Repair & Maintenance work of Embankment (Breach Closing) in between km 38.000 to km 46.500 = 100.00 meter along the right bank of Nagor River in c/w Nagor Valley Sub-Project at Kashinagor Upazila Raninagar, District Naogaon under Naogaon O&M Division BWDB Naogaon during the FY-2022-2023.
OTM-07/2022-23/e-GP/20241019/819949/00198491
|
Naogaon O&M Division |
BDT 16.15 lakh |
18 Apr 2023 |
Completed |
|
Civil Repair & Maintenance work of Kashiabari Regulator at Atrai Upazila in Naogaon District C/W Raktadaha-Lohachura Beel Drainage Scheme under Naogaon O&M Division, BWDB, Naogaon during the FY 2022-2023.
OTM-11/2022-23/e-GP/20241017/819953/00198096
|
Naogaon O&M Division |
BDT 5.03 lakh |
18 Apr 2023 |
Completed |
|
Civil Repair, Painting & Greasing of Donoil 1 Vent, Dayodpur 1 Vent, Hapaniya 1 Vent, Aosthomatra 1 Vent, Boskhol1 Vent Regulator in c/w Badhalgashi FC Project in Upazila:-Badhakgashi under Naogaon O&M Division, BWDB, Naogaon during the FY-2022-2023.
OTM-08/2022-23/e-GP/20241019/819950/00198471
|
Naogaon O&M Division |
BDT 3.60 lakh |
18 Apr 2023 |
Completed |
|
Coloring, Greasing and Ancillary work of Srimathkhali 6 Vent Regulator and Obstacle in c/w Naogaon Polder-1 Sub Project in Upazila-Raninagar, District:- Naogaon under Naogaon O&M Division, BWDB, Naogaon during the FY-2022-2023.
OTM-05/2022-23/e-GP/20241019/819947/00198484
|
Naogaon O&M Division |
BDT 2.51 lakh |
18 Apr 2023 |
Completed |
|
Supplying of best quality Pea-gravel & Fire Wood at Meherpur RHD Stack Yard for maintenance of different roads under Road Division Meherpur during the year 2021-2022.
e-GP/MERD/18/2021-22/e-GP/20220731/701147/0028075
|
Meherpur Road Division |
BDT 10.10 lakh |
19 May 2022 |
Completed |
|
Supply of best quality 1st Class Brick, Sand (F.M.0.80), Road Marking Paint, Thiner, Enamel Paint, Terpin & Gunny Bags at Meherpur RHD Stack Yard for Maintenance of different roads under Road Division Meherpur during the year 2021-2022.
e-GP/MERD/17/2021-22/e-GP/20220731/701134/0028078
|
Meherpur Road Division |
BDT 15.53 lakh |
19 May 2022 |
Completed |
|
Repair & Maintenance of Cross Bundh Work length 300.00 m in between km.0.00 to km.3.040 under Buri Bundh irrigation Project in Upazilla Thakurgaon Sadar, Dist Thakurgaon Under Thakurgaon O & M Division, BWDB, Thakurgaon during the year 2021-2022.
Tha-RB-16/2021-2022/e-GP/20220928/673952/0045264
|
Thakurgaon O&M Division |
BDT 9.44 lakh |
15 Mar 2022 |
Completed |
|
Supplying of best & approved quality Pea-gravels, stone chips, Fire wood, Empty cement bag & Local sand for maintenance of different roads at RHD Salbagan Stackyard under RHD Road Division Rajshahi during the year 2021-2022.
e-GP/raj/21/2021-2022/e-GP/20220903/651568/0033392
|
Rajshahi Road Division |
BDT 34.03 lakh |
24 Jan 2022 |
Completed |
|
Tree Plantation work at various place of Thakurgaon District under Thakurgaon O&M Division during the FY 2021-2022.
Tha-RB-10/2021-2022/e-GP/20220928/649647/0045262
|
Thakurgaon O&M Division |
BDT 6.23 lakh |
20 Jan 2022 |
Completed |
|
Supplying of Stone Chips, Pea-Gravels, Sand & Fire Wood at Naogaon Stack Yard under Road Division, Naogaon during the year 2021-2022.
18/eGP/NRD/REV/2021-2022/e-GP/20220903/608962/0033389
|
Naogaon road Division |
BDT 17.15 lakh |
15 Sep 2021 |
Completed |
|
Bank protection work along the Left bank of the Nagor River (Border Embankment) from Km. 24.116 to Km. 24.266 equal 150.00m at Kathaldangi, Union: Gadura, upazila: Horipur, Dist. Thakurgaon under Thakurgaon O&M Division, BWDB, Thakurgaon.
