|
Construction of Boundry wall under Habiganj O&M Division BWDB Habiganj during the year 2021-2022.
Habi/NDR/W-11/2021-2022/e-GP/20231118/682104/00129935
|
Habiganj O&M Division |
৳৫.৩০ লাখ |
৬ এপ্রিল ২০২২ |
Completed |
|
Repair Maintenance of Ansar Barrac and others at Shayestanagar colony under Non-Development revenue Budget under Habiganj O&M Divison BWDB Habiganj during the year 2021-2022.
Habi/NDR/W-14/2021-2022/e-GP/20231118/682103/00130038
|
Habiganj O&M Division |
৳৩.৪৯ লাখ |
৬ এপ্রিল ২০২২ |
Completed |
|
Repair and maintenance of residential building, Inspection Bungalow and others building of Bhola O&M Division-1, BWDB, Bhola during the year 2021-22.
NDR/BHL-1/21-22/W-14/e-GP/20230119/656600/0061428
|
Bhola O&M Division-1 |
৳১৯.৭৯ লাখ |
৮ ফেব ২০২২ |
Completed |
|
Dredging work by cutter suction dredger including dredging related works for Developing Navigability of Mohanganj-Nalitabari River Route.
Mohanganj-Nalitabari Dredging/e-GP/20230119/543029/0061427
|
Office of the Additional Chief Engineer2 (Civil), Dredging Department, Dhaka. |
৳১০.৮৫ কোটি |
১৪ ফেব ২০২১ |
Completed |
|
Improvement of Rotnapalong UP Office Coat Bazar -Valukhiya bazar Road Valukhiya Sea Beach Rd by BC at Ch 00-4300 mID422943001 & Rotnpalong UP Office-Chakbaita Bazar via Goyalmara RdYousuf Ali Rotnapalong Karaibunia Roadby BC at Cy-00-4435mID422943004Under Ukhiya Upazila.Dist Coxs Bazar. Salvage value Tk. 1415528.00
EAP/LGED/OCB-N/W4D/e-GP/20231218/402686/00155229
|
Office of the Executive Engineer, LGED, Cox'sbazar |
৳১১.৯৯ কোটি |
১৫ জানু ২০২০ |
Ongoing |
|
Improvement of Hajirpaa Mukter Swdagor Bari-Dakhin Faliapara Sajahan bari Road By BC at Ch00- 2400m Road ID-422945114 Malercul LGED Road - Dakhin Faliapara Road By BC at Ch 00-814m Road ID-422945112 & Ali Mohammed Pingir Road By BC at Ch 00-2327m Road ID-422944037 & Tuturbill Gonarpara Rd. by BC at Ch. 00-1830m Road ID 422945065 under Ukhiya upazila Dist Coxs Bazar. Salvage value-Tk. 3551173.00
EAP/LGED/OCB-N/ W4C/e-GP/20231218/402685/00155225
|
Office of the Executive Engineer, LGED, Cox'sbazar |
৳১৯.২১ কোটি |
১৫ জানু ২০২০ |
Ongoing |
|
Construction and Re-Construction of Storm Water Drainage Network on Primary Canal -02 from Camp 20 Extension Chainage 5800m to Naf River Outlet 000m Under Ukhiya Upazila Dist CoxsBazar.
