Precautionary protective work along the Left bank of Jamuna River from km.2.800 to km. 3.450 = 650 m at Bachamara in C/W River Bank Protection Works at Bachamara, Bahadurpur and Dhulsura area to Protect from River Bank Erosion at Manikganj District under Mankiganj WD Division, BWDB, Manikganj during the FY- 2021-22 & 2022-23.
M-W-03/2021-22/e-GP/20221207/606524/0056003
|
Manikganj WD Division |
৳৭.৮৬ কোটি |
৭ সেপ ২০২১ |
Completed |
|
River Bank protective work for protection of Tarai-Bahadipur Road cum embankment in C/W the project of River bank protection project work for protection of Arjuna Area from erosion of Jamuna River in Bhuapur Upazila of Tangail District from km 5.590 to km. 5.890 300 m along the left bank of Jamuna river under Tangail O&M Division BWDB Tangail during the year 2019-20
PWA-18/2019-20./e-GP/20221207/391884/0056006
|
Tangail O&M Division |
৳১১.৩৫ কোটি |
১ ডিসে ২০১৯ |
Completed |
|
River Bank protective work for protection of Tarai-Bahadipur Road cum embankment in C/W the project of River bank protection project work for protection of Arjuna Area from erosion of Jamuna River in Bhuapur Upazila of Tangail District from km 5.890 to km. 6.190 300 m along the left bank of Jamuna river under Tangail O&M Division BWDB Tangail during the year 2019-20
PWA-19/2019-20./e-GP/20221207/391913/0056005
|
Tangail O&M Division |
৳১১.৩৬ কোটি |
১ ডিসে ২০১৯ |
Completed |
|
Bank protective work at the left bank of Rahmatkhali khal Adjacent to Kalir char from km. 4.600 to km. 5.100 500 m at Tomchar union in sadar Upazilla District Lakshmipur under Lakshmipur O & M Division BWDB Lakshmipur during the year 2018-2019.
Lax-W-01/2017-2018/e-GP/20221206/342187/0055934
|
Laksmipur O&M Division |
৳৫.৯৬ কোটি |
১১ জুলাই ২০১৯ |
Completed |
|
1 R-18028 Widening of RCC road start from Harinal Bazar To Shanghata Bridge ch0000-0960m. 2 R-19028 Improvement of road by WBMBC start from Titerkul road to south direction via Rajbagan to Baluchakuli connecting road ch0000-1000. 3 R20028 Reparing & Widening of Road Strat From Old Zelkhana via Hakkani Society to Shashan Road ch 0000-0516m. 4 R-21028 Widening of RCC road start from south Chayabithy Cokkor via house of Mozibor to Chayabithy society school and improvement of RCC road Fonirtek Dr. Ismael house road ch 0000-0475m. 5 R-22028 Reparing & widening of road strat from ckokkor via chayabitthy school to banggalgach mour ch 0000-0495m. 6 RD-11028 Construction Of RCC Drain strat from h/o mr.mozibur at south chayabithy of Socity School & Strat From Chokkor To Bangalgach mour via Fonirtek h/o Mr. Jaman ch 0000-0420m.7 R-23028 Reparing of BC road Strat From Rani Bilashmoni School Mour to West Side of Rajdhighi ch 0000-0505m. 8 R-24028 Reparing of road strat from pond of Zila Parishad via RothkholaMadhobbari Chokkor Zourpukur par to Shashan bridge ch 0000-2457m. 9 R-26028 Reparing of Buruda Muslimabad Road ch 0000-0600m. 10 RD-120028 Improvement of Road by BC of Lagalia Road ch 0000-1085m. 11 RD-13028 Construction Of RCC Drain At Lagalia Road ch 0000-1085m. 12 RD-25028 Construction Of RCC Drain strat from Kazi Azim Uddin College Road via modhapara 5 Five storoed Building to south direction to Chaybithy connecting Road ch 0000-0642m.13 RD-10028 Construction Of Rcc Drain strat from madhabbari mour to south direction to sadar hospital bridge ch 0000-0370m.
Zone-3/PW-05/e-GP/20221204/299522/0055688
|
Construction of Internal road, drain & footpath in zone 1 to 5 of Gazipur city corporation. |
৳২৭.৮২ কোটি |
২৮ মার্চ ২০১৯ |
Completed |
|
Surfacing work by Seal Coat including necessary repair at 29thP & 30thP K.M. of Bogra Jhopgari-Khetlal road Joypurhat portion road under Road Division Joypurhat during the year 2018-2019.