Tha-RB-20/2020-21/e-GP/20220928/575333/0045269
|
Thakurgaon O&M Division |
BDT 29.65 lakh |
2 May 2021 |
Completed |
|
Rehabilitation Dashmina UZHQ-Boga GC UZR near Betagi Hat-Patabunia GC via Dhalu Fakirerhat Dashmina Part Road from Ch. 00m-1000m ID 578524121 under Dashmina Patuakhali.
LGED/Ptk/VRRP/Re-hab/20-21/W-1616/e-GP/20241218/569663/00236672
|
Office of the Executive Engineer, LGED, Patuakhali |
BDT 54.23 lakh |
21 Apr 2021 |
Completed |
|
Supplying best quality pakur stone chips Pea-gravels Brick Auto Machine made Local sand Domar sand Fire wood & synthetic bag at RHD Salbagan Stackyard under RHD Road Division Rajshahi during the year 2020-2021.
e-GP/raj/44/2020-2021/e-GP/20220903/561141/0033385
|
Rajshahi Road Division |
BDT 33.13 lakh |
23 Mar 2021 |
Completed |
|
Repair and Maintenance of superintending engineers Office building & Rest house and supplying of daily commodities for rest house under Thakurgaon O&M Division BWDB Thakurgaon during the year 2020-2021.
Tha-RB-19/2020-21/e-GP/20221114/558784/0053603
|
Thakurgaon O&M Division |
BDT 6.30 lakh |
16 Mar 2021 |
Completed |
|
Bank Protection work along the left bank of Nagor river from Km 24.266 to km 24.286 equal 20 m at Kathaldangi in Gedua union Upazila Horipur Dist. Thakurgaon under Thakurgaon O & M Division BWDB Thakurgaon during the year 2020-2021.
Tha-RB-12/2020-21/e-GP/20221114/558777/0053613
|
Thakurgaon O&M Division |
BDT 28.54 lakh |
15 Mar 2021 |
Completed |
|
Plantation at different places or Colony of BWDB Thakurgaon in Thakurgaon Dist. under Thakurgaon O & M Division BWDB Thakurgaon during the year 2020-2021.
Tha-RB-18/2020-21/e-GP/20221114/558783/0053612
|
Thakurgaon O&M Division |
BDT 8.91 lakh |
15 Mar 2021 |
Completed |
|
Construction of 10 Nos Outlet at right and left irrigation canal under Bhully Bundh Irrigation project in Upazila Thakurgaon sadar Dist Thakurgaon under Thakurgaon O & M Division BWDB Thakurgaon during the year 2020-2021.
Tha-RB-10/2020-21/e-GP/20221114/558775/0053614
|
Thakurgaon O&M Division |
BDT 8.45 lakh |
15 Mar 2021 |
Completed |
|
Construction of signboard at different structure of BWDB during the year 2020-21 under Rangpur O & M Division BWDB Rangpur.
NDR/Works-03/2020-21/e-GP/20220928/543194/0045258
|
Rangpur O&M Division |
BDT 4.39 lakh |
3 Feb 2021 |
Completed |
|
Supplying Sylhet Sand Local Sand 1st Class Bricks/ 1st class Picket Bricks/Jhama Bricks Stone Chips Pea Gravels & Fire Wood for Departmental Routine Maintenance works of Nawabganj Road Sub division under RHD Road division Nawabganj during the year 2020-2021.
egp/Naw/2020-2021/46/e-GP/20220903/542511/0033398
|
Nowabgonj Road Division |
BDT 28.43 lakh |
1 Feb 2021 |
Completed |
|
Supplying best quality pakur stone chips Pea-gravels Brick Local sand Domar sand Fire wood & synthetic bag at RHD Salbagan Stackyard Sub Division-1 under RHD Road Division Rajshahi during the year 2020-2021.
e-GP/raj/21/2020-2021/e-GP/20220903/527703/0033380
|
Rajshahi Road Division |
BDT 31.83 lakh |
17 Dec 2020 |
Completed |
|
a Repair and fitting fixing works for different regulators radial gate of rangpur canal. b Repair and refitting works with supply of gate and hoist for secondary and tertiary structure of rangpur canal under Teesta mechanical Division BWDB Dalia Nilphamari. during the financial year of 2020-21.