EAP/LGED/OCB-N/W21/e-GP/20230121/343535/0061458
|
Office of the Executive Engineer, LGED, Cox'sbazar |
৳১০.৭৫ কোটি |
৫ আগ ২০১৯ |
Completed |
|
Rehabilitation of khayer hat- Joyer hat-Borhanuddin-Ranijong Banglabazar Road from Ch. 5550m-8550m. 509212007
e-Tender/LGED/BHOLA/GOBM/18-19/W-23/e-GP/20230121/322988/0061453
|
Office of the Executive Engineer, LGED, Bhola |
৳১.৪৩ কোটি |
৩০ মে ২০১৯ |
Completed |
|
a Re-habilitation of Ewaspur UP office -Goaldarhat -Belayet Chowkidar More Road from Ch.00-3350m 509253046 b Re-habilitation of Betua RHD Launchghat -Char Aicha GC via Chairman Bazar Road from Ch 17000m-19100m 509252007
e-Tender/LGED/BHOLA/GOBM/18-19/W-21/e-GP/20230119/292947/0061440
|
Office of the Executive Engineer, LGED, Bhola |
৳১.৯০ কোটি |
১০ মার্চ ২০১৯ |
Completed |
|
Re-habilitation of Kashemgonj bazar Jahanpur UP.HQ WDB EmbkmRoad from Ch. 4100m-9100m Charfassion ID 509253003
e-Tender/LGED/BHOLA/GOBM/18-19/W-20/e-GP/20230121/292946/0061456
|
Office of the Executive Engineer, LGED, Bhola |
৳১.৫৮ কোটি |
১০ মার্চ ২০১৯ |
Completed |
|
A. Rehalitation of Hazaiirhat-Launch Ghat-Fakir Hat-Anondobazar Bangla Bazar GC-Taltoli Bazar Road From Ch. 7807-8604m Under Monpura Upazila Dist. Bhola ID 50965200 B. Rehalitation of Hazaiirhat-Launch Ghat-Fakir Hat-Anondobazar Bangla Bazar GC-Taltoli Bazar Road From Ch. 00-1672m Under Monpura Upazila Dist. Bhola ID 50965200. C. Rehalitation of Hazaiirhat UP-Nayerberhat Road From Ch. 00-2450m Under Monpura Upazila Dist. Bhola ID 509653003
FDR/Bho/18-19/UZR/W57.W.58 & UNR/W 59/e-GP/20241225/282459/00239816
|
Office of the Executive Engineer, LGED, Bhola |
৳১.৭৯ কোটি |
১০ ফেব ২০১৯ |
Completed |
|
a Rehabilitation of Madraj UP Karamotgonj Bazar Notun Mosjid - South way of Samraj Bazar Road from Ch. 00-2480m under Charfassion upazila District- Bhola. ID No- 509254109b Rehabilitation of Haju rarir Mill - Batua RHD Ucha Pool via Jainpuri Khanka. Old Name kasemganj - East side of Madraj Beribadh Road 4076 from Ch. 00-1800m under Charfassion upazila District- Bhola. ID No- 509254169c Rehabilitation of Madraz UPC Karmatgong Bazar - Abugonj Bazar via Khaspukur Char Afzal GPS Batua RHD & Aslampur UP Office Ch. 00-2450m under Charfassion upazila District- Bhola. ID No- 509253018
FDR/Bho/18-19/ VR/W51-W53/e-GP/20230122/282462/0061466
|
Office of the Executive Engineer, LGED, Bhola |
৳১.৯৫ কোটি |
১০ ফেব ২০১৯ |
Completed |
|
a Rehabilitation of Jahanpur UPC Bhasir Don Bazar - Vasanchar Closur Bazar via Farajir Hat Kalerhat Road from Ch 2960m - 7256m Under Charfassion Upazila District Bhola ID 509253022b Rehabilitation of Jahanpur UPC Bhasir Don Bazar - Vasanchar Closur Bazar via Farajir Hat Kalerhat Road from Ch 7256m - 12054m Under Charfassion Upazila District Bhola ID 509253022c Rehabilitation of Omorpur UP Office Bhuyar Hat - RHD Halipad via Kaliakandi GPS Old Name Alsampur UPC Border - Osmangonj Berry Bandh road at Ch. 4072m. from Ch 00m - 2000m Under Charfassion Upazila District Bhola. ID 509253026
FDR/Bho/18-19/ VR/W48 -50/e-GP/20230122/282461/0061465
|
Office of the Executive Engineer, LGED, Bhola |
৳৩.৮৬ কোটি |
১০ ফেব ২০১৯ |
Completed |
|