10/e-GP/EE/JRD/2018-2019./e-GP/20221203/225561/0055535
|
Joypurhat Road Division |
৳২০.৫৭ লাখ |
১৯ সেপ ২০১৮ |
Completed |
|
Construction of Class room of Uttar Maishadi Primary school. Horizontal 5 rooms
e-Tender/NBIDNNGPS/CHD/SAD/2017-18/W1.00307/e-GP/20231031/155263/00119757
|
Office of the Upazila Engineer, LGED, Chandpur Sadar, Chandpur |
৳৫৮.৫০ লাখ |
১৩ ফেব ২০১৮ |
Completed |
|
Construction of Class room of Dokkhin Kallyandi Community Primary school. Horizontal 3 rooms Vertical 2 rooms
e-Tender/NBIDNNGPS/CHD/SAD/2017-18/W1.00388/e-GP/20231101/155265/00120817
|
Office of the Upazila Engineer, LGED, Chandpur Sadar, Chandpur |
৳৬১.৮০ লাখ |
১৩ ফেব ২০১৮ |
Completed |
|
Periodic Maintenance of Dhamoirhat UP - Bharum Bazar Via Bihariagor from Ch. 2400-2920m .Road Code 164283017 Dhamoirhat
e-Tender/LGED/Nao/GOBM/17-18/W-83/e-GP/20221204/143316/0055603
|
Office of the Executive Engineer, LGED, Naogaon |
৳১২.৪৪ লাখ |
১১ ডিসে ২০১৭ |
Completed |
|
Periodic Maintenance of Ahsangonj GC- Naldanga GC Road from Ch. 00m-2265m.Road Code164032007 Atrai
e-Tender/LGED/Nao/GOBM/17-18/W-40/e-GP/20221204/133211/0055595
|
Office of the Executive Engineer, LGED, Naogaon |
৳৩০.০০ লাখ |
২০ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Shahagola Batalli RHD - Sutkigacha hat Road from Ch. 00m-1580m. Road Code164034032 Atrai
e-Tender/LGED/Nao/GOBM/17-18/W-39/e-GP/20221204/133210/0055594
|
Office of the Executive Engineer, LGED, Naogaon |
৳৩৮.৩৩ লাখ |
২০ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Adhaipur UP-Shurkali hat Road from Ch. 00m-2530m . RoadCode164063011 Badalgachi
e-Tender/LGED/Nao/GOBM/17-18/W-43/e-GP/20221204/133214/0055596
|
Office of the Executive Engineer, LGED, Naogaon |
৳৪২.০৬ লাখ |
২০ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Kaligram UP Ranjania - Bilkrisnopur hat - Bodla ghat road. from Ch. 00m-1665m .Road Code164854024 Raninagar
e-Tender/LGED/Nao/GOBM/17-18/W-54/e-GP/20221204/133225/0055600
|
Office of the Executive Engineer, LGED, Naogaon |
৳৩৪.৬৫ লাখ |
১৯ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Trimohani GC - Gona hat - Betgari GC Road. from Ch. 7300m-9350m .Road Code164852002 Raninagar
e-Tender/LGED/Nao/GOBM/17-18/W-51/e-GP/20221204/133222/0055598
|
Office of the Executive Engineer, LGED, Naogaon |
৳৩৮.৪৭ লাখ |
১৯ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Naogaon RHD-Fatepur GC Road from Ch. 1900m-5300m.Road Code164602003 Naogaon-S
e-Tender/LGED/Nao/GOBM/17-18/W-49/e-GP/20221204/133220/0055597
|
Office of the Executive Engineer, LGED, Naogaon |
৳৩৭.৬৬ লাখ |
১৯ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Vandargram hat Bogarbari Bazar - Nashratpur UP. Part from Ch. 00m-1930m. Road Code164853013 Raninagar
e-Tender/LGED/Nao/GOBM/17-18/W-52/e-GP/20221204/133223/0055599
|
Office of the Executive Engineer, LGED, Naogaon |
৳৩৫.৪০ লাখ |
১৯ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Fotepur R&H-Matajee GC from Ch. 2728m-3863m. Road Code164282004 Dhamoirhat
e-Tender/LGED/Nao/GOBM/17-18/W-56/e-GP/20221204/133227/0055602
|
Office of the Executive Engineer, LGED, Naogaon |
৳৪৩.৯২ লাখ |
১৯ নভে ২০১৭ |
Completed |
|
Periodic Maintenance of Belghoria hat - Bilkrisnopur hat Paroil UP Road from Ch. 7600m-10100m. Road Code164853014 Raninagar
e-Tender/LGED/Nao/GOBM/17-18/W-55/e-GP/20221204/133226/0055601
|
Office of the Executive Engineer, LGED, Naogaon |
৳৩৫.৬৬ লাখ |
১৯ নভে ২০১৭ |
Completed |
|
Construction of Nandon khali Drainage cum Flushing Regulator (3V-1.50mx1.80m) at km 24.497 of embankment in Polder No. 31(Part) of "Blue Gold Program" under Khulna O&M Division-2, BWDB, Khulna during the year 2016-2017 & 2017-2018 (Package No. e-T/01/KHU2/BLUE GOLD/P-31(P)/2016-17)
e-T/01/KHU2/BLUE GOLD/P-31(P)/2016-17/e-GP/20221207/66822/0055937
|
Khulna O&M Division-2 |
৳২.২৫ কোটি |
২৫ সেপ ২০১৬ |
Completed |
|
Temporary Protective Work on the right bank of old Dhaleswari River from Km. 0.310 to Km. 0.620 = 310.00 Meter at jabra Durga Mondir,Mosque,High School,Primary School, Land office and its adjacent area near at Jabra in Upazilla Gheor,District:Manikganj under Non-Development Revenue Budget during the year 2015-16.
NDR-MAN-04/2015-16/e-GP/20231128/48821/00143100
|
Manikganj WD Division |
৳৯৫.৭৫ লাখ |
২২ ফেব ২০১৬ |
Completed |