e-TenderMW-7/e-GP/20220326/524739/00543
|
Teesta Mechanical Division |
BDT 7.20 lakh |
15 Dec 2020 |
Completed |
|
a Repair and fitting fixing works for different regulators radial gate of dinajpur canal. b Repair and refitting works with supply of gate and hoist for secondary and tertiary structure of dinajpur canal under Teesta mechanical Division BWDB Dalia Nilphamari during the financial year of 2020-21.
e-TenderMW-8/e-GP/20220326/524740/00544
|
Teesta Mechanical Division |
BDT 7.20 lakh |
15 Dec 2020 |
Completed |
|
a Repair and fitting fixing works for regulators radial gate of teesta main canal. b Repair and refitting works with supply of gate and hoist for secondary and tertiary structure of teesta main canal under Teesta mechanical Division BWDB Dalia Nilphamari. during the financial year of 2020-21.
e-TenderMW-6/e-GP/20220326/524737/00545
|
Teesta Mechanical Division |
BDT 7.19 lakh |
15 Dec 2020 |
Completed |
|
Repair and Maintenance work of Check structure at km 2.150 of Right irrigation canal under Bhully Bundh Irrigation project in Upazila-Thakurgaon Sadar Dist.Thakurgaon under Thakurgaon O&M Division BWDB Thakurgaon during the year 2020-2021.
Tha-RB-04/2020-21/e-GP/20221114/524759/0053607
|
Thakurgaon O&M Division |
BDT 4.45 lakh |
13 Dec 2020 |
Completed |
|
Re-sectioning work 500.00m of Both dyke of Left irrigation canal in between km. 0.000 to km. 4.000 under Bhully Bundh Irrigation project in Upazila-Thakurgaon Sadar Dist.Thakurgaon under Thakurgaon O&M Division BWDB Thakurgaon during the year 2020-2021.
Tha-RB-03/2020-21/e-GP/20221114/524758/0053648
|
Thakurgaon O&M Division |
BDT 4.46 lakh |
13 Dec 2020 |
Completed |
|
Supply of P.J/1st class brick Stone chips Pea Gravels Local sand & Fi re woodat RHD stack Yard Nawabganj for Maintenance of Different Road work underNawabganj Road Division during the year 2020-2021.
egp/Naw/2020-2021/26/e-GP/20220903/513842/0033400
|
Nowabgonj Road Division |
BDT 16.55 lakh |
15 Nov 2020 |
Completed |
|
Emergency Repair of Boundary wall & Barbed Wire at Chourhash RHD Office Compound under Road Division Kushtia during the year 2020-2021.
e-GP/R/W-15/KURD/2020-2021/e-GP/20220920/500278/0038958
|
Kushtia Road Division |
BDT 10.04 lakh |
19 Oct 2020 |
Completed |
|
Re-excavation of khal/nala at different upazila under project area..
PD/PANASI/EGP/2020-21/WD-01/Lot-68/e-GP/20220308/495150/0060
|
PD office of Pabna Natore Sirajgonj Districts Irrigation Development through surface water Project. |
BDT 13.81 lakh |
20 Sep 2020 |
Completed |
|
Re-excavation of khal/nala at different upazila under project area..
PD/PANASI/EGP/2020-21/WD-01/Lot-91/e-GP/20220308/495174/0059
|
PD office of Pabna Natore Sirajgonj Districts Irrigation Development through surface water Project. |
BDT 12.66 lakh |
20 Sep 2020 |
Completed |
|
Railing on Divider at Ch.0000 to 0375 of Kushtia Trimohoni-Meherpur-Chuadanga-Jheanidah Road R-745 under Road Division Kushtia during the year 2020-2021.
e-GP/R/W-11/KURD/2020-2021/e-GP/20220920/495872/0038961
|
Kushtia Road Division |
BDT 12.61 lakh |
14 Sep 2020 |
Completed |
|
Repair & painting work of different Bridge/Culvert Railing & Post Km Post Guide Post of Bheramara-Daulatpur Road Z-7411 under Road Division Kushtia during the year 2020-2021.
e-GP/R/W-05/KURD/2020-2021/e-GP/20220920/493915/0038960
|
Kushtia Road Division |
BDT 8.67 lakh |
13 Sep 2020 |
Completed |
|
Supplying best & approved quality 1st class Auto Machine Made P/J bricks pea-gravels Fire wood Empty cement bag & local sand for maintenance of different road at RHD Shalbagan stackyard under RHD Road Division Raishahi During the year 2019-2020.