Rehabilitation of Hazarigonj Old Berry Ghat - Batua RHD Oli Dafader Bari via daser hat & HindupallyOld NameHazarigonj Berry Bandh- N/Side of Aslampur Road 3057 from Ch. 00-4000m Under Charfassion Upazila District Bhola. ID 509253057Rehabilitation of Osmanganj UPC - Kashem miarhat via Pangashia Bazar Road from Ch. 00-2014m Under Charfassion Upazila District Bhola. ID 509253015Rehabilitation of Charfession Forest office - Omorpur UP Bhuierhat -Abugonj Katabunia GPS. from Ch. 4850-9450m Under Charfassion Upazila District Bhola. ID 509253005Rehabilitation of Awaspur UP RHD - West way of Fakir hat Kasmgonj BC Road Bazar Old Name- Madraj Berry Bandh to West Side Tatulia River Road.3056 from Ch. 00-2000m Under Charfassion Upazila District Bhola. ID 509253056
FDR/Bho/18-19/UNRW/34-37/e-GP/20230122/235084/0061467
|
Office of the Executive Engineer, LGED, Bhola |
৳৪.৬০ কোটি |
১১ অক্টো ২০১৮ |
Completed |
|
A1 Improvement By HBB of Bankerhat GC-Lahar Hat RHD via Char Chatkimara Bhola Sadar Portion Road. Ch00-480 & 2450-4550.00 m Under Veduria UP HBB Road Effective Length-2580m Road ID no. 5091820172 Construction of 3no. RCC 2.0mx2.0m Box Culvert on the same the road at Ch-2850m3225m & 3580mB1 Improvement of Ilisha RHD-Sonadugi Mosque Sogirer Dokan South East Ilisha-Mosraf Hossain Rari Bari-Ilih RHD Ch-00m-1610.00m Under East Ilisha Up Effective Length-1610m Road ID no. 5091840462 Construction of Palisaiding work on the same the road at Ch-150-1590m Effective Length-453.00m3 Construction of 6no. RCC 1.50mx1.50m Box Culvert on the same the road at Ch-270m400m587m722m.1087m & 1520m4 Construction of 6no. RCC 0.750mx0.750m Box Culvert on the same the road at Ch-672m762m987m1144m1210m & 1373m5 Construction of 2x4.50x4.50 Box Culvert on the same the road at Ch-985m
SA/R-248/e-GP/20230121/219797/0061455
|
Office of the Executive Engineer, LGED, Bhola |
৳৪.৮০ কোটি |
৩০ আগ ২০১৮ |
Completed |
|
Rehabilitation of RHD Junction Chadar Matha-Wapda Closer Bazar Road From Ch.2500-7000m and 7000m-10000.00m ID 509182008 Bhola-S
e- Tender /LGED/BHOLA/GOBM/18-19/W-01/e-GP/20230121/215783/0061457
|
Office of the Executive Engineer, LGED, Bhola |
৳২.৩৮ কোটি |
৩০ আগ ২০১৮ |
Completed |
|
Remaining work of 350m PC Girder Bridge on Road from Sultaner Kheyaghat -Maya River- Dular Hat Road at Ch 7300m of Charfassion Upazila under Bhola District
PD/CLBUURP/W282A/e-GP/20230121/172858/0061463
|
Office of the Executive Engineer, LGED, Bhola |
৳৪.৪০ কোটি |
২২ মার্চ ২০১৮ |
Completed |
|
Improvement of Betua RHD Road at Ch-00-695.0m Length-695.0m Road ID-509254147Construction of Palisading Work on Betua RHD Road at CH-00-695.0m Length-60.0mConstruction of 3.0m x 3.0m RCC Box Culvert on Betua RHD Road at CH-618.0mConstruction of 1.50m x 1.50m RCC Box Culvert on Betua RHD Road at CH-112.0m
CHA/R-141/e-GP/20241223/145611/00238736
|
Office of the Executive Engineer, LGED, Bhola |
৳৮১.২৯ লাখ |
১২ ডিসে ২০১৭ |
Completed |
|
Improvement of Road From Charfassion Dularhat Road Bat tala-Surudip Khal Road. at Ch-1000-2000m Length-1000.0m Road ID-509254203Construction of Palisading Work on Road From Charfassion Dularhat Road Bat tala-Surudip Khal Road. at CH-1000-2000m Length-182.0mConstruction of 5 no 0.75m x 0.75m RCC U Drain on Road From Charfassion Dularhat Road Bat tala-Surudip Khal Road. at CH- 1235m 1400m 1569m 1807m & 1973m.
