|
247173002- Improvement of Banisanta UP Office-Banisanta Bazar road By BC at CH. 8066-10400m under Dacope Upazila, District: Khulna. Salvage amount: 1118418.00 tk.
KDRIDP/Khul/W-152/2021-22/e-GP/20241105/651242/00213167
|
Office of the Executive Engineer, LGED, Khulna |
৳২.৩৯ কোটি |
৩০ জানু ২০২২ |
Completed |
|
247173002- Improvement of Banisanta UP Office - Banisanta Bazar road by BC at CH. 5666-8066m under Dacope Upazila, District: Khulna. Salvage amount: 642313.00 tk.
KDRIDP/Khul/W-151/2021-22/e-GP/20241108/651241/00215450
|
Office of the Executive Engineer, LGED, Khulna |
৳২.২১ কোটি |
৩০ জানু ২০২২ |
Completed |
|
Construction of 3V- 4.0m X 4.0m Box Culvert on Gaula UP - Chanderhat - Faltita Bazar Road at Ch. 6010m. Road Id- 201563006.
KDRIDP/Bager/B-19/2021-22/e-GP/20241122/628510/00221863
|
Office of the Executive Engineer, LGED, Bagerhat |
৳৬৪.৩১ লাখ |
১ ডিসে ২০২১ |
Completed |
|
Improvement of Tafalbari GC - Rasulpur GC - Rajapur GC - Pollanbari RHD road by BC Ch. 8650-11450m Road ID No 201772007 Salvage cost Tk. 3,47,698.00 Under Sharankhola Upazila District- Bagerhat.
KDRIDP/Bager/W-138/2020-21/e-GP/20241122/591163/00221857
|
Office of the Executive Engineer, LGED, Bagerhat |
৳৩.৪৭ কোটি |
১২ আগ ২০২১ |
Completed |
|
Re-excavation of 03 (Three) ponds (Nesarabad 01 Nos and Najirpir 02 Nos) under "Water preservation and Safe Water Supply Project Through Re-excavation/Maintenance of Ponds/ Dighi/ Ditches owned by Zilla Parishads" in Pirojpur district during FY 2021-22.
000/e-GP/DPHE/2023-07-11/00597006
|
Office of the Executive Engineer DPHE, Perojpur |
৳৬৯.১৭ লাখ |
১১ আগ ২০২১ |
Completed |
|
Re-excavation of 09 Nine Nos. Pond of zila parishad at Mathbaria upazila & others in Pirojpur district under Water Preservation and Safe water Supply Project through Re-excavation/Maintenance of Ponds/Dighi/Ditches owned by Zilla Parishads during the FY 2020-2021
000/e-GP/DPHE/2023-07-11/00494182
|
Office of the Executive Engineer DPHE, Perojpur |
৳২.১৪ কোটি |
২০ সেপ ২০২০ |
Completed |
|
Rehabilitation of Amtoli Kakchira RHD Town hall mor-Barguna Bakergonj RHD Road from Ch. 170m-2000m Road ID504284086 Barguna-S
e-Tender/LGED/Barg/GOBM/20-21/W-10/e-GP/20241207/489920/00229399
|
Office of the Executive Engineer, LGED, Barguna |
৳১.২৬ কোটি |
৬ সেপ ২০২০ |
Completed |
|
Re-excavation of 05 Five nos Land Office Pond including Palasiding Fencing HBB Walk-Way Plantation and Rain Water Collection System in Patharghata Upazila of Barguna DIstrict under Water Preservation and Safe Water Supply Project through Re-Excavation / Maintenance of Ponds / Dighi / Ditches owned by Zila Parishads of DPHE Barguna District.
000/e-GP/DPHE/2023-07-11/00437758
|
Office of the Executive Engineer DPHE, Barguna |
৳১.৩৬ কোটি |
৮ মার্চ ২০২০ |
Completed |
|
Re-excavation of 07 Seven nos Pond including Palasiding Fencing HBB Walk-Way Plantation and Rain Water Collection System in Betagi Upazila of Barguna DIstrict under Water Preservation and Safe Water Supply Project through Re-Excavation / Maintenance of Ponds / Dighi / Ditches owned by Zila Parishads of DPHE Barguna District.
000/e-GP/DPHE/2023-07-11/00431123
|
Office of the Executive Engineer DPHE, Barguna |
৳১.৫৭ কোটি |
২৩ ফেব ২০২০ |
Completed |
|
247172004-Improvement of Kalinagor GC-Khutakhali Bajua GC Road Ch 2517m-5000m by BC under Dacope Upazila District Khulna.Salvage Cost of this package is Tk 825915.00 fixed which will be paid by contractor
KDRIDP/Khul/W-65/2018-19/e-GP/20241111/338151/00216649
|
Office of the Executive Engineer, LGED, Khulna |
৳২.৯৯ কোটি |
১৮ সেপ ২০১৯ |
Completed |
|
a Improvement of Monga Chaterhat GCCR at Tatibunia-Mithakhali Bazar Road By BC from Ch. 00m-1000m. Salvage Cost 1052889.00 Road ID No. 201584019.b Improvement of Dhalir Khando more - Goyalir met Road By BC from Ch. 00m-1275m. Salvage Cost 808872.00 Road ID No. 201584099 c Improvement of Khanjahan Ali Hat-Sahebermet Road By BC from Ch. 00m1000m. Salvage Cost 1058372.00 Road ID No. 201584111 under Mongla Upazila Bagerhat.