e-GP/raj/56/2019-2020/e-GP/20220313/458428/00174
|
Rajshahi Road Division |
BDT 19.21 lakh |
7 May 2020 |
Completed |
|
Supplying best & approved quality 1st class bricks/P.J bricks pea-gravels Fire wood Empty cement bag & local sand for maintenance of different road at RHD Shalbagan stackyard under RHD Road Division Rajshahi During the year 2019-2020.
e-GP/raj/52/2019-2020/e-GP/20220313/455088/00172
|
Rajshahi Road Division |
BDT 20.95 lakh |
21 Apr 2020 |
Completed |
|
Supplying of best quality Stone Chips Pea-gravels 1st Class Bricks Local Sand & Fire wood for Maintenance at Different Roads under Kushtia Road Division Kushtia RHD Stack Yard Chourhash during the year 2019-2020.
e-GP/R/G-05/KURD/2019-2020/e-GP/20220313/454689/00179
|
Kushtia Road Division |
BDT 16.48 lakh |
19 Apr 2020 |
Completed |
|
Earth filling and Palisiding work at 9th kmp Ch-8000 to 8065 of Bheramara GK Bandh 3no Bridge - Mirpur thana Road Z-7463 under Road Division Kushtia during the year 2019-2020.
e-GP/R/W-25/KURD/2019-2020/e-GP/20220313/454698/00180
|
Kushtia Road Division |
BDT 8.99 lakh |
19 Apr 2020 |
Completed |
|
Repair and maintenance of Protective work along the left bank of Sukh River at near Munsipara in Thakurgaon Pouro Area under Thakurgaon O&M Division during 2019-2020.
NDR-15/2019-2020/e-GP/20221114/451194/0053688
|
Thakurgaon O&M Division |
BDT 6.84 lakh |
25 Mar 2020 |
Completed |
|
Construction of 20 twenty Nos River Name Plate & 7seven Nos. Signboard of Completed Projects & 15 fifteen Nos. KM Post of Embankment & 1 one no. Billboard at Thakurgaon BWDB Colony under Thakurgaon O& M Division During the year 2019-2020.
NDR-06/2019-2020/e-GP/20221114/414036/0053659
|
Thakurgaon O&M Division |
BDT 9.35 lakh |
25 Feb 2020 |
Completed |
|
Bank Protection work along left bank from km 7.048 to km 7.128 equal 80.00m & along right bank from km 7.370 to km 7.400 equal 30.00m of Tirnoi River at Modhupur Mouza of 2 No. Charol Union in Upazila-Baliadanggi Dist-Thakurgoan under Thakurgoan O&M Division BWDB Thakurgoan during the year 2019-2020.
NDR-04/2019-2020/e-GP/20220928/401825/0045544
|
Thakurgaon O&M Division |
BDT 95.52 lakh |
22 Dec 2019 |
Completed |
|
Emergency Repair of Potholes & seal coat work for damaged pavement at Ch. 2300 to 2500 200.00m Ch. 2600 to 2850 250.00m & Ch. 3700 to 5100 1400.00m Total 1850.00m of Bheramara-Daulatpur Road Z-7411 under Road Division Kushtia during the year 2019-2020.
e-GP/R/W-02/KURD/2019-2020/e-GP/20220313/389158/00178
|
Kushtia Road Division |
BDT 25.04 lakh |
27 Nov 2019 |
Completed |
|
Re-Construclion of 01 No. RCC box culvert 2 x 6.00m Span. 500m Height at 2nd P0 km of Domar Boragari-Jaldhaka Vadurdargah Road Z-5704 under Road Division Nilphamari during the year 2019-2020
e-Gp-03/EE/RHD/Nil/2019-2020 PMP-B&C/e-GP/20220309/390127/0064
|
Nilphamari Road Division |
BDT 1.32 crore |
26 Nov 2019 |
Completed |
|
Supplying of best quality Stone Chips 1st class/ P.J bricks Pea-gravels Sand and Fire wood at RHD stack Yard Kushtia for Maintenance of different Roads under Road Division Kushtia during the year 2019-2020.