CHA/R-134/e-GP/20241224/145607/00238976
|
Office of the Executive Engineer, LGED, Bhola |
৳৮১.৮৭ লাখ |
১২ ডিসে ২০১৭ |
Completed |
|
Improvement of Road From Betua RHD Lounch Ghat-Char Aicha GC Via Chairman Bazar Road at Ch-00-4000.0m Length-4000m Road ID-509252007
CHA/R-108/e-GP/20241224/145592/00239342
|
Office of the Executive Engineer, LGED, Bhola |
৳২.৩৪ কোটি |
১২ ডিসে ২০১৭ |
Completed |
|
Improvement of Anjur hat Road Zor-Moszid-Maya River Road at Ch-00-1000.0m Length-1000.0m Road ID-509255026Construction of Palisading Work on Anjur hat Road Zor-Moszid-Maya River Road at CH-00-1000.0m Length-128.0mConstruction of 2 no 1.50m x 1.50m RCC Box Culvert on Anjur hat Road Zor-Moszid-Maya River Road at CH-424.0m & 802.0mConstruction of 0.75m x 0.75m RCC U Drain on Anjur hat Road Zor-Moszid-Maya River Road at CH-115.0m
CHA/R-142/e-GP/20241223/145612/00238748
|
Office of the Executive Engineer, LGED, Bhola |
৳৭৯.১৯ লাখ |
১২ ডিসে ২০১৭ |
Completed |
|
Improvement of Road From Gazaria Shashibussion Road Keramot Ali Moszid-East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch-00-2075.0m Length-2075m Road ID-509254190Construction of Palisading Work on Gazaria Shashibussion Road Keramot Ali Moszid-East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch-811-835 R/S 825-834 L/S 2050-2070 R/S Length-53.0m.Construction of 5 no 0.75m x 0.75m RCC U Drain on Gazaria Shashibussion Road Keramot Ali Moszid-East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch- 294m 1210m 1323m 1453m & 1982m. Construction of 3.00m x 3.00m RCC box Culvert on Gazaria Shashibussion Road Keramot Ali Moszid-East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch- 824.00m.
CHA/R-117/e-GP/20241224/145601/00238951
|
Office of the Executive Engineer, LGED, Bhola |
৳১.৫২ কোটি |
১২ ডিসে ২০১৭ |
Completed |
|
Improvement of Road From Vhuter Khal-Mukharbanda Khal Near Farazi Bari Mazahar Ali Road at Ch-00-1125.0m Length-1125m Road ID-509254029Construction of Palisading Work on Vhuter Khal-Mukharbanda Khal Near Farazi Bari Mazahar Ali Road at Ch-233-271 L/S 978-993 L/S 1094-1101 R/S Length-60.0m.Construction of 7 no 0.75m x 0.75m RCC U Drain on Vhuter Khal-Mukharbanda Khal Near Farazi Bari Mazahar Ali Road at Ch- 58m 114m 235m 549m 755m 875m & 1058m.
