km 0.150 to km 0.300 total 150.00m at Right Bank of Arial Khan River in Connection with Protection of Dhaka- Mawa- Bhanga- Khulna National Highway Adjacent to Hazi Shariatullah Bridge from the erosion of Arial Khan River Project Under Madaripur O&M Division BWDB Madaripur During the Year 2017-18 & 2018-19.
HSB/W-06/Lot.-01/2017-18/e-GP/20231116/151739/00129244
|
Madaripur O&M Division |
BDT 7.55 crore |
7 Jan 2018 |
Completed |
|
Rehabilitation of 1 Nos 3.00m X 3.00m RCC Box Culvert on Chahelgazi UP Shibrampur to Madhobpurhat Road at Ch. 6290m Road ID No 127643020 Dinajpur-S
e-Tender/LGED/Dina/17-18/W-125/e-GP/20241203/137394/00227295
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 10.01 lakh |
21 Nov 2017 |
Completed |
|
Rehabilitation of 1 No. 3.00x3.00m RCC Box Culvert on Fazilpur UPC Ranigonjhat to Mddhabour via Balapara Road at Ch.2485m Road ID No 127643019 Dinajpur-S
e-Tender/LGED/Dina/17-18/W-123/e-GP/20241215/137392/00235719
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 10.06 lakh |
21 Nov 2017 |
Completed |
|
Rehabilitation of 1 Nos 3.00m X 3.00m RCC Box Culvert on Basherhat RHD to Karnai via Nashipurhat Road at Ch. 980m Road ID No 127644097 Dinajpur-S
e-Tender/LGED/Dina/17-18/W-127/e-GP/20241217/137396/00236279
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 9.82 lakh |
21 Nov 2017 |
Completed |
|
Rehabilitation of 2X3.00mX3.00m RCC Box Culvert on Mangalpur GC to Kaharole Upazila H/Q. via Bagdairhat Road at Ch. 6462m Road ID No 127172008 Birol
e-Tender/LGED/Dina/17-18/W-139/e-GP/20241128/137409/00224755
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 14.19 lakh |
21 Nov 2017 |
Completed |
|
Rehabilitation of 1 Vent 3.00m X 3.00m RCC Box Culvert on Kaharol Upazila H/QKhosalpur to Bhognagar UP Office via Modanpur Bridge Kaharol part Road at Ch. 257m Road ID No 127563029 Kaharol
e-Tender/LGED/Dina/17-18/W-114/e-GP/20241203/137383/00226762
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 10.61 lakh |
20 Nov 2017 |
Completed |
|
Rehabilitation of 2 Vent 3.00m X 1.50m RCC Box Culvert on Narai Pry. School to Sukdebpur to Maherpur Road near Maherpur Collage Road at Ch. 465m Road ID No 127214011 Bochaganj
e-Tender/LGED/Dina/17-18/W-117/e-GP/20241126/137386/00223641
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 10.57 lakh |
20 Nov 2017 |
Completed |
|
Rehabilitation of 1 Nos 3.00m X 2.00m RCC Box Culvert on Purba Sadipur ten mail RHD to Mutunihat GC Road at Ch. 1250m Road ID No 127562008 Kaharol
e-Tender/LGED/Dina/17-18/W-112/e-GP/20241204/137380/00227452
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 10.60 lakh |
20 Nov 2017 |
Completed |
|
Rehabilitation of 2 Vent 3.00m X 3.00m Box Culvert on Birampur Bamnahar more R&H to Daudpur GC via Beparitola hat Road Birampur portion Road at Ch. 3132m Road ID No 127102003 Birampur
e-Tender/LGED/Dina/17-18/W-109/e-GP/20241217/137377/00236280
|
Office of the Executive Engineer, LGED, Dinajpur |
BDT 19.83 lakh |
20 Nov 2017 |
Completed |
|
247755118 - Improvement of Alaipur - Anandanagar FRB Putimari - Peara Village Jami Mosque - Chandunsree H/O Khalid Howlader Road by HBB Ch 00 - 2500m Rupsa Salvage Cost of this package is Tk 623967.00 fixed which will be paid by contractor
KDRIDP/Khul/W -34/2017-18/e-GP/20241111/123730/00216616
|
Office of the Executive Engineer, LGED, Khulna |
BDT 89.01 lakh |
8 Oct 2017 |
Completed |
|
Construction of functional building for Water Treatment Plant at Satkhira Pourashava under 37 dist. Town Water Supply Project FY-2016-17
000/e-GP/DPHE/2023-07-11/00112884
|
Office of the Executive Engineer,DPHE,Satkhira |
BDT 78.01 lakh |
28 Aug 2017 |
Completed |
|
Re-excavation of 04 Nos. Pond at different Upazila in Satkhira District under Water Preservation and Safe Water Supply Project through Re-Excavation / Maintenance of Ponds / Dighi / Ditches owned by Zila Parishads Department of Public Health Engineering DPHE
000/e-GP/DPHE/2023-07-11/00108689
|
Office of the Executive Engineer,DPHE,Satkhira |
BDT 1.25 crore |
15 Jun 2017 |
Completed |
|
Protective Work Along the Right Bank of Arial Khan River From km 0.000 to km 0.210 total 210.00 m in C/W Protection of Dhaka- Mawa- Bhanga- Khulna National Highway Adjacent to Hazi Shariatullah Bridge from the erosion of Arial Khan River Project Under Madaripur O&M Division BWDB Madaripur During the FY 2016-2017.
HSB/W-01/Lot.-01/2016-17/e-GP/20231116/85327/00128938
|
Madaripur O&M Division |
BDT 5.81 crore |
8 Feb 2017 |
Completed |
|
Protective work along the Left bank of the Arial Khan River from km. 0.210 to km 0.390 total 180.00 m in connection with protection of Dhaka-Mawa-Bhanga-Khulna national highway adjacent to Hazi Shariatullah Bridge from the erosion of Arial Khan River project under Madaripur O&M Division BWDB Madaripur during the FY 2016-2017.
HSB/W-04/Lot.-02/2016-17/e-GP/20231116/85332/00129027
|
Madaripur O&M Division |
BDT 5.71 crore |
8 Feb 2017 |
Completed |
|
Protective Work Along the Right Bank of the Arial Khan River from km. 0.560 to km 0.750 total 190.00 m in C/W Protection of Dhaka- Mawa- Bhanga- Khulna National Highway Adjacent to Hazi Shariatullah Bridge from the erosion of Arial Khan River Project Under Madaripur O&M Division BWDB Madaripur During the FY 2016-2017.
HSB/W-02/Lot.-02/2016-17/e-GP/20231116/85330/00128977
|
Madaripur O&M Division |
BDT 5.99 crore |
8 Feb 2017 |
Completed |
|
(a) Improvement of Senhati Star 1 No. Gate Bazar -Vottacharja Bazar Ferry Ghat Road Via Proshanta Datta House, PDB Big Power Station, Towain Mill, Post Office Road (Ch: 00-325m) [ID No. 24404078] (b) Construction of 1 nos 0.625m X 0.60m Culvert at Ch: 131m , 01Nos. 0.675mX0.75m at ch:290m & 05 Nos. 200mm dia. Pipe Culvert at ch: 05m, 109m, 153m, 235m & 280m on the same Road under Digholia Upazila.[Salvage Cost of this package is Tk 161952.00 (fixed) which will be paid by contractor]
IRIDP-2/KLN/DW-93../e-GP/20241101/72819/00210186
|
Office of the Executive Engineer, LGED, Khulna |
BDT 44.73 lakh |
7 Nov 2016 |
Completed |