e-GP/Rev/G-01/2019-20/e-GP/20220313/366276/00177
|
Kushtia Road Division |
BDT 15.73 lakh |
2 Oct 2019 |
Completed |
|
Bank protection work along the right bank of the Kulic River from Km. 4.700 to Km.4.800 Length 100.00m at Dhakdaha in upazila Haripur Dist. Thakurgaon in c/w Border Rivers Bank Protection & Development Project Phase-2 under Thakurgaon O&M Division BWDB Thakurgaon. JRC No. 37/2016-17
BR-Tha 10/e-GP/20220928/354656/0045163
|
Thakurgaon O&M Division |
BDT 1.14 crore |
5 Sep 2019 |
Completed |
|
Carriage of 100 feet 1 x 100 feet single lane portable steel bridge PSB from RHD Sagorica stack yard Chittagong to divertion Dattapara Culvert Ch 22600m of Morelgonj Care Bazar- Mongla Z-7701 zilla Highway including lunching of carried bailey bridge under Road Division Bagerhat during the year 2018-2019.
22/e-GP/BRD/2018-19/e-GP/20220920/317567/0038951
|
Bagerhat Road Division |
BDT 4.40 lakh |
12 May 2019 |
Completed |
|
Supplying of best quality Stone Chips Pea-gravel Sand F.M.0.80 & fire wood at Meherpur RHD Stack Yard for maintenance of different roads under Road Division Meherpur during the year 2017-2018.
e-GP Rev-18 /MERD/2018-19 /e-GP/20240103/317335/00158529
|
Meherpur Road Division |
BDT 25.47 lakh |
12 May 2019 |
Completed |
|
a Improvement of Jainpuri hujurs khanka at Chiknikandi under Galachipa Upazila Patuakhali458. b Construction of Boundary wall around Gazi bari Eidgah at Gajalia under Galachipa Upazila Patuakhali465.
875/08-11-2018/036/e-GP/20241223/314652/00238550
|
Zila Parishad, Patuakhali |
BDT 4.28 lakh |
8 May 2019 |
Completed |
|
a Construction of Ghatla in the pond of Universal Radha-Gobinda Temple at Ward1 Kalagasia under Galachipa Upazila Patuakhali444. b Improvement of road from Patabunia WDB Road to Patabunia Govt. Primary School Ratondi Taltoli under Galachipa Upazila Patuakhali454.
875/08-11-2018/035/e-GP/20241223/314651/00238553
|
Zila Parishad, Patuakhali |
BDT 2.38 lakh |
8 May 2019 |
Completed |
|
a Construction of Passenger Shed for Rcksaw stand at Ward7 under Baufol Pourasava Patuakhali356. b Improvement of 1st floor slab of Baro Sikdaria Jame Mosque Gulithamouj under Baufol Upazila Patuakhali361. c Construction of Ghatla at the pond of Rahim Payada bari mosque ward7 Naomala under Baufol Upazila Patuakhali367.
875/08-11-2018/030/e-GP/20241223/314646/00238547
|
Zila Parishad, Patuakhali |
BDT 3.90 lakh |
8 May 2019 |
Completed |
|
Repair of damaged pavementdue to heavy traffic volume by aggregate base type-IIcarpeting and seal coat work at 1stP2nd P3rdP4th and 5th P km of Boragari-Khoksharghat-Dimla roadZ-5054 under Road Division Nilphamari during the year 2018-2019.
Egp-29/NRD/2018-2019/e-GP/20220310/312903/0094
|
Nilphamari Road Division |
BDT 40.67 lakh |
29 Apr 2019 |
Completed |
|
Carpeting and Seal Coat work with repair at 456thP and 457thp km of Dhaka Mirpur-Utholi-Paturia-Notakhola-Kashinathpur-Bogra-Rangpur-Beldanga-Banglabandha N-5 Boda-Panchagarh portion Road under Road Division Panchagarh during the year 2018-2019.
eGP/15/EE/PRD/2018-2019/e-GP/20220920/310735/0039069
|
Panchagarh Road Division |
BDT 18.69 lakh |
23 Apr 2019 |
Completed |
|
Repairing of seal coat by carpeting method and road embankment work at 1st P 2nd and 3rd p km of panchagarh sugarmill- banghari- mareya-shaldanga- debigonj road Z-5021 under road division panchagarh during the year 2018-2019
eGP/16/EE/PRD/2018-2019/e-GP/20220920/310741/0039071
|
Panchagarh Road Division |
BDT 34.28 lakh |
23 Apr 2019 |
Completed |