CHA/R-118/e-GP/20241224/145602/00238958
|
Office of the Executive Engineer, LGED, Bhola |
৳৮৮.৯০ লাখ |
১২ ডিসে ২০১৭ |
Completed |
|
Improvement of Road From Kasemgonj Jalil Bapari Road 06 No Ward- West way of Mollah Bari Road at Ch-00-1200.0m Length-1200m Road ID-509255092Construction of Palisading Work on Kasemgonj Jalil Bapari Road 06 No Ward- West way of Mollah Bari Road at Ch- 5-42m R/S 46-76m R/S 78-112m B/S 112-141 R/S 412-427 R/S 438-451 R/S 473-495 R/S 618-630 R/S 696-717 R/S 803-853 R/S 914-939 R/S 943-955 R/S Length-334.0mConstruction of 6 no 0.75m x 0.75m RCC U Drain on Kasemgonj Jalil Bapari Road 06 No Ward- West way of Mollah Bari Road at Ch-242m 412m 473m 717m 824m & 1122m.Construction of 1.50m x 1.50m RCC box Culvert on Kasemgonj Jalil Bapari Road 06 No Ward- West way of Mollah Bari Road at Ch-100.0m.
CHA/R-113/e-GP/20241223/145595/00238738
|
Office of the Executive Engineer, LGED, Bhola |
৳১.০৯ কোটি |
১২ ডিসে ২০১৭ |
Completed |
|
Improvement of Road From Betua RHD Lounch Ghat-Char Aicha GC Via Chairman Bazar Road at Ch-4000-8000.0m Length-4000m Road ID-509252007
CHA/R-109/e-GP/20230121/145599/0061454
|
Office of the Executive Engineer, LGED, Bhola |
৳২.৩৪ কোটি |
১২ ডিসে ২০১৭ |
Completed |
|
Construction of Propsed 30.00m long PC Girder Bridge in Char Kukri-Mukri UP office Aminpur Bazar at Ch. 2655.00m under Charfession Upazila Dist Bhola ID No 509253042
CCRIP/BHOLA/GOB/BR/2017/W-50/e-GP/20230121/141709/0061464
|
Office of the Executive Engineer, LGED, Bhola |
৳২.৮৩ কোটি |
২৬ নভে ২০১৭ |
Completed |
|
A Maintenance of Bhola -charfession RHD Bangla Bazer-Dakshin Dighaldi UP via Santir Ch-2280m-2586m & 2720m-5870m. Road ID 509183015 BC Pavement.B Construction of Palisading Work on Bhola -charfession RHD Bangla Bazer-Dakshin Dighaldi UP via Santir at Ch-2375-2390m R/S 2760-2780m R/S 2808-2828m L/S 2847-2872m L/S 2908-2960m L/S 3157-3187m L/S 3250-3270m L/S 3550-3570m L/S 3630-3675m B/S 3960-3990m L/S 4060-4080m R/S 4140-4155m R/S 4515-4535m R/S 4490-4420m R/S 4550-5180m L/S 5640-5655m R/S 5710-5725m R/S 5730-5745m R/S. Road ID 509183015 Length 427m.C Construction of 2 nos 0.750m x 0.750m RCC Box Culvert at CH- 3430.00m 5210.00m & 1 nos 1.50m x 1.50m With-5.50m RCC Box Culvert at CH- 4270.00m on Bhola -charfession RHD Bangla Bazer-Dakshin Dighaldi UP via Santir hat &. Road ID 509183015.
SA/M-04/e-GP/20241222/98083/00238126
|
Office of the Executive Engineer, LGED, Bhola |
৳১.৩২ কোটি |
২৩ এপ্রিল ২০১৭ |
Completed |
|
Improvement of Santir hat - Moulobir hat - Khayer hat road .( Ch.00m -550m) ( ID 509215122)
IRIDP-2/ BHL/DW-35./e-GP/20241224/52195/00238876
|
Office of the Executive Engineer, LGED, Bhola |
৳২৯.০৫ লাখ |
৩১ মার্চ ২০১৬ |
Completed |