KBS-RIDP/BAGER/VR-55.2/18/e-GP/20241009/351290/00194030
|
Office of the Executive Engineer, LGED, Bagerhat |
৳২.৮৬ কোটি |
২ সেপ ২০১৯ |
Completed |
|
a Improvement of Mongla Chatterhat GC Road-Mongla Bus Stand Road via Fozilatun Necha Mohila Madrasha Road By BC from Ch. 00m-1000m. Salvage Cost 2783474.00 Road ID No. 201585020.b Improvement of Mongla Chatterhat More-Mongla Parikhali Road By BC from Ch. 00m-1820m with 5nos Drain Culvert. Salvage Cost 4164566.00 Road ID No. 201584107 under Mongla Upazila Bagerhat.
KBS-RIDP/BAGER/VR-56.1/18/e-GP/20241010/351291/00194320
|
Office of the Executive Engineer, LGED, Bagerhat |
৳২.৮২ কোটি |
২ সেপ ২০১৯ |
Completed |
|
a Improvement of Bhatkhali bazar - Sonakhali Azizia Madrasha Road via H/O Abu Mollik By BC from Ch. 495m-1000m. Salvage Cost 1106501.00 Road ID No. 201605152.b Improvement of A.B.Gazalia Bazer-Sonakhali bazar Road By BC from Ch. 00m-1000m with 3nos Drain Culvert. Salvage Cost 386993.00 Road ID No. 201604049 under Morrelgonj Upazila Bagerhat.
KBS-RIDP/BAGER/VR-44.1/19/e-GP/20241102/349485/00210403
|
Office of the Executive Engineer, LGED, Bagerhat |
৳১.৭২ কোটি |
২০ আগ ২০১৯ |
Completed |
|
Improvement of Chaterhat GC-Banshtola GC-Joymonirghol Baddamary Road by BC at Ch. 6670m-9270m Road ID No-201582006 Salvage Amount Tk. 2257877.00 under Mongla Upazila District Bagerhat
KDRIDP/Bager/W-117/2018-19/e-GP/20241104/342800/00211599
|
Office of the Executive Engineer, LGED, Bagerhat |
৳২.৫৮ কোটি |
১৭ জুলাই ২০১৯ |
Completed |
|
Construction of 21.0m Long RCC Girder Bridge on Sharikkhali UP - Omur Jommadar bari via Nalbunia Govermment Primary School road at Ch 3500m Road ID 504874108
IBRP/Bar/Taltoli/Brg-01/e-GP/20241204/299703/00227588
|
Office of the Executive Engineer, LGED, Barguna |
৳১.৩৩ কোটি |
৭ এপ্রিল ২০১৯ |
Ongoing |
|
Improvement of Helenchabaria pond in Helenchabaria union/vill. aImprovement of Karaibaria Mosque Pond &b Conshuction of 0l Nos. Ghatla 4.00 X 8.00 m for Karaibaria Mosque Pond in/c Conecting.in Karaibaria Union/villalmprovement of Chaulapara GPS Pondb Construction of 0l Nos. Ghatla 4.00 X 8.00 m for Chaulapara GPS Pond in/c Conecting.in Chaulapara Union/villalmprovement of Angarpara Mosque PondbConstruction of 01 Nos. Ghatla 4.00 X 8.00 m for Angarpara Mosque Pond ir/c Conecting.in Angarpara union/villalmprovement of Pajravanga Mosque Pondb Construction of 01 Nos. Ghatla 4.00 X 8.00 m for Pairavagra Mosque Pond in Pajravanga union/vill lmprovement of Chotovijora Salehia Madrasa Pond in Chotovijora union/villalmprovement of Nalbunia Agapara GPS Pondb Construction of 01 Nos. Ghatla 4.00 X 8.00 m for Nalbunia Agapara GPS Pond ir/c Conectine in Nalbunia union/vill and Improvement of Tatipara Chairman Bazar Pond in Tatipara union/vill. under Taltali Upazila Dist Barguna
IPCP/BARGU/TALTA/ P/18-19/3.01/e-GP/20241208/282391/00230021
|
Office of the Executive Engineer, LGED, Barguna |
৳৬৩.১৮ লাখ |
৭ ফেব ২০১৯ |
Completed |
|
Improvement of Kholpatua GC - Douatola GC - Mathbaria RHD Kholpatua GC - Jafrakhali bridge Road from Ch. 1500m - 6147m under Bamna Upazila District Barguna Road ID- 504192005 Salvage amount Tk. 706228.00
DIRIP-2/UZR/BC-02/Barguna/2018-19/e-GP/20241208/229720/00230013
|
Office of the Executive Engineer, LGED, Barguna |
৳৫.০২ কোটি |
২০ নভে ২০১৮ |
Completed |
|
Improvement of Karamothpur Bus Stand-Kazirhat via H/O Mokbul Road by BC from Ch. 00.00m-3360.00m under Patharghata Upazila District Barguna. Road ID-504854030 Salvage 22286.00.
DIRIP-2/VR/BC-03/Barguna/2017-18/e-GP/20241208/208016/00230028
|
Office of the Executive Engineer, LGED, Barguna |
৳৩.৮৭ কোটি |
১ জুলাই ২০১৮ |
Completed |
|
Improvement of Nachnapara UP Hazi Mozahar Uddin RHD-Katakhali Bazar RHD via Fakir Hat & MKPS Road by BC from Ch. 00.00m-4100.00m under Patharghata Upazila District Barguna. Road ID-504853006 Salvage 261464.00.
DIRIP-2/UNR/BC-01/Barguna/2017-18/e-GP/20241208/174392/00230030
|
Office of the Executive Engineer, LGED, Barguna |
৳৩.২১ কোটি |
২০ মার্চ ২০১৮ |
Completed |
|
Improvement of GutabashaR&H-Masherkhal R&H via H/O Kudus Mia Road by BC from Ch. 00.00m-3260.00m under Patharghata Upazila District Barguna. Road ID-504854089 Salvage 5276721.00.
DIRIP-2/VR/BC-06/Barguna/2017-18/e-GP/20241208/174395/00230023
|
Office of the Executive Engineer, LGED, Barguna |
৳২.৭৯ কোটি |
২০ মার্চ ২০১৮ |
Completed |
|
Re-sectioning of Left Embankment of Little Jamuna River from Km.1.5000 to Km. 4.408 Total2908.00 meter in connection with Tulshiganga sub Project Protection of Cherchra village from Border River Erosion Project in Upazila Joypurhat Sadar District Joypurhat during the FY 2017-2018.
Joy/W-07/2017-2018/e-GP/20241205/174503/00229094
|
Joypurhat WD Division |
৳৩৬.০০ লাখ |
১২ মার্চ ২০১৮ |
Completed |
|
Improvement of Road on Mojidbaria Shahi Mosque-Baroi Khal via H/O Nur Islam Howlader road at Ch. 0.00m-1500.00m Under Mirjaganj District Patuakhali ID No 578764108
CCRIP/PATUA/GOB/VR/2017/W-44/e-GP/20241218/152089/00236650
|
Office of the Executive Engineer, LGED, Patuakhali |
৳১.৪১ কোটি |
১০ জানু ২০১৮ |
Completed |
|
Improvement of Amragachia Bazar- Kukua UP road from Ch. 5000-6150m including structure under Amtali Upazila District Barguna Road ID-504093021
IRIDPPB/BARG/ AMT/UNR-09/e-GP/20241208/133245/00230523
|
Office of the Executive Engineer, LGED, Barguna |
৳৯৫.৩৬ লাখ |
১৩ ডিসে ২০১৭ |
Completed |
|
Improvement Keorabunia UP-Coatbaria Bazar from Ch. 1600m-2600m under Barguna Sadar Upazila District Barguna including structure Road ID- 504283017 Salvage Cost Tk. 59264.00
IRIDPPB/BARG/ SADAR/UNR-04/e-GP/20241203/142563/00227016
|
Office of the Executive Engineer, LGED, Barguna |
৳৭৬.৬৭ লাখ |
২৯ নভে ২০১৭ |
Completed |
|
Improvement of Parirkhal GC-Babugonj GC Road Sonatala WAPDA road from Ch. 5660m-7430 including structure under Barguna Sadar Upazila District Barguna Road ID-504282006 Salvage Cost Tk. 57499.00
IRIDPPB/BARG/ SADAR/UZR-02/e-GP/20241203/142559/00226985
|
Office of the Executive Engineer, LGED, Barguna |
৳১.৪২ কোটি |
২৯ নভে ২০১৭ |
Completed |
|
Widening of Elaipur R&H-Bhangonparhat GC Road from Ch. 2858m - 6458m [Batiaghata] [Road Code: 247122002]
e-Tender/LGED/Khul/GOBM/16-17/W-35./e-GP/20241026/69825/00204415
|
Office of the Executive Engineer, LGED, Khulna |
৳১.৬৪ কোটি |
২৬ অক্টো ২০১৬ |
